Lennox EL296UH070XV36B - Installation Manual

Lennox EL296UH070XV36B

Lennox EL296UH070XV36B Heater – Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
Page: / 72

Table of Contents:

  • Page 2 – SUPPLY AIR; FRONT VIEW; Flue Condensate Trap Assembly; Model
  • Page 3 – DIRECT VENT INSTALLATION; Check equipment for shipping damage. If you find any; CAUTION; As with any mechanical equipment, contact with sharp; DANGER; There are circumstances in which odorant used with LP/
  • Page 4 – Furnace must be adjusted to obtain a temperature
  • Page 5 – Insufficient combustion air can cause headaches,
  • Page 6 – Do not install the furnace in a corrosive or contaminated; Unconfined Space; EQUIPMENT IN CONFINED SPACE - ALL AIR FROM INSIDE; Figure 4
  • Page 7 – Air from Outside; tion, the confined space shall be provided with two perma; EQUIPMENT IN CONFINED SPACE - ALL AIR FROM OUTSIDE; Figure 5; EQUIPMENT IN CONFINED SPACE; Figure 6; EQUIPMENT IN CONFINED SPACE; Figure 7; tion, the confined space must have two permanent open
  • Page 8 – of the total input rating of all equipment in the enclosure.; Figure 8; EQUIPMENT IN CONFINED SPACE -; NOTE-Each air duct opening shall have a free area of at least one; Figure 9; flexible legs and one rigid leg. The rigid leg is equipped; RIGID LEG; Installation - Setting Equipment; furnace. Doing so will adversely affect the operation of; WARNING; Upflow Applications; in the upflow position. Refer to Figure 12 for clearances.
  • Page 9 – SETTING EQUIPMENT; UPFLOW APPLICATION; SIDE VIEW
  • Page 10 – personal injury or death. Combustion and flue products; Installation Clearances; Return Air Guidelines; side of the furnace installed in an upflow application. If the; Side Return Air; Return
  • Page 11 – Removing the Bottom Panel; Screw; Removing the Bottom Pane; Remove the two screws that secure the bottom cap to the; Horizontal Applications; Front
  • Page 12 – Top; Suspended Installation of Horizontal Unit; floor joists, as shown in Figure 18, or install the furnace; HORIZONTAL SUSPENSION KIT; Bracket; Platform Installation of Horizontal Unit; finished space, install an an auxiliary drain pan
  • Page 13 – RAISED; Filters; IMPORTANT; frequently during the winter and the indoor coil to freeze; TABLE 1; This furnace is not certified for operation in heat; Supply Air Plenum; NOTE - Return air must not be drawn from a room
  • Page 14 – Solvent cements for plastic pipe are flammable liquids; PVC fittings in the unit.
  • Page 15 – Joint Cementing Procedure; Fumes from PVC glue may ignite during system check.
  • Page 16 – Venting Practices; * See Piping and Fittings Specifications table; Piping Suspension Guidelines; NOTE - Isolate piping at the point where it exits the outside wall or; Wall; Wall Thickness Guidelines
  • Page 17 – Vent Piping Guidlines; In Non-Direct Vent installations, combustion air is; Horizontal Installation Offset Requirements; Exhaust Pipe; TABLE 4; 5 ft. or 5 ft plus 2 elbows or; Two 45 degree elbows are the equivalent to one 90 degree elbow.
  • Page 18 – Piping Size Process; Do not use screens or perforated metal in exhaust or
  • Page 19 – TABLE 5; Maximum Allowable Intake or Exhaust Vent Length in Feet; Standard Termination at Elevation 0 - 4500 ft; Elbows; See concentric terminations next page.
  • Page 20 – TABLE 5 Continued; Both Intake and Exhaust must be same pipe size.; Concentric Termination at Elevation 0 - 4500 ft
  • Page 21 – Attic or Crawl Space For Intake Air in Feet; total vent length calculation
  • Page 22 – EXHAUST AND INTAKE; or; Exhaust; EXHAUST AND INTAKE; PIPE CONNECTIONS IN HORIZONTAL DIRECT OR
  • Page 23 – outdoors and flue gases are discharged outdoors.; UPFLOW NON−DIRECT; TYPICAL AIR INTAKE PIPE CONNECTIONS; HORIZONTAL NON−DIRECT VENT APPLICATIONS; from indoors or ventilated attic or crawlspace and flue; to the flooring or a platform. Ensure that the intake
  • Page 24 – General Guidelines for Vent Terminations; from indoors or ventilated attic or crawlspace and the flue
  • Page 25 – PP; PP; PVC; PP; PVC; PP; PVC; PP
