ADTRAN SLC-5 U-BR1TE III - Manuals

ADTRAN SLC-5 U-BR1TE III – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14

Summary

Page 2 - Features

Section 61102040L4-5, Issue 2 61102040L4-5B 2 • Loopback release in response to TIPs generated from the network direction per TR62310. • Remap all subsequent DS0 DP loopback codes into respective eoc loopbacks to loopback respective downstream U-Repeaters, TRISDNelements, and U-BR1TES when optioned ...

Page 3 - Warranty and Customer; N O T E; • A U-BR1TE III provisioned as 2B+D cannot be; Table 1; lists the options to set for the U-BR1TE III.; Examples; II; Table 1. SLC-2000 CIT Provisioning Options; BRI = Basic Rate Interface

Section 61102040L4-5, Issue 2 61102040L4-5B 3 C A U T I O N C A U T I O N ! SUBJECT TO ELECTROSTATIC DAMAGE OR DECREASE IN RELIABILITY. HANDLING PRECAUTIONS REQUIRED. The U-BR1TE III will function with any ISDN 2B1QU-interface that is ANSI T1.601 compliant. 2. INSTALLATION After unpacking the unit, ...

Page 4 - See Figure 1; Figure 4; for SW1 and SW2 location.; Table 2; Figure 4. SW1 and SW2 Labeling

Section 61102040L4-5, Issue 2 61102040L4-5B 4 N O T E When the U-BR1TE III is optioned for B1 or B2,the SLC-2000 slot must be provisioned for Donly. If the U-BR1TE III is optioned for 2B,then the SLC-2000 slot must be provisioned forB1+D. Physical Requirements The U-BR1TE III occupies one physical s...

ADTRAN Manuals