Grindmaster AMW B-Series - Manual

Grindmaster AMW B-Series

Grindmaster AMW B-Series – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
Page: / 24

Table of Contents:

  • Page 2 – FACTORY SETTINGS; Set each dispense head individually o
  • Page 5 – User Lockout; User Lockout Jumper; Locked; Pin Version
  • Page 6 – Programming for B-Series
  • Page 7 – Model B-3 Dual Voltage Unit Shown
  • Page 9 – Dual Voltage Unit Shown; Tank
  • Page 10 – Deflector Spray
  • Page 13 – TROUBLESHOOTING GUIDE; Error Messages
  • Page 14 – Wiring Diagram
  • Page 17 – Wiring Diagram - E Models
Loading the manual

A M W B - S E R I E S

OPERATOR MANUAL

INSTALLATION

START UP PROCEDURE

WATER CONNECTION

The National Sanitation Foundation requires the following for an NSF approved water hook-up:

• A quick disconnect water connection or enough coiled tubing so that the machine can be moved for cleaning underneath.

• An approved backflow prevention device, such as a double check valve to be installed between the machine and water supply.

A 1/4” male flare adapter is provided. Installation to a water filter system is recommended to prevent lime and scale build-up in the machine.

• Water pipe connections and fixtures directly connected to portable water supply shall be sized, installed and maintained in accordance with

federal, state and local codes.

• Flush the water line to purge any debris from the supply line.

Connect a 1/4” pressurized water line to the 1/4” male connection

(on rear of brewer) and turn the water supply on.

a) Minimum water pressure to the machine: 30 psi

b) Maximum water pressure to the machine: 80 psi

NOTE: Single head machines may be used without a pressurized water

supply. (See Pour-Over Mode section)

ELECTRICAL CONNECTION

NOTE: Wiring connections should be performed by a qualified technician.

(Refer to serial tag to verify model number of your machine)

Remove front panel.

• Connect electrical service through rear of machine to terminal block

(inside front panel) marked L1, N, and L2. (See Figures A and B)

• On dual volt units, flip voltage switch (inside front panel next to terminal

block) to 120V for 120 Volt service or 240V for 120/208, or

120/240 Volt service. (See Figures A, B and table below)

• Re-install front panel.

• Turn on (plug-in) electrical service to brewer.

• Water tank will fill after a 7-second delay. The machine will make a

hissing sound when this occurs. On single head models, allow

approximately 1.5 minutes for the brewer to fill. On two head models, allow approximately five minutes for the brewer to fill.

NOTE: If water supply is inadequate or not connected, display will read “P-O” after 4 minutes of fill time (Refer to Pour-Over Mode

section). If Fill Cycle times out and display reads “P-O” before tank is full, turn unit OFF then ON again to reset and continue filling.

• The tank will begin heating slightly before machine fills.

• Turn brewer on by pressing ON/OFF switch in front of machine. (Light will illuminate)

• The brewer settings can be adjusted through the front touch pad. (Refer to Adjustments section)

• The water will be hot and the brewer will be ready to brew when “READY” light illuminates.

• Set Brew volume. (Refer to Setting Brew Volume section)

POWER REQUIREMENTS:

(Refer to serial tag for voltage to be supplied.)

Figure A

Figure B

For 120V, 15A or 20A Service

(2 Wire + Ground)

For 120/208-240V, 20A Service

(3 Wire + Ground)

L1

N

L2

L1

N

L2

C

ONNECT

N

EUTRAL

(N)

TO

M

IDDLE

C

ONNECT

H

OT

(L1)

TO

L

EFT

S

IDE

C

ONNECT

G

ROUND TO

S

CREW

C

ONNECT

H

OT

(L2)

TO

R

IGHT

S

IDE

C

ONNECT

N

EUTRAL

(N)

TO

M

IDDLE

C

ONNECT

H

OT

(L1)

TO

L

EFT

S

IDE

C

ONNECT

G

ROUND TO

S

CREW

O

N

D

UAL

V

OLT

U

NITS

,

F

LIP

S

WITCH TO

“120V”

O

N

D

UAL

V

OLT

U

NITS

,

F

LIP

S

WITCH TO

“120V”

Applied Volts

Models

Watts

Amps

NEMA Plug

Cord AWG

Connections

120

B-3, B-3WL, B-3WR

1800

15

5-15P, 5-20P for CUL

3X14

Hot to L1
Neutral to N
Ground to ground screw

B-SAP, B-ID

1780

14.9

120/208

B-3, B-3WL, B-3WR

2920

14.1

L14-20P

4X12

Hot to L1
Neutral to N
Hot to L2
Ground to ground screw

B-SAP, B-ID, B-DAP, B-DGP

2620

12.6

B-6

5110

24.6

L14-30P

4X10

B-DAP, B-DGP (30A)

4510

21.7

120/240

B-3, B-3WL, B-3WR

3800

15.9

L14-20P

4X12

Hot to L1
Neutral to N
Hot to L2
Ground to ground screw

B-SAP, B-ID, B-DAP, B -DGP

3500

14.6

B-6

6600

27.5

L14-30P

4X10

B-DAP, B-DGP (30A)

6000

25

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - FACTORY SETTINGS; Set each dispense head individually o

FACTORY SETTINGS (for each dispense head) • Tank temperature is set at 200 degrees F. • Brew time is pre-set at 2:20. (Volume/time to be set on-site) • Pulse Brew is set for 1 pulse, 20 sec on, 20 sec off. • Warmer Energy Savings mode is set for 60-minutes. (“OFF” for models without warmers) • Low T...

Page 5 - User Lockout; User Lockout Jumper; Locked; Pin Version

User Lockout User Lockout is achieved via the position of the LOCK jumper on the board header. Locate the header on the board(shown below) and place the jumper in the desired position. In the Locked position all menus in this document are locked out, and the unit will only allow brewing or grinding ...

Page 6 - Programming for B-Series

Other Grindmaster Models

All Grindmaster Other