  • Page 28 – DIRECT VENT ROOF TERMINATION KIT; Exiting Exhaust and Intake Vent; Inlet Air
  • Page 29 – TABLE 8; EXHAUST PIPE TERMINATION SIZE REDUCTION; MODEL; - A multiple furnace installation may use a group; FLUSH-MOUNT SIDE WALL TERMINATION KIT; DIRECT VENT CONCENTRIC WALL TERMINATION; Front View; optional intake elbow; DIRECT VENT APPLICATION
  • Page 31 – in TABLE 8.The specified pipe size ensures proper; NON-DIRECT VENT ROOF TERMINATION KIT; size must be done after the final elbow.; Crawl Space and Extended Horizontal Venting; da) to install 2” or 3” PVC exhaust piping through the floor; NON-DIRECT VENT APPLICATION; Venting In A Crawl Space; Basement Floor
  • Page 32 – CONDENSATE TRAP AND PLUG LOCATIONS; NOTE - In upflow applications where side return; Field Provided Drain Components; Do not use copper tubing or existing copper condensate
  • Page 33 – (Unit shown in upflow position with remote trap); To Drain; CONDENSATE TRAP LOCATIONS; PVC Pipe Only
  • Page 34 – When combining the furnace and evaporator coil; Condensate Trap With Optional Overflow Switch; Evaporator drain; Furnace with Evaporator Coil Using a Common Drain; (Unit shown in horizontal left−hand discharge position)
  • Page 36 – Gas Piping; If a flexible gas connector is required or allowed by the; be resistant to the actions of liquified petroleum gases.; Leak Check; an open flame to test for gas leaks. Check all connections
  • Page 38 – TABLE 9
  • Page 39 – Electrical; ELECTROSTATIC; Electrostatic discharge can affect; result in a fire, causing property damage, severe injury; INTERIOR MAKE-UP BOX INSTALLATION; BOX; Refer to Figure 60 for unit schematic and field wiring. See; Unit nameplate states maximum current draw.
  • Page 40 – Thermostat Selection; Field wiring for both communicating and non-; Indoor Blower Speeds; Communicating; Generator Use - Voltage Requirements
  • Page 42 – Optional Accessories for use with any Communicating System
  • Page 44 – DIP Switch Settings and Field Wiring; DIP Switch Settings and On-Board Links; switch 2 to set
  • Page 48 – EL296 Schematic Diagram
  • Page 49 – EL296 Units With Blower Drive
  • Page 50 – Integrated Control; /4” QUICK CONNECT TERMINALS
  • Page 51 – Seconds
  • Page 52 – Cooling Mode Blower Speed Ramping; OFF; Ramping Option B; Ramping Option C; Motor runs at 100% until demand is satisfied.; Motor runs at 100% until demand is satisfied.; OFF; Heating Mode Blower Speeds; that will result from different switch settings.; Continuous Blower Speed
  • Page 53 – Blower Data; HEATING
  • Page 54 – COOLING
  • Page 57 – Carefully review all configuration information provided.; OPERATING SEQUENCE; NO CALL FOR DEHUMIDIFICATION
  • Page 59 – BEFORE LIGHTING; GAS VALVE SHOWN IN ON POSITION; WHITE RODGERS GAS VALVE; When unit is initially started, steps 1 through; Turning Off Gas to Unit
  • Page 60 – To obtain accurate reading, shut off all other gas; Supply Pressure Measurement; Pressure test adapter kit (10L34) is available from
  • Page 61 – Proper Cumbustion; manifold pressure and gas flow rate before checking com; Mode; The maximum carbon monoxide reading should not exceed 100ppm.; High Altitude; In Canada, certification for installations at eleva; for the conversion procedure.; Orifice Kit
  • Page 62 – Repair Parts
  • Page 64 – HEATING OPERATION WITH TWO-STAGE THERMOSTAT; HEATING OPERATION WITH SINGLE STAGE THERMOSTAT
  • Page 65 – Service; Annual Furnace Maintenance
  • Page 66 – Winterizing and Condensate Trap Care; Turn off power to the furnace.; Cleaning The Burner Assembly; Turn off electrical and gas power supplies to furnace.
  • Page 67 – Program Unit Capacity/Size Mode; FINISHED
  • Page 68 – Requirements for Commonwealth of Massachusetts; back-up may be installed on the next adjacent floor level.; EXEMPTIONS: The following equipment is exempt
  • Page 69 – ADDENDUM FOR ALL PROVINCES OF CANADA; NOTE −
  • Page 71 – Line Voltage; UNIT SET UP; Flter
  • Page 72 – UNIT OPERATION
Loading the manual
Page 1

Page 1

INSTALLATION

INSTRUCTIONS

EL296UHV

507264-05

10/2021

Supersedes 08/2021

© 2021 Lennox Industries Inc.

