Page 2 - ICTORY VSPH Models; NOTE: Height dimensions increase by; Natural; Boiler; RATINGS AND DIMENSIONS; Figure 1. Dimensions data
V ICTORY VSPH Models 2 NOTE: Height dimensions increase by 1 1 ⁄ 2 " and depth increases to 28 1 ⁄ 2 " when combustible floor kit is used. Natural #49 50 50 50 51 51 51 52 52 52 Propane #57 58 59 59 60 60 61 62 63 63 VSPH-60 60,000 3 11 1 ⁄ 8 " 17 3 ⁄ 8 " VSPH-90 90,000 4 14 1 ⁄ 8 ...
Page 3 - LOCATION AND IDENTIFICATION OF PARTS; Figure 2. Location and identification of parts; Base Assembly
V ICTORY VSPH Models 3 LOCATION AND IDENTIFICATION OF PARTS Figure 2. Location and identification of parts Base Assembly
Page 4 - In no case may the boiler be installed on carpeting.; Figure 3. Victory “VSPH” boiler min. clearances for; INSTALLATION REQUIREMENTS
V ICTORY VSPH Models 4 The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1- latest edition. This installation must also conform to the additional require- ments in this Slant/Fin In...
Page 5 - *AL29-4C is a registered Trademark of Allegheny Ludlum Corp; Manufacturer
VENTING APPLICATION VSPH Series are sealed combustion type boilers, they maybe installed and vented either as a direct vent boiler which all air for combustion is obtained directly from outside or as a non- direct vent boiler which air for combustion is taken from inside the boiler room. VSPH boiler...
Page 6 - EXAMPLE: Boiler model VSPH-180 is to be installed at sea; elbow; Equivalent Length of Various 90-Degree Elbows
When joining the various components of the above listed vent systems, the manufacturers’ instructions should be closely followed to insure proper sealing. Use sealant speci- fied by vent system manufacturer for sealing of pipe and fit- tings. See Figure 4 for proper application of vent pipe sealing ...
Page 9 - VICTORY VSPH MODELS NON - DIRECT VENT, SIDEWALL VENTING; The height should be used as the SNOW LINE.
V ICTORY VSPH Models 9 VICTORY VSPH MODELS NON - DIRECT VENT, SIDEWALL VENTING All joints must be liquid and pressure tight. Use U/L listed single wall 3" dia. AL29-4C S.S.*. venting materials (See page 5). Definition of Snow Line: Knowledge of local conditions will reveal the maximum height tha...
Page 10 - VICTORY VSPH MODELS- NON- DIRECT VENT, VENTING THROUGH A ROOF
V ICTORY VSPH Models 10 VICTORY VSPH MODELS- NON- DIRECT VENT, VENTING THROUGH A ROOF All joints must be liquid and pressure tight. Use U/L listed single wall 3" dia. AL29-4C* S.S. venting materials (See page 5). Figure 7. Victory VSPH models-non-direct vent, venting through the roof * AL 29-4C ...
Page 11 - VICTORY VSPH MODELS- NON - DIRECT VENT, UTILIZING AN EXISTING
V ICTORY VSPH Models 11 VICTORY VSPH MODELS- NON - DIRECT VENT, UTILIZING AN EXISTING CHIMNEY AS A CHASE All joints must be liquid and pressure tight. Use U/L listed single wall 3" dia. AL29-4C* S.S. venting materials (See page 5). Figure 8. Victory VSPH models-non-direct vent, utilizing an exis...
Page 12 - VICTORY VSPH MODELS - DIRECT VENT, SIDEWALL VENTING
V ICTORY VSPH Models 12 VICTORY VSPH MODELS - DIRECT VENT, SIDEWALL VENTING All joints must be liquid and pressure tight. Use U/L listed single wall 3" dia. AL29-4C* S.S. venting materials (See page 5). Figure 9. Direct vent, sidewall venting illustration; with straight horizontal vent. * AL 29-...
Page 14 - Figure 12. Direct vent, venting and air intake through a roof.; VICTORY VSPH MODELS; DIRECT VENT, VENTING AND AIR INTAKE THROUGH A ROOF
V ICTORY VSPH Models 14 Figure 12. Direct vent, venting and air intake through a roof. VICTORY VSPH MODELS DIRECT VENT, VENTING AND AIR INTAKE THROUGH A ROOF All joints in vent system must be liquid and pressure tight. Use U/L listed single wall 3” dia. AL29-4C S.S. venting materials (See page 5).
Page 15 - Selecting pipe size for natural gas:; ELECTRICAL WIRING
V ICTORY VSPH Models 15 VENTING AND AIR INTAKE SYSTEM REGULAR INSPECTION A. Inspect the system regularly for condensation, corrosion and/or physical damage. A qualified professional should ser- vice the boiler annually and include such an inspection at that time. The homeowner should look over the s...
Page 16 - Figure 13b. Boiler control
V ICTORY VSPH Models 16 PILO T BURNER BURNER MODEL UT-1107 MODEL UT-1107 P5 P5 P4 P4 P1 P1 P6 P6 P2 P2 P3 P3 INTEGRA TED BOILER CONTR OL INTEGR ATED BOILER CONTR OL P6 P6 THERMOSTAT THERMOSTAT K4 K4 MV MV MV/PV MV/PV PV PV NEUTRAL NEUTRAL HOT HOT M M 120 V/60Hz 120 V/60Hz 120VAC 120VAC 24VAC 24VAC K...
Page 17 - ZONE VALVE SYSTEM USING V8043E/F ZONE VALVES; MULTIZONING OF VSPH BOILER; PUMP ZONING SYSTEM USING R845A RELAY; MULTIZONING OF VSPH BOILER; PUMP ZONING SYSTEM USING R882A/B RELAYS
V ICTORY VSPH Models 17 MULTIZONING OF VSPH BOILER ZONE VALVE SYSTEM USING V8043E/F ZONE VALVES Figure 14. MULTIZONING OF VSPH BOILER PUMP ZONING SYSTEM USING R845A RELAY Figure 15. MULTIZONING OF VSPH BOILER PUMP ZONING SYSTEM USING R882A/B RELAYS Figure 16.
Page 18 - Model; Boiler Water Content; Figure 17. Piping arrangement
V ICTORY VSPH Models 18 2. Power Connection A. Remove electrical junction box cover. B. Hot connection lead is black. Neutral connection lead is white. Proper polarity is important for VSPH boilers. Reversed polarity will cause system lockout and the power LED will flash continuously. C. Connect gro...
Page 19 - Figure 18. Cooling system to a water boiler and chiller.
V ICTORY VSPH Models 19 5. Cold Water Fill Pressure reducing (fill) valve and shut-off valve should be installed. 6. Relief Valve Discharge Piping Use same size or larger piping than valve outlet. Must ter- minate 6" minimum from floor with a plain (no threads) end. Place a bucket under pressure...
Page 20 - WHAT TO DO IF YOU SMELL GAS:; To Turn Off Gas to Appliance; GAS; FIG U RE; OPERATING INSTRUCTIONS
V ICTORY VSPH Models 20 II. Initial Start Safe lighting and other performance criteria were met when testing various gas manifold and control assemblies used on the Victory VSP Series Boilers under the ANSI Z21.13- latest edition. Instructions Follow the lighting instructions in this manual. These i...
Page 21 - VSPH BOILER SEQUENCE OF OPERATION; PILOT LIGHTS AND
V ICTORY VSPH Models 21 THERMOSTAT CALLS FOR HEAT CIRCULATOR ON INDUCER (BLOWER) ON VSPH BOILER SEQUENCE OF OPERATION BOILER WATER TEMPERATURE IS BELOW HIGH LIMIT SETTING? PRESSURE SWITCH CONTACTS PROVED OPEN WITHIN 45 SECONDS? PRESSURE SWITCH CONTACTS CLOSED WITHIN 5 MINUTES? 30 SECONDS PRE-PURGE P...
Page 22 - Boiler rated input in
V ICTORY VSPH Models 22 a. Input for PROPANE is approximately at rating shown on ating plate when manifold pressure is 9- 1 ⁄ 2 " water column b. Input for NATURAL GAS is approximately at rating when manifold pressure is 3-1/2" water column, but should be checked on the gas meter: Btuh Input...
Page 23 - SAFETY CHECK; LED’s FLASHING
V ICTORY VSPH Models 23 To reset the lockout condition: Turn down thermostat or turn power off at disconnect switch for at least 45 seconds, then restore power or set thermostat at desired setting. Automatic reset: After one hour (1/2 hour for flame failure), control will automatically retry. SAFETY...
Page 24 - Figure 21. Location and identification of pressure
V ICTORY VSPH Models 24 CARE AND MAINTENANCE This section must be brought to the attention of the owner by the installer so that the owner can make the necessary arrangements with a qualified service agency for the periodic care and maintenance of the boiler. The installer must also inform the owner...
Page 25 - General Troubleshooting Guide For Service Personnel; Turn off all electric power to the boiler before servicing.; CAUSE; Figure 22. Flue passage cleaning illustration
V ICTORY VSPH Models 25 General Troubleshooting Guide For Service Personnel TOP JACKET TOP JACKET FLUE CO LLECTOR FLUE CO LLECTOR INDU CER INDU CER BRUSH BRUSH WARNING: Only a trained, experienced service technician should perform troubleshooting. Turn off all electric power to the boiler before ser...