Yamaha 505- Manuals

Yamaha 505– User Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6

Summary

Page 2 - Page 2

Page 2 Contents of LIFT-505 Hardware Kit: ITEM QTY. DESCRIPTION TORQUE REQUIREMENTS a. 1 ea. 12mm x 25 Hex Head Bolt 69.00 ft. lbs. b. 1 ea. 12mm Nylock Nut - c. 4 ea. 10mm x 80 Hex Head Bolts 38.25 ft. lbs. d. 6 ea. 10mm x 70 Hex Head Bolts 38.25 ft. lbs. e. 2 ea. 10mm x 60 Hex Head Bolts 38.25 ft....

Page 3 - Adjust the camber by changing the mounting; Page 3; Disconnect the tie-rod ends from the steering

Page 10 Adjust the Tow-In and Camber 1. Drive forward and back 20-40 feet to check the tow-in and camber before making adjustments. Only make adjustments if needed. NOTE: For stability, an 1/8” tow-in with a positive camber is recom-mended. This will level out when the cart is loaded. 2. Adjust the ...

Page 4 - Page 4; RHOX; Page 9

Page 4 3. Align the hole in the shock tower with the hole in the cross frame as indicated in yellow. If needed, use a screwdriver to align the hole. 4. Insert the Original Bolt from the upper portion of the shock into the aligned hole. 5. Insert a marking device through the thru holes in the shock t...

Yamaha Manuals