Page 2 - • IMPORTANT
2 Installation Instructions WARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY, OBSERVE THE FOLLOWING: A. Use this unit only in the manner intended by the manufacturer. If you have any questions, contact themanufacturer. B. Before servicing or cleaning unit, switch power off at the serv...
Page 3 - 2” HOOD DIMENSIONS; 4” HOOD DIMENSIONS
3 Design Information 42” HOOD DIMENSIONS Model ZV42 I Model ZV54 I CONTENTS Design Information Product Dimensions ......................................................................3Duct Cover Accessories ..............................................................4Product Clearances .............
Page 4 - DUCT COVER ACCESSORIES; support frame and duct cover.; PRODUCT CLEARANCES; Clearances may vary due to type of
4 Design Information DUCT COVER ACCESSORIES ZV42 I * 9" for ceiling heights 7’11" to 8’5" using the supplied support frame and duct cover. Order ZX42DC10 for ceiling heights of 8"6" to 10’4". ZV54 I * 5" for ceiling heights 7’11" to 8’5" using the supplied support...
Page 5 - Advance Planning; ADVANCE PLANNING; ATTENTION
5 Advance Planning ADVANCE PLANNING Ductwork Planning • These vent hoods are equipped for 10” round ductwork. • Determine the exact location of the vent hood.• Plan the route for venting exhaust to the outdoors.• Use the shortest and straightest duct route possible. For satisfactory performance, duc...
Page 6 - INSTALLATION HEIGHT REQUIREMENTS; DETERMINE INSTALLATION HEIGHT; ACCESSORIES
INSTALLATION HEIGHT REQUIREMENTS • These vent hoods must be installed 30" min. and 36" max. above the cooking surface – regardless of the ceilingheight. Therefore, installation height of the hood dependson the exact ceiling height of the kitchen. • Accessories are available for ceiling heigh...
Page 7 - Do NOT use flexible plastic ducting.; Equivalent Quantity Total; DUCT FITTINGS
Use this chart to compute maximumpermissible lengths for duct runs tooutdoors. For best results, use 10" diameter duct. Note: Do not exceed maximum permissible equivalent lengths! Maximum recommended duct length for these hoods: 150 feet Flexible ducting: If flexible metal ducting is used, all t...
Page 8 - Installation Preparation; TOOLS AND MATERIALS REQUIRED
8 Installation Preparation TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED) Pencil and tape measure Pliers Electric or battery operated drilland 3/16", bits, Phillips and FlatBlade Screwdriver bits. 120V 60Hz. 15 or 20 Amp, 2-wire with ground. Properlygrounded branch circuit. Key Hole Saw Hammer Wire...
Page 9 - PARTS PROVIDED; Locate the parts packed with the hood.; HARDWARE PACKAGE; Attachment Screws
9 Installation Preparation PARTS PROVIDED Locate the parts packed with the hood. HARDWARE PACKAGE Locate and check contents. Screws shown actual size. 2 Grease trays (3 with 54" hood) Implement rods with standoffs Duct collar Support frame for 8 ft. ceilingwith 4 large pan head screwsinstalled o...
Page 10 - Plan the Location of the Hood and Ductwork; STEP 1 CONSTRUCT CEILING SUPPORT; Installation Instructions; Ceiling Support Structure
10 Plan the Location of the Hood and Ductwork • Use a plumb bob to check the location. The countertop/cooktop below the hood must be centeredwith the hood. • The hood should extend beyond the front and rear edge of the cooking appliance. • The duct in the ceiling must be centered over the cooktop. S...
Page 11 - STEP 1 CONSTRUCT CEILING SUPPORT
11 Top View – Ceiling Joists Run Perpendicular to Front of Hood Top View – Ceiling Joists at Angle with Front of Hood Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED 12-3/4” (42” Hood) 17” (54” Hood) Install Cross- Framing Symmetrically About Duct/Cooktop Centerline 16” JoistSpa...
Page 12 - Ductwork; The cross framing must be accurately aligned to
12 STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED Installation Instructions Ductwork • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should notexceed 150 feet equivalent length for any duct configuration. • Refer to “Duct Fittings” chart to compute the maxi...
Page 13 - STEP 2 MOUNT TEMPLATE; STEP 3 SIZE AND INSTALL DUCTWORK; • Measure from house duct flange to bottom of
13 • Select the template for your hood size.• Align the template with the marks on the ceiling and tape in place.– Be sure the template is oriented correctly, with the front of the hood. • Use a plumb to check to be sure the mounting holes will provide parallel alignment with thecountertop below. • ...
Page 14 - STEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COVERS; Adjust telescoping accessory frame to length; PRUDENCE; Secure house wiring; Install Stop
14 Installation Instructions STEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COVERS Install supplied support frame OR telescoping accessory frame • Hang the supplied support frame or telescoping accessory frame to the ceiling joists and cross framingon the 4 hex head screws by engaging the k...
Page 15 - STEP 5 INSTALL DUCT TRANSITION; STEP 7 CONNECT DUCT
15 Installation Instructions STEP 5 INSTALL DUCT TRANSITION WITH DAMPER IMPORTANT: Remove shipping tape from damper and check that damper moves freely.• Place the transition piece over the hood exhaust and secure with 4 Screws C provided. • Use duct tape to seal the connection. Check to be sure the ...
Page 16 - STEP 8 CONNECT ELECTRICAL; Verify that power is turned off at the source.; ATTENTION –; STEP 9 INSTALL THE MOTOR
16 Installation Instructions STEP 8 CONNECT ELECTRICAL Verify that power is turned off at the source. WARNING: If house wiring is not 2-wire with a ground wire, a ground must be providedby the installer. When house wiring is aluminum, besure to use UL approved anti-oxidant compound andaluminum-to-co...
Page 17 - STEP 11 INSTALL FILTERS
17 Installation Instructions STEP 11 INSTALL FILTERS • Insert the filter into the upper opening and drop into the trays. • To remove the filters, grasp the knobs and push the filter up and lift out. STEP 12 INSTALL RODS • Use a flat blade screwdriver to install stand-offs into the bottom of the hood...
Page 18 - Tabs
18 STEP 13 INSTALL SUPPLIED DUCT COVER AND TOP COVER STEP 14 FINALIZE INSTALLATION • Check all lamps to assure tightness in sockets.• Turn power on at the circuit breaker.• Refer to the Owner’s Manual for operating and cleaning instructions. • Engage tabs into slots on each side at the top of the ho...
Page 19 - STEP 15 INSTALLATION CHECKLIST; Check Blower Safety Screw; Check appearance and installation
19 STEP 15 INSTALLATION CHECKLIST Check Blower Safety Screw ■ ■ Ensure that blower safety screw is securely tightened. See page 16, Step 9. If screw is missing, orderreplacement parts bag. Check Operating Sound and Proper Air-Flow ■ ■ Turn blower to each speed setting and listen for rattles and vibr...