Graco 710 - Manual

Graco 710

Graco 710 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
Page: / 14

Table of Contents:

  • Page 4 – DESCRIPTION OF OPERATION
  • Page 5 – SETUP PROCEDURE; MOUNTING DISPENSE VALVE; from the vertical depending on the application.; AIR CONTROLLER; OPERATING PROCEDURES; DRY SYSTEM CHECKOUT; In the normal “ready” state the Piston; section or call Technical Service at (330) 494
  • Page 6 – MATERIAL LOADING; Note; See the Dry System
  • Page 7 – PERIODIC MAINTENANCE; DISPENSE NEEDLE REPLACEMENT; The 710 Dispense Valve is now ready for cleaning and assembly.
  • Page 8 – MODEL 710 GENERAL ILLUSTRATION
  • Page 9 – The 710S Dispense Valve is now ready to be placed back in service.
  • Page 10 – TROUBLESHOOTING
  • Page 11 – #10-32 Hub Replacement Needles for Single Needle Block Models
  • Page 12 – GENERAL GUIDELINES FOR O-RINGS AND U-CUP SEALS; U-cup Seal Guidelines
Loading the manual

Instructions

Dispensit

- 710

Usage Statement – Depending on valve configuration this valve can be used to dispense the following:

Acrylics • Conformal Coatings • Epoxies • Lubricants • RTV Silicones • Silicone Oils • Solder Flux • Solder Mask • UV Curables













Dispense Valve


No.)OartPartMeteri
ng Unit (

100

psi (0.69 MPa, 6.9 bar) Maximum Working Pressure

Important Safety Instructions

Read all warnings and instructions in this manual.
Save these instructions.

See Page 3 for model information, including maximum
working pressure and approvals.







332094A

EN

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 4 - DESCRIPTION OF OPERATION

DESCRIPTION OF OPERATION 1. The normal “ready” state of the system is as follows:  The material supply line is filled with dispensable material.  The system has been purged, filling the valve with material up to the Piston(4).  The Piston (4) is seated in the Needle Seat (1). 2. The dispense cycl...

Page 5 - SETUP PROCEDURE; MOUNTING DISPENSE VALVE; from the vertical depending on the application.; AIR CONTROLLER; OPERATING PROCEDURES; DRY SYSTEM CHECKOUT; In the normal “ready” state the Piston; section or call Technical Service at (330) 494

SETUP PROCEDURE MOUNTING DISPENSE VALVE Mounting holes are drilled through the valve body. The valve may be tilted to a maximum of 60 degrees from the vertical depending on the application. AIR CONTROLLER Operation of the Model 710 Dispense Valve requires a controller that can provide the following:...

Page 6 - MATERIAL LOADING; Note; See the Dry System

OPERATING PROCEDURES MATERIAL LOADING Material is supplied from a pressure vessel or pump with enough pressure to cause a proper rate of flow from the dispense needle. (Note: The material pressure will vary depending on the application.) Warning: Do not apply either operating or reservoir air pressu...

Other Graco Models

All Graco Other