Vermont Casting ST967 - Manuals

Vermont Casting ST967 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8

Summary

Page 2 - LP Configuration; Figure 7; Pilot Orifice Conversion; SDDVT; gas conversion; Remove pilot hood.; Gas Conversion; Remove pilot orifice.; Pilot Type 1; Remove pilot hood. (Your pilot may have a different

2 20012973 5. Check that the screw is clean and if necessary re- move dirt. 6. Flip the screw. (Fig. 5)7. Using the Allen wrench as shown in Figure 6, rotate the screw clockwise and tighten until snug. �� �� ������������������� Figure 5 �� �� ��������������������� Figure 6 WARNING: Do not overtighte...

Page 3 - RF Pilot conversion; Burner Orifice Conversion; Bottom View; Tilt ember bed slightly to correctly place on venturi; Table 1. Air Shutter Setting; bracket to the edge of the air shutter.; All Models

3 20012973 • Remove pilot orifice with needlenose pliers. (Fig. 12) NOTE: Use a wrench to hold pilot tube in place while removing the orifice. • Install the conversion orifice. • Reinstall pilot hood and tighten until mark on pilot hood aligns with mark on pilot bracket. CO144 RF Pilot conversion 6/07 ...

Page 6 - Table 2. Injector Orifice Size Matrix

6 20012973 Table 2. Injector Orifice Size Matrix Conversion to LP Input (BTU/h) Kit # Orifice Part # Minimum Maximum 20012921 #56 (.0465”) 30000336 12,000 16,000 Conversion to Natural Gas Input (BTU/h) Kit # Orifice Part # Minimum Maximum 20012910 #47 (.0785”) 20003054 12,500 18,500

Vermont Casting Manuals