Grindmaster AMW B-Series - Manual
Grindmaster AMW B-Series – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – FACTORY SETTINGS; Set each dispense head individually o
- Page 5 – User Lockout; User Lockout Jumper; Locked; Pin Version
- Page 6 – Programming for B-Series
- Page 7 – Model B-3 Dual Voltage Unit Shown
- Page 9 – Dual Voltage Unit Shown; Tank
- Page 10 – Deflector Spray
- Page 13 – TROUBLESHOOTING GUIDE; Error Messages
- Page 14 – Wiring Diagram
- Page 17 – Wiring Diagram - E Models
A M W B - S E R I E S
OPERATOR MANUAL
INSTALLATION
START UP PROCEDURE
WATER CONNECTION
The National Sanitation Foundation requires the following for an NSF approved water hook-up:
• A quick disconnect water connection or enough coiled tubing so that the machine can be moved for cleaning underneath.
• An approved backflow prevention device, such as a double check valve to be installed between the machine and water supply.
A 1/4” male flare adapter is provided. Installation to a water filter system is recommended to prevent lime and scale build-up in the machine.
• Water pipe connections and fixtures directly connected to portable water supply shall be sized, installed and maintained in accordance with
federal, state and local codes.
• Flush the water line to purge any debris from the supply line.
Connect a 1/4” pressurized water line to the 1/4” male connection
(on rear of brewer) and turn the water supply on.
a) Minimum water pressure to the machine: 30 psi
b) Maximum water pressure to the machine: 80 psi
NOTE: Single head machines may be used without a pressurized water
supply. (See Pour-Over Mode section)
ELECTRICAL CONNECTION
NOTE: Wiring connections should be performed by a qualified technician.
(Refer to serial tag to verify model number of your machine)
•
Remove front panel.
• Connect electrical service through rear of machine to terminal block
(inside front panel) marked L1, N, and L2. (See Figures A and B)
• On dual volt units, flip voltage switch (inside front panel next to terminal
block) to 120V for 120 Volt service or 240V for 120/208, or
120/240 Volt service. (See Figures A, B and table below)
• Re-install front panel.
• Turn on (plug-in) electrical service to brewer.
• Water tank will fill after a 7-second delay. The machine will make a
hissing sound when this occurs. On single head models, allow
approximately 1.5 minutes for the brewer to fill. On two head models, allow approximately five minutes for the brewer to fill.
NOTE: If water supply is inadequate or not connected, display will read “P-O” after 4 minutes of fill time (Refer to Pour-Over Mode
section). If Fill Cycle times out and display reads “P-O” before tank is full, turn unit OFF then ON again to reset and continue filling.
• The tank will begin heating slightly before machine fills.
• Turn brewer on by pressing ON/OFF switch in front of machine. (Light will illuminate)
• The brewer settings can be adjusted through the front touch pad. (Refer to Adjustments section)
• The water will be hot and the brewer will be ready to brew when “READY” light illuminates.
• Set Brew volume. (Refer to Setting Brew Volume section)
POWER REQUIREMENTS:
(Refer to serial tag for voltage to be supplied.)
Figure A
Figure B
For 120V, 15A or 20A Service
(2 Wire + Ground)
For 120/208-240V, 20A Service
(3 Wire + Ground)
L1
N
L2
L1
N
L2
C
ONNECT
N
EUTRAL
(N)
TO
M
IDDLE
C
ONNECT
H
OT
(L1)
TO
L
EFT
S
IDE
C
ONNECT
G
ROUND TO
S
CREW
C
ONNECT
H
OT
(L2)
TO
R
IGHT
S
IDE
C
ONNECT
N
EUTRAL
(N)
TO
M
IDDLE
C
ONNECT
H
OT
(L1)
TO
L
EFT
S
IDE
C
ONNECT
G
ROUND TO
S
CREW
O
N
D
UAL
V
OLT
U
NITS
,
F
LIP
S
WITCH TO
“120V”
O
N
D
UAL
V
OLT
U
NITS
,
F
LIP
S
WITCH TO
“120V”
Applied Volts
Models
Watts
Amps
NEMA Plug
Cord AWG
Connections
120
B-3, B-3WL, B-3WR
1800
15
5-15P, 5-20P for CUL
3X14
Hot to L1
Neutral to N
Ground to ground screw
B-SAP, B-ID
1780
14.9
120/208
B-3, B-3WL, B-3WR
2920
14.1
L14-20P
4X12
Hot to L1
Neutral to N
Hot to L2
Ground to ground screw
B-SAP, B-ID, B-DAP, B-DGP
2620
12.6
B-6
5110
24.6
L14-30P
4X10
B-DAP, B-DGP (30A)
4510
21.7
120/240
B-3, B-3WL, B-3WR
3800
15.9
L14-20P
4X12
Hot to L1
Neutral to N
Hot to L2
Ground to ground screw
B-SAP, B-ID, B-DAP, B -DGP
3500
14.6
B-6
6600
27.5
L14-30P
4X10
B-DAP, B-DGP (30A)
6000
25
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
FACTORY SETTINGS (for each dispense head) • Tank temperature is set at 200 degrees F. • Brew time is pre-set at 2:20. (Volume/time to be set on-site) • Pulse Brew is set for 1 pulse, 20 sec on, 20 sec off. • Warmer Energy Savings mode is set for 60-minutes. (“OFF” for models without warmers) • Low T...
User Lockout User Lockout is achieved via the position of the LOCK jumper on the board header. Locate the header on the board(shown below) and place the jumper in the desired position. In the Locked position all menus in this document are locked out, and the unit will only allow brewing or grinding ...