Dallas, Texas USA

ELITE

®

SERIES GAS FURNACE

UP/FLOW HORIZONTAL AIR DISCHARGE

CAUTION

As with any mechanical equipment, personal injury can

result from contact with sharp sheet metal edges. Be

careful when you handle this equipment.

AIR FLOW

UPFLOW

AIR
FLOW

AIR

FLOW

HORIZONTAL RIGHT

HORIZONTAL LEFT

THIS MANUAL MUST BE LEFT WITH THE

HOMEOWNER FOR FUTURE REFERENCE

This is a safety alert symbol and should never be

ignored. When you see this symbol on labels or in man-

uals, be alert to the potential for personal injury or death.

WARNING

Improper installation, adjustment, alteration, service

or maintenance can cause property damage, personal

injury or loss of life. Installation and service must be

performed by a licensed professional HVAC installer or

equivalent, service agency, or the gas supplier.

NOTICE

A thermostat is not included and must be ordered

separately.
A communicating thermostat must be used in

communicating applications.
In non-communicating applications, the Lennox

ComfortSense® 7500 thermostat may be used, as well

as other non-communicating thermostats.
In all cases, setup is critical to ensure proper system

operation.
Field wiring for both communicating and non-

communicating applications is illustrated in diagrams,
which begin on Page 41.

Table of Contents

Unit Dimensions - inches (mm) ..................................... 2

Shipping and Packing List .............................................. 3

Safety Information .......................................................... 3

Use of Furnace as Construction Heater ......................... 4

General ........................................................................... 5

Shipping Bolt Removal ................................................... 8

Installation - Setting Equipment ...................................... 8

Filters ............................................................................ 13

Duct System ................................................................. 13

Pipe & Fittings Specifications

....................................... 14

Joint Cementing Procedure .......................................... 15

Venting Practices .......................................................... 16

Gas Piping .................................................................... 36

Electrical ....................................................................... 39

Integrated Control ......................................................... 50

Conventional Thermostat (non-communicating) ........... 51

Blower Data .................................................................. 53

On-Board Links............................................................. 57

Unit Start Up ................................................................. 59

Gas Pressure Adjustment ............................................. 60

Proper Combustion....................................................... 61

High Altitude ................................................................. 61

Combustion Air for Non-Direct Vent Applications ......... 62

Repair Parts.................................................................. 62

Other Unit Adjustments................................................. 63

Heating Sequence of Operation ................................... 63

Service.......................................................................... 65

Program Unit Capacity/Size Mode ............................... 67

Requirements for Commonwealth of Massachusetts ... 68

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Was this manual helpful?

About this manual

Brand
Lennox
Model
EL296UH070XV36B
Document type
Installation Manual
Category
Heater
Language(s)
English
Pages
72
Format
PDF

Summary

Page 2 - SUPPLY AIR; FRONT VIEW; Flue Condensate Trap Assembly; Model

Page 2 Unit Dimensions - inches (mm) AIR FLOW 6-9/16 (167) Left 9 (229) Right 23 (584) (19) 3/4 (19) 1 Bottom Return Air Opening GAS PIPING INLET (Either Side) Side Return Air Opening (Either Side) 1 Bottom Return Air Opening EXHAUST AIR OUTLET ELECTRICAL INLET (Either Side) SUPPLY AIR OPENING FRONT...

Page 3 - DIRECT VENT INSTALLATION; Check equipment for shipping damage. If you find any; CAUTION; As with any mechanical equipment, contact with sharp; DANGER; There are circumstances in which odorant used with LP/

Page 3 EL296UHV Gas Furnace The EL296UHV Category IV gas furnace is shipped ready for installation in the upflow or horizontal position. The fur - nace is shipped with the bottom panel in place. The bot- tom panel must be removed if the unit is to be installed in horizontal or upflow applications wi...

Page 4 - Furnace must be adjusted to obtain a temperature

Page 4 In order to ensure proper unit operation in non-direct vent applications, combustion and ventilation air supply must be provided according to the current National Fuel Gas Code or CSA-B149 standard. Installation Locations This furnace is CSA International certified for installation clearances...

Ask a question

Up to 3 photos. Max 5 MB each. Formats: JPG, JPEG, PNG, WebP.