Graco 3A1332A - Manual
Graco 3A1332A – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Install the Solenoid Valves; RED
- Page 3 – Install the Air Tubing
- Page 4 – Graco Standard Warranty
Instructions/Parts
24H255 3-Color
Valve Stack Kit
3A1332A
ENG
To convert ProMix
®
2KE Electronic Proportioners to a 3-color valve stack.
For professional use only.
Kit Parts
Install the Dispense Valves
1.
Relieve the pressure and remove the valve stack as
explained in your ProMix 2KE Repair/Parts manual
3A0870.
2.
Remove the fitting and o-ring from the existing
1-color manifold (M).
3.
Install new o-ring (708) on the spacer (707). Install
new o-ring (709) on the bottom of the 1-color mani-
fold (M). Align manifolds (M and 701). Install four
screws (711). Torque to 8-10 ft-lb (11-14 N•m).
4.
Reinstall the valve stack.
5.
Install the solenoid valves. See page 2.
Important Safety Instructions
Read all warnings and instructions in this
manual and in your separate ProMix 2KE
manuals. Save these instructions.
Ref.
Description
Qty.
701
MANIFOLD, valve, 3-color
1
702
O-RING
2
703
RETAINER, seat, dump valve
2
704
O-RING, PTFE
2
705
VALVE, dispense
2
707
SPACER, manifold
1
708
O-RING, PTFE
2
709
O-RING
1
710
FITTING
1
711
SCREW, cap, socket hd
4
712
PLUG
2
713
VALVE, solenoid; see page 2
2
715
TUBING, red; 5/32 in. (4 mm) OD;
6 ft (1.83 m); see page 3
1
716
TUBING, green; 5/32 in. (4 mm)
OD; 6 ft (1.83 m); see page 3
1
718
CONNECTOR, male; see page 2
4
702
703
704
708
707
709
708
ti16302a
711
701
712
710
705
M
1
These parts are shipped loose.
Torque to 8-10 ft-lb (11-14 N•m).
1
2
1
1
2
1
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 3A1332A Install the Solenoid Valves 1. Disconnect main power. Open the Control Box. 2. Install the two solenoid valves (713) in positions A2 and A3 as shown below. 3. Connect the wires. Solenoid A2: black to pin 7 and red to pin 8. Solenoid A3: black to pin 9 and red to pin 10. 4. Remove the plugs...
3A1332A 3 Install the Air Tubing NOTE: The kit includes 6 ft (1.83 m) of red tubing (715) and 6 ft (1.83 m) of green tubing (716). Cut the tubing to the correct lengths to make the following connections. 1. Connect red 5/32 in. (4 mm) OD tubing between the B connector of solenoid A2 and the CLOSE fi...
All written and visual data contained in this document reflects the latest product information available at the time of publication. Graco reserves the right to make changes at any time without notice. Original instructions. This manual contains English. MM 3A1332 Graco Headquarters: Minneapolis Int...