Slant/Fin J-390 - Manual
Slant/Fin J-390 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – RATINGS AND DIMENSIONS; Figure 1. Dimensions data; Water Piping
- Page 3 – LOCATION AND IDENTIFICATION OF PARTS; Figure 2. Location and identification of parts
- Page 4 – Figure 3. Jaguar boiler min. clearances for combustible; INSTALLATION REQUIREMENTS
- Page 6 – VENT AND AIR INTAKE MATERIALS; Manufacturer
- Page 7 – PVC/CPVC PIPE GENERAL ASSEMBLY METHOD; EXAMPLE: The combustion air is provided by air intake; Figure 4. Vent & Air Intake Pipe installation into Boiler Adapter.
- Page 9 – The height should be used as the SNOW LINE.
- Page 11 – CHIMNEY AS A CHASE
- Page 15 – THROUGH A ROOF; Figure 13. Direct vent, venting and air intake through a roof.
- Page 16 – CONDENSATE REMOVAL SYSTEM; Figure 14. Condensate disposal system
- Page 18 – H N H N H N
- Page 19 – BOILER CONTROL
- Page 20 – DISCONNECT
- Page 21 – IZ; ig
- Page 23 – PUMP ZONING SYSTEM USING R882A/B RELAYS; LI; Figure 16d. Single zoning of Jaguar boiler pump
- Page 25 – FOR PROTOTYPE ONLY; PIPING ORIENTATION FOR REFERENCE ONLY.; GAS SUPPLY VALVE; Gauge must face front of boiler, in clear view
- Page 26 – JAGU AR; This is the minimum flow rate recommended for Jaguar boiler.
- Page 31 – Figure 22. Display Board; MODE; Steady dot indicates burner is on.; Table 3; JAGUAR BOILER DISPLAY BOARD
- Page 32 – For space heating mode “0” (boilers not utilizing outdoor sensor)); Table 4; VIEWING AND CHANGING TEMPERATURES; blinking
- Page 33 – Boiler model selection, value is 5 for model J-390; Not Utilized; Display shows blower RPM (mutiply reading by 10 for actual RPM); VIEWING AND CHANGING SYSTEM SETTING -; Table 5; “To change system setting or perform system test”; system setting: Press “UP or DOWN” button, then press “ENTER”
- Page 34 – lo; Maximum
- Page 35 – WHAT TO DO IF YOU SMELL GAS:; TO TURN OFF GAS TO APPLIANCE; Figure 24. Gas supply shutoff valve operation.; OPERATING INSTRUCTIONS
- Page 36 – JAGUAR MODEL J-390 SEQUENCE OF OPERATION
- Page 37 – IV. CHECK COMBUSTION AND FUEL INPUT RATE; A. Start and run the burner at the high firing rate, by using the; INLET
- Page 38 – and retry operation. The temperature display shows the error code.; ERROR CODE
- Page 39 – continued on page 39
- Page 40 – continued from page 38
- Page 42 – GENERAL TROUBLESHOOTING GUIDE FOR SERVICE PERSONNEL; Turn off all electrical power to the boiler before servicing.; CAUSE
- Page 43 – NOTES
IMPORTANT
READ ALL OF THE FOLLOWING
WARNINGS AND STATEMENTS
BEFORE READING THE
INSTALLATION INSTRUCTIONS
The installation must conform to the requirements of
the authority having jurisdiction or, in the absence of
such requirements, to the National Fuel Gas Code,
ANSI Z223.1-latest edition. The installation must also
conform to the additional requirements in this Slant/Fin
Instruction Book.
In addition where required by the authority having juris-
diction, the installation must conform to American
Society of Mechanical Engineers Safety Code for
Controls and Safety Devices for Automatically Fired
Boilers, No. CSD-1.
WARNING
This boiler, gas piping and accessories must be
installed, connected, serviced and repaired by a
trained, experienced service technician, familiar with all
precautions required for gas-fired equipment and
licensed or otherwise qualified, in compliance with the
authority having jurisdiction.
WARNING
The venting system of this boiler is under positive pressure.
Leakage from this system can be hazardous and if not avoided
can result in death or serious injury. In addition to the recom-
mendations within this manual and the User’s Information
Manual, the venting system, from the flue collector to the out-
door discharge, must be carefully checked annually by a quali-
fied service agency.
This manual must be left with owner and should be
hung on or adjacent to the boiler for reference.
INSTALLATION AND OPERATING INSTRUCTIONS
Printed in U.S.A. 708
Par t No. 83-5736 Publication No. J-40
Heating Contractor
Address
Phone Number
Boiler Model Number
Boiler Serial Number
Installation Date
DIRECT-VENT SEALED COMBUSTION CONDENSING BOILER
HOT WATER MODEL J-390
GAS-FIRED BOILER FOR NATURAL GAS
TABLE OF CONTENTS
Boiler Dimensions and Rating ....................................................2
Identification of Par ts ..................................................................3
Installation Requirements ...........................................................4
Contamination Prevention...........................................................5
Venting Application .....................................................................5
Boiler Room Air Supply and Ventilation ......................................5
Flue gas Venting Requirements..................................................6
Additional Installation Requirements for Massachusetts ............6
Vent Material ..............................................................................6
Air Intake Material ......................................................................6
Vent and Air Intake Restrictions .................................................7
Non-Direct Vent Installation ........................................................8
Sidewall Venting, Non-Direct Vent ..............................................8
Vent Termination Location and Clearance ..................................8
Non-Direct Vent Ver tical Venting .................................................8
Direct Vent Installation ................................................................8
Sidewall Venting, Direct Vent ......................................................8
Vent/Air Intake Termination Installation.....................................14
Direct Vent, Venting and Air Intake through a Roof ..................15
Venting and Air Intake Regular Inspection ...............................16
Condensate Removal System ..................................................16
Gas Piping ................................................................................16
Electrical Wiring ........................................................................17
Wiring Diagram .........................................................................18
Single and Multi Zoning ............................................................21
Water Piping .............................................................................24
Operating Instructions...............................................................30
Boiler Control Display ...............................................................30
Boiler Control ............................................................................30
Sequence of Operation .............................................................36
Gas Input Rate Adjustment ