Grindmaster P400ESHP - Manual
Grindmaster P400ESHP – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Installation; Standard; WA R N I N G
- Page 3 – Warning Labels; Located on front splash panel and lid of machine.; CAUTION; Located near warmer plates.
- Page 5 – Adjustments; Brew Volume, Brew Timer; Before making the timer adjustment, do the following:; Adjusting the Timer; Standard single batch timer:; Electrical Shock Hazard!
- Page 7 – To Adjust the Bypass:; Thermostat Adjustment; Standard Mechanical Thermostat:
- Page 9 – Cleaning; Dispose of grounds and rinse brew basket.
- Page 10 – Urn cleaners that have been used successfully:; Service; common service tasks
- Page 12 – Replace level control.
- Page 13 – Problem
- Page 14 – Brewing Problems
- Page 15 – Parts Illustration for Models P300E & P400E; Item; FRONT
- Page 16 – Parts Illustration for Model P400ESHP
- Page 17 – Parts Illustration for Model RAP400E
- Page 18 – Parts Illustration for Model RAPS400E
- Page 19 – Parts Illustration for Model VSB-400
- Page 20 – Parts Illustration for Shuttle CS-LL; FAUCET MODEL ES; GAUGE ASSEMBLY
- Page 29 – Wiring Diagram for P300E/P400E, with 1 Batch Timer
- Page 30 – Wiring Diagram for P300E/P400E, with 2 Batch Timer
- Page 33 – Wiring Diagram for P-400ESHP
Shuttle Brewer & Airpot/Shuttle Brew ers
Operation and Instruction Man u al
For Models P300E, P400E, P400ESHP, RAP300E,
RAP400E, RAPS300E, RAPS400E
Installation:
See rough-in drawings in this manual for di men sions and lo ca tions of
electric and water input.
Set-Up/Position
1) Remove the brewer from the packing material and attach its legs.
2) Position the brewer on a strong, stable table or counter. Check
the level front to back and side to side. Adjust the legs to the cor-
rect level.
IMPORTANT:
THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE
FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS
MEET THE RE QUIRE MENTS OF THE NATIONAL ELECTRIC
CODE, NATIONAL PLUMBING CODE, AND ANY LOCAL
ORDINANCES.
The electric and water hook-up locations are behind the front pan el.
Re move the four screws fastening this panel for access to these
con nec tions.
Table of Contents
Installation and Start-up ....................................... 1-2
Warning Labels ...........................................................3
Operation .......................................................... 4
Adjustments ........................................................ 5-8
Care and Cleaning ............................................... 9-10
Service ............................................................... 10-11
Troubleshooting
Filling Problems ................................... .... 12
Heating Problems ................................. 13
Brewing Problems ................................ 14
Parts Illustrations
Models P300E & P400E ....................... 15
Model P400ESHP .....................................16
Model RAP400E ..................................... 17
Model RAPS400E ................................... 18
VSB-400................................................ 19
Shuttle CS-LL .......................................... 20
Rough-In Drawings
Model P300........................................................... 21
Model P400 & P400ESHP ...................... 22
Model RAP300 ......................................... 23
Model RAP400 ........................................ 24
Model RAPS300 ....................................... 25
Model RAPS400 ..................................... 26
VSB-300 .................................................. 27
VSB-400 ................................................ 28
Wiring Diagrams
P300E/P400E with 1 Batch Timer ......... 29
P300E/P400E with 2 Batch Timer........ 30
R A P 3 0 0 E / R A P 4 0 0 E ............................... . 3 1
RAPS300E/RAPS400E........................32
P400ESHP ...........................................33
Drawing #091-548 .................................34
Drawing #091-182 .....................................35
Water Hook-up
1) The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water.
2) Use 3/8" copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection
to the fill valve is 3/8" flare.
3) Water line pressure must be from 30 to 70 psi.
4) Hot (up to 160°F) or cold water may be used. Hot water offers faster recovery between brews.
5) Install a shut-off valve near the brewer.
6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water
has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting
type if cold water is used. Contact your local water treatment professional regarding the type of filter you should use
based on water quality and volume of water used.
© Grindmaster Corporation, 1998
PRINTED IN U.S.A.
0307 FORM # AM-309-08
Part # 090-077
Prior authorization must be obtained from Grindmaster Corporation for all warranty claims.
Grindmaster Corporation
4003 Collins Lane
Louisville, KY 40245 USA
(502) 425-4776
(800) 695-4500 (USA & Canada only)
(800) 568-5715 (Technical Service Only)
FAX (502) 425-4664
www.grindmaster.com
WA R N I N G
ELECTRIC SHOCK HAZARD!
Installation of this appliance should be performed by
qualified service per son nel only. Improper installation
could result in elec tro cu tion.
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Page 2 Shuttle Brewers & Airpot/Shuttle Brewers Installation (con't) Electric Hook-up 1) The electric ratings for your brewer are printed on its nameplate. Typical electric ratingsare:P300, P400, RAP300, RAP400Optional 120/208V, 3.8kW, 18A or 120/240V 5.0kW, 21A, 1 phase Standard 120/208V, 5.0kW...
Page 3 Shuttle Brewers & Airpot/Shuttle Brewers Warning Labels The following warning labels were on your dispenser when it was shipped from the factory. They should remain on your dispenserin good, readable condition at all times. If one of your labels is missing or damaged, order a replacement ...
Page 5 Shuttle Brewers & Airpot/Shuttle Brewers Adjustments All adjustable components are located under the top cover. To access these parts: 1) Shut off the electric line to the brewer or unplug the brewer. 2) Remove the single screw fastening the top cover. Remove the top cover. 3) Pull forwar...