Powerware 208/120V - Manual

Powerware 208/120V

Powerware 208/120V – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
Page: / 72

Table of Contents:

  • Page 2 – Requesting a Declaration of Conformity
  • Page 3 – Special Symbols; RISK OF ELECTRIC SHOCK; − Observe the warning associated with the risk of electric shock; CAUTION: REFER TO OPERATOR’S MANUAL; − Refer to your operator’s manual for additional; Three−phase alternating current; Do not apply around or remove from hazardous live conductors.
  • Page 5 – Table of Contents; Introduction
  • Page 6 – Communication
  • Page 7 – Chapter 1
  • Page 9 – Safety Warnings; IMPORTANT SAFETY INSTRUCTIONS; This EMS−UGK contains
  • Page 10 – Consignes de sécurité; CONSIGNES DE SÉCURITÉ IMPORTANTES; C. Ne pas utiliser à proximité d’eau ou dans une atmosphère
  • Page 11 – Sicherheitswarnungen; WICHTIGE SICHERHEITSANWEISUNGEN
  • Page 12 – Advertencias de Seguridad; INSTRUCCIONES DE SEGURIDAD IMPORTANTES; C. No trabaje cerca del
  • Page 13 – Chapter 2; Inspecting the Equipment
  • Page 14 – Checking the Parts List; Verify that the following items are included with the EMS−UGK.; All models
  • Page 15 – Conduit box, left side; NOTE; Tools Required; To assemble the components, the following tools may be needed:
  • Page 16 – Installing the Hardware; To install the EMS−UGK on a wall:; Component
  • Page 17 – Figure 3. Mounting Template
  • Page 18 – Figure 4 shows the location of the two serial ports.; Card Cover Plate; Figure 4. Conduit Box Option; Optional but recommended.
  • Page 19 – Electrical Connections; To connect the wiring for the EMS−UGK:
  • Page 20 – Remove conduit box hole plugs as needed for conduit.; Table 2. Current Transformer Sizing; Branch CT; Table 3. Wire Tap Sizing; Blue
  • Page 21 – Table 4. Harness Sizing; Harness
  • Page 22 – Connection
  • Page 23 – Figure 7. Panel Detail (EMS−UGK−LV Model with Dual Panel Option Shown); Single Panel option only.; Input 2 / Panel 2 are covered with hole plugs.
  • Page 24 – Main input monitoring option only.; If installing dual panels, repeat Step 5 for the second panel.; Neutral; Figure 8. Main Input Harness Connections
  • Page 25 – 5A or 100A Split−Core Branch CT option only.; Coil and secure any excess cable away from other conductors.; Figure 9. Branch Circuit Harness Connections; If installing dual panels, repeat Step 6 for the second panel.
  • Page 26 – Subfeed Accessory only.; Subfeed Transition Harness; Figure 10. Subfeed Monitoring Connections
  • Page 27 – Choose an option for connecting the phases for voltage sensing:; unoccupied
  • Page 28 – Unoccupied three−phase branch circuit breaker connection only.; Breakers
  • Page 29 – Occupied three−phase branch circuit breaker connection only.; Wire Tap
  • Page 30 – Verify that the display on the front of the; Power LED; Figure 13. Power LED on the Power Xpert Gateway Series 1000 Card; Conduit Box option only.
  • Page 31 – Initial Configuration; Installing the Software Configuration Tool; To install the software configuration tool:
  • Page 32 – Initial System Configuration; Start
  • Page 33 – Feature Settings
  • Page 34 – Click the; EMS System Setting; Reload Sys Config
  • Page 35 – Don’t auto update; Reload Cal Data
  • Page 36 – Feature Setting; Reload Config
  • Page 37 – Disconnect
  • Page 38 – Panel Setting; Reload Panel Config
  • Page 39 – bold; Breaker Setting; Reload Breaker Config
  • Page 40 – Initial Panel and Breaker Configuration (Using the Display)
  • Page 42 – Advanced Metering Installation; Power Xpert Gateway Series 1000 Card Quick Start; Figure 16. Power Xpert Gateway Series 1000 Card
  • Page 43 – Chapter 3; Reset Function; Breaker Numbering; NEMA; Figure 17. Breaker Numbering
  • Page 44 – Control Panel Functions; Control Buttons for the LCD Menu Options; Figure 18. EMS−UGK Display; The following table shows the indicator status and description.; Indicator
  • Page 45 – Display Functions; EATON EMS−UGK; Unit Name; EMS; Figure 19. EMS−UGK Mimic Screen and Main Menu
  • Page 46 – Menu Map; The following tables show the basic menu structure.; Table 6. Menu Map for Display Functions; Main Menu
  • Page 47 – Table 7. Panel Meters; for critical alarms); Table 8. Breaker Meters
  • Page 48 – Setup Options; Table 9. Setup Options
  • Page 49 – Control Panel Configuration; Accessing Configuration
  • Page 50 – On the PANEL CONFIG screen, set the panel’s meter settings:; Default; When all panel configuration is complete, select the; Configuring Panels Containing Subfeed Breakers; From the main menu, select METER then PANEL.
  • Page 52 – Configuring Branch Circuit Breakers; To configure the branch circuit breakers (up to 42 per panel):
  • Page 54 – Viewing Panel Meters; Viewing Breaker Meters
  • Page 55 – Chapter 4; X−Slot card (Power Xpert Gateway Series 1000 Card)
  • Page 56 – Installing Communication Features; To install the communication options and control terminals:; Communication Options; Figure 21. Serial Port; Pin Number
  • Page 57 – Use the computer’s HyperTerminal; Table 11. Terminal Mode; Display; X−Slot Card
  • Page 58 – Control Terminals; Figure 22. External Control Terminal Connections
  • Page 59 – Programmable Signal Inputs (Building Alarms); The building alarm name; The notice level
  • Page 61 – Chapter 5; Recycling the Used Equipment; often for updates. You can download; Replacing the Power Xpert Gateway Series 1000 Card; Reinstall the card cover plate and front plate.
  • Page 62 – Rewiring and Reconfiguring the Installation; To rewire and reconfigure the EMS−UGK:
  • Page 63 – Chapter 6; Table 12. Dimensions and Weight; NOTE 1; Table 13. Communication Options
  • Page 64 – Table 14. Electrical Input; Installation Category III
  • Page 65 – Fully calibrated at the factory
  • Page 67 – Chapter 7; Typical Alarms and Conditions; Alarm or Condition; Service and Support; Local Distributor; Call your local service representative
  • Page 69 – Chapter 8; Limited Factory Warranty; Powerware Energy Management System (EMS) Upgrade Kit; LIMITED WARRANTY PERIOD:; WHAT THIS LIMITED WARRANTY DOES NOT COVER:; LIMITATION OF LIABILITY:
  • Page 70 – END−USER’S OBLIGATIONS:
Loading the manual

Powerware Energy Management System (EMS)
Upgrade Kit (208/120V, 380/220V, 400/230V, 415/240V)
User’s Guide

®

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Requesting a Declaration of Conformity

Requesting a Declaration of Conformity Units that are labeled with a CE mark comply with the following harmonized standards and EU directives: S Harmonized Standard: IEC 61010−1:2001−02 S EU Directives: 2006/95/EC, Council Directive on equipment designed for use within certain voltage limits2004/108...

Page 3 - Special Symbols; RISK OF ELECTRIC SHOCK; − Observe the warning associated with the risk of electric shock; CAUTION: REFER TO OPERATOR’S MANUAL; − Refer to your operator’s manual for additional; Three−phase alternating current; Do not apply around or remove from hazardous live conductors.

Special Symbols The following are examples of symbols used on the UPS or accessories to alert you to importantinformation: RISK OF ELECTRIC SHOCK − Observe the warning associated with the risk of electric shock symbol. CAUTION: REFER TO OPERATOR’S MANUAL − Refer to your operator’s manual for additio...

Page 5 - Table of Contents; Introduction

EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com i Table of Contents 1 Introduction 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Safety Warnings 3 . . . . . . . . . . ....

Other Powerware Models

All Powerware Other