Slant/Fin BOILERS - Manual

Slant/Fin BOILERS

Slant/Fin BOILERS – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
Page: / 20

Table of Contents:

  • Page 2 – LIBERTY II
  • Page 3 – BOILER LOCATION; Boiler; INSTALLATION REQUIREMENTS
  • Page 4 – TABLE 2: Provisions for Combustion and Ventilation Air Supply.
  • Page 6 – PIPING
  • Page 7 – IMPORTANT
  • Page 8 – VENT PIPING AND DRAFT REGULATOR; OPERATING INSTRUCTIONS
  • Page 9 – CLEANING AND FILLING A NEW STEAM BOILER; sodium hydroxide; BLOWING OFF A LOW PRESSURE STEAM BOILER
  • Page 10 – A. SPECIAL FLUSHING INSTRUCTIONS; PRESSURE CONTROL CHECK-OUT; Replace all buried wet return lines.
  • Page 12 – REVISION; ZONE; imary other; for
  • Page 13 – WIRING FOR PACKAGED STEAM BOILER; Detail “A”
  • Page 15 – BURNER DATA – BECKETT CF-375 BURNERS FOR PACKAGED BOILERS ONLY; All burner models shown are single stage.
  • Page 17 – NOTE: ELECTRODES ARE PRESET AT THE FACTORY.; aligned with the correct index number.; TURBULATOR SETTINGS - RIELLO 40 SERIES; The hydraulic AIR SHUTTER (A) is operated by the HYDRAULIC; must; be in place when making; FIgure 9B; FOR PROPER INSERTION INTO COMBUSTION CHAMBER
  • Page 20 – sodium chromate; CARE AND MAINTENANCE
Loading the manual

CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGE

Ratings and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Installation Requirements:

Boiler Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3

Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3

Chimney Requirements . . . . . . . . . . . . . . . . . . . . . . . . .3

Air Supply and Venting . . . . . . . . . . . . . . . . . . . . . . . . . .3

Controls and Accessories . . . . . . . . . . . . . . . . . . . . . . . .6

Piping for Steam Boilers . . . . . . . . . . . . . . . . . . . . . . . . .6

Cleaning Piping System . . . . . . . . . . . . . . . . . . . . . . . . .6

Piping for Water Units . . . . . . . . . . . . . . . . . . . . . . . . . . .6

Piping for Tankless Heater . . . . . . . . . . . . . . . . . . . . . . .7

Installing Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Oil Supply Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Wiring the Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Vent Piping and Draft Regulator . . . . . . . . . . . . . . . . . . .8

Operating Instructions:

Precautions Before Starting . . . . . . . . . . . . . . . . . . . . . .8

Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8

Cleaning and Filling New Water Boiler . . . . . . . . . . . . . .8

Blowing Off a Steam Boiler . . . . . . . . . . . . . . . . . . . . .6, 9

Cleaning and Filling New Steam Boiler . . . . . . . . . . . . .9

Low Water Cut-off Check-out . . . . . . . . . . . . . . . . . . . . .9

Pressure Control Check-out . . . . . . . . . . . . . . . . . . . . .10

Replacement of Steam Boiler . . . . . . . . . . . . . . . . . . . .10

Wiring Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-13

Burner Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14-19

Care and Maintenance:

Extended Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . .20

Freezing Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . .20

Oil Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20

General Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . .20

SAFETY WARNING:

KEEP BOILER AREA CLEAR AND FREE FROM
COMBUSTIBLE MATERIALS,

GASOLINE AND

OTHER FLAMMABLE VAPORS AND LIQUIDS.
FAILURE TO ADHERE TO ABOVE SAFETY
WARNING, MAY RESULT IN PERSONAL INJURY
OR DEATH AND PROPERTY DAMAGE.

IMPORTANT:

The installation of this equipment must conform

to the requirements of the authority having jurisdiction or, in
the absence of such requirements, to the Installation of Oil
Burning Equipment, ANSI/NFPA 31, latest edition, and to the
National Electrical Code ANSI/NFPA 70, latest edition. The
installation must also conform to the additional requirements in
this Slant/Fin Instruction Manual. Where there is any differ-
ence, the more stringent requirement shall govern.

In addition, where required by the authority having jurisdiction,
the installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, No. CSD-1, latest
edition.

THIS MANUAL MUST BE LEFT WITH OWNER AND

SHOULD BE HUNG ON OR ADJACENT TO THE

BOILER FOR REFERENCE.

IMPORTANT: This boiler must be installed by a trained,
experienced, service technician, licensed for the installation
and servicing of oil burning equipment or otherwise qualified by
the authorities having jurisdiction over the installation.

Printed in U.S.A. 906

Publication No. LD-40

Part No. 43-0270

Rev. A

INSTALLATION AND OPERATING INSTRUCTIONS

OIL-FIRED WATER AND STEAM BOILERS/NO. 2 OIL

LIBERTY

®

II

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - LIBERTY II

2 LIBERTY II Standard working pressure 30 psi water, 15 psi steam.All boilers hydrostatically tested — A.S.M.E.* For forced hot water heating systems where the boiler and all piping are located within the area to be heated, the boiler may be selected on the basis of gross D.O.E. capacity output. The...

Page 3 - BOILER LOCATION; Boiler; INSTALLATION REQUIREMENTS

LIBERTY II 3 BOILER LOCATION Provide a level, solid foundation for the boiler. Location should be nearthe chimney so that the Flue Pipe Connector or Breeching to the chim-ney is short and direct. A. The foundation must be capable of supporting the weight of the boiler when filled with water: B. The ...

Page 4 - TABLE 2: Provisions for Combustion and Ventilation Air Supply.

4 LIBERTY II Any oil-fired boiler must have a steady draft* and an ample supply ofcombustion air at all times during firing. If air supply or chimney draft* isunreliable, CO2 and overfire draft* will change unpredictably. DO NOT vent this boiler to the same chimney flue used by a fireplace orcoal or...

Other Slant/Fin Models

All Slant/Fin Other