GE H2 - Installation Manual

GE H2

GE H2 – Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
Page: / 2
Loading the manual
Page 1

GEH-3792D

INSTRUCTIONS

FILTR•GARD

®

LUMINAIRE

READ THOROUGHLY BEFORE INSTALLING

THE OPERATING TEMPERATURE “T-CODE” LISTED FOR THIS

LUMINAIRE IS BASED ON THE FOLLOWING BULB SIZES.

USE OF OTHER THAN THESE MAY RESULT IN A HIGHER

OPERATING TEMPERATURE AND COULD RESULT IN A

HAZARDOUS CONDITION.
LAMP TYPE

WATTAGE

BULB SIZE

HIGH PRESSURE SODIUM

70,100,150

ED 23 1/2

HIGH PRESSURE SODIUM

250, 400

ED 18

METAL HALIDE/MERCURY

175, 250

ED 28

METAL HALIDE/MERCURY

400

ED 37

GENERAL

A complete luminaire consists of a ballast housing, optical

assembly, and a cover/mounting.

CAUTION: When installing luminaire in hazard-

ous locations check operating temperature limits

prior to installation to insure it conforms to the

environmental temperature restrictions and NEC

classifications

MOUNTING INSTALLATION

Pendant and Low Profile Cover (See Figure 1)

Remove wiring box door, and thread cover onto conduit.

Orient cover, seal around the conduit using approved NEC

procedures. Tighten set screw at mounting hub. Wiring should

be accomplished in accordance with accepted NEC practices.

A factory attached ground lead is provided. After wiring

replace the wiring compartment door.

Flexible Cover (See Figures 2 and 3)

Remove wiring box door. Loosen four(4) bolts holding

mounting hub to cover. Position adapter plate correctly to

balance luminaire. Use widest bolt spacing possible to secure

plate to cover. Wiring should be accomplished in accor-

dance with accepted NEC practice. Factory attached ground

lead is provided. After wiring, replace the wiring box door.

Ceiling Cover (See Figure 4)

Using the tabs, mount cover to ceiling and remove wiring

box door. Wiring should be accomplished in accordance with

accepted NEC practices. Factory attached ground lead is

provided. After wiring, replace the wiring box door.

Wallmount Cover (See Figure 5)

Mount wiring box and pull leads. Tether is supplied to

hold arm assembly while wiring. Wiring should be accom-

plished in accordance with accepted NEC practices. Factory

attached ground lead is provided. After wiring, attach arm

assembly to wiring box. Do not damage gasket attached to

arm assembly. Mounting screws should be tightened in

alternate sequence.

C A U T I O N

Unit will fall if not installed properly
•

Follow installation instructions

WA R N I N G

Risk of electric shock
•

Turn power off before servicing

–

see instructions

PENDANT AND LOW PROFILE COVER

Figure 1

FLEXIBLE COVER

Figure 2

Figure 3

These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connection with installation, operation or
maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s purposes, the matter should be referred
to GE Lighting Solutions.

g

GE
Lighting Solutions

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Was this manual helpful?

About this manual

Brand
GE
Model
H2
Document type
Installation Manual
Language(s)
English
Pages
2
File size
130.1 KB
Format
PDF

Ask a question

Up to 3 photos. Max 5 MB each. Formats: JPG, JPEG, PNG, WebP.