Furuno FSV-24S - Manual

Furuno FSV-24S

Furuno FSV-24S – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
83 Page 83
84 Page 84
85 Page 85
86 Page 86
87 Page 87
88 Page 88
89 Page 89
90 Page 90
91 Page 91
92 Page 92
93 Page 93
94 Page 94
95 Page 95
96 Page 96
97 Page 97
98 Page 98
99 Page 99
100 Page 100
101 Page 101
102 Page 102
103 Page 103
104 Page 104
Page: / 104

Table of Contents:

  • Page 3 – SAFETY INSTRUCTIONS; WARNING
  • Page 4 – ii; CAUTION
  • Page 5 – iii; SYSTEM CONFIGURATION; Standard type
  • Page 7 – EQUIPMENT LISTS; Standard supply
  • Page 9 – Mounting the Hull Unit; Location of hull unit; Hull unit mounting location
  • Page 10 – Maintenance space, example sonar compartment
  • Page 11 – Shortening the retraction tank; XDCR Travel
  • Page 12 – Remarks for installation of retraction tank; tank, allowing space for tightening of bolts and nuts.
  • Page 13 – Installing hull unit on retraction tank
  • Page 14 – Installation of hull unit
  • Page 16 – Mounting the Display Unit; unit; Mounting considerations; The processor unit must be mounted upright.; Cable fixing hole
  • Page 17 – Mounting procedure; Front view; Processor unit; The monitor unit is designed for mounting on a tabletop.
  • Page 18 – outline drawing for mounting dimensions.; Monitor unit
  • Page 19 – Attaching the CRT filter; location shown below.; Filter; How to attach the hood
  • Page 21 – Passing the cable through the bottom of the control unit; Control unit cover
  • Page 22 – Mounting the Transceiver Unit; Transceiver unit; Mounting the Power Supply Unit; Power supply unit
  • Page 23 – Grounding the Equipment; Grounding for junction box
  • Page 24 – Procedure; Attachment flange for 1200 mm stroke transducer, sectional view
  • Page 25 – Attachment flange for 1600 mm stroke transducer, sectional view
  • Page 26 – Mounting the Cable for Extension Kit (option); Junction box
  • Page 28 – Using the optional attachment kit
  • Page 29 – How to Use the Crimping Tool, Pin Extractor; Crimping tool, contact pin, pin extractor; How to use the crimping tool; Strip the vinyl sheath of the wire to; How to use the pin extractor; contact pin can be removed.
  • Page 30 – Location of Connectors; Monitor; Interconnection
  • Page 31 – Clamp point
  • Page 32 – Unit; Shield
  • Page 33 – Assembling 38P connector
  • Page 34 – Assembling D-sub connector; cable
  • Page 35 – How to connect cables to the monitor unit; clamp plate to fix cables.; Cable cover; Monitor unit, rear view
  • Page 36 – This is necessary to prevent cable stress.; Cable tie
  • Page 37 – Positioning guide pins
  • Page 39 – equipment; Cable list; Schematic view of cables
  • Page 41 – Voltage driven KP output; KP signal; Menu setting
  • Page 43 – Fabrication of cable type DPYCY-4
  • Page 45 – Power Supply Unit; Connect the power cable DPYCY-4 or equivalent as below.; Power unit connection; Cable for Extension Kit; box; Junction box, cover removed
  • Page 46 – Note: Capacitors not present
  • Page 47 – Raise/Lower Control Box; Connect power cable (3
  • Page 48 – Power cable fabrication
  • Page 49 – Hull Unit Check; Before conducting this check (at the dry dock) transmission must be; Main menu; OTHERS menu
  • Page 51 – How to check the hull unit; Transducer switches; OFF; TEST
  • Page 52 – switch. Confirm that the lamp above the switch blinks while; Adjustment; Buoy
  • Page 53 – SYSTEM menu; OTHERS menu, HEADING ADJUST
  • Page 54 – Configuring Own Ship Mark; System menu
  • Page 55 – TD POSITION 1: Set the transducer’s distance from the bow.; Select QUIT at the top of the menu screen and press the [MENU] key to; TD POSITION 1; Ship shape description
  • Page 56 – Other SYSTEM Menu Items; INTERFACE SETTING menu
  • Page 57 – EXT DATA SETTING menu
  • Page 58 – WATER DEPTH; Heading; menu
  • Page 59 – LANGUAGE
  • Page 60 – CONE Board Setting in the Processor Unit; Adjustment of signal level (echo sounder connected)
  • Page 61 – DIP Switch Setting; Processor unit, inside view; CIF2/NMEA2 connector interface selection; DIP switch setting
  • Page 62 – Selecting the Net Sonde information; Selecting echosounder signal; Input port
  • Page 63 – Testing TX/RX independently at hull unit; switch in the control unit for the hull unit to retract the
  • Page 66 – and J507, thus pull out the power block.
  • Page 67 – Processor Unit; POWER FOR CS-120A port
  • Page 68 – Check List
  • Page 70 – DATA SHEET 2; Fig 1 TX output power and B voltage
  • Page 71 – Write by color response curve sheet.
  • Page 73 – 工事材料表
  • Page 81 – 付属品表
  • Page 96 – Takahashi T
  • Page 102 – カラースキャニングソナー
Loading the manual

Installation Manual

COLOR SCANNING SONAR FSV-24/24S

SAFETY INSTRUCTIONS ...........................................................................i
SYSTEM CONFIGURATION .....................................................................iii
EQUIPMENT LISTS ...................................................................................v

1. MOUNTING THE EQUIPMENT........................................................ 1-1

1.1 Mounting the Hull Unit ......................................................................................................1-1
1.2 Mounting the Display Unit ................................................................................................1-8
1.3 Mounting the Transceiver Unit........................................................................................1-14
1.4 Mounting the Power Supply Unit ....................................................................................1-14
1.5 Grounding the Equipment ..............................................................................................1-15
1.6 Installing Attachment Flange (option) .............................................................................1-15
1.7 Mounting the Cable for Extension Kit (option) ................................................................1-18
1.8 Attachment Kit (option) ...................................................................................................1-19

2. WIRING ............................................................................................ 2-1

2.1 How to Use the Crimping Tool, Pin Extractor ....................................................................2-1
2.2 Location of Connectors ....................................................................................................2-2
2.3 Monitor Unit .....................................................................................................................2-4
2.4 Processor Unit .................................................................................................................2-8
2.5 Transceiver Unit .............................................................................................................2-14
2.6 Power Supply Unit .........................................................................................................2-17
2.7 Cable for Extension Kit...................................................................................................2-17

3. ADJUSTMENT AND CHECK ........................................................... 3-1

3.1 Hull Unit Check ................................................................................................................3-1
3.2 Heading Adjustment .........................................................................................................3-4
3.3 Configuring Own Ship Mark .............................................................................................3-6
3.4 Other SYSTEM Menu Items .............................................................................................3-8
3.5 CONE Board Setting in the Processor Unit ....................................................................3-12
3.6 DIP Switch Setting .........................................................................................................3-13
3.7 Testing TX/RX Independently at hull unit ........................................................................3-15

4. CONNECTING THE EXTERNAL INTERFACE CS-120A................. 4-1

Check List............................................................................................AP-1
PACKING LISTS .................................................................................... A-1
OUTLINE DRAWINGS ........................................................................... D-1
INTERCONNECTION DIAGRAMS ......................................................... S-1

www.furuno.co.jp

Back

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - SAFETY INSTRUCTIONS; WARNING

i SAFETY INSTRUCTIONS WARNING Turn off the power at the switchboardbefore beginning the installation. Fire or electrical shock can result if thepower is left on. Do not install the equipment where itmay get wet from rain or water splash. Water in the equipment can result in fire,electrical shock or ...

Page 4 - ii; CAUTION

ii CAUTION Maximum speed while the transducer isprojected and being raised or loweredis as below, to prevent damage to thetransducer. Projected Raising/ Lowering 1200 mm stroke Max. 18 kt Max. 15 kt 1600 mm stroke Max. 15 kt Max. 12 kt Observe the following compass safe distances to prevent interfer...

Page 5 - iii; SYSTEM CONFIGURATION; Standard type

iii SYSTEM CONFIGURATION Standard type Note 1: Power Kit FSV-2403 (option, installed inprocessor unit) required to connect CS-120A. TRANSCEIVER UNIT FSV-241E POWER SUPPLY UNIT FSV-242 100/110/115/ 220/230 VAC, 1 φ, 50/60 Hz 220 VAC, 3 φ, 50/60 Hz PROCESSOR UNIT FSV-2402 Loudspeaker Sub Monitor Echo ...

Other Furuno Models

All Furuno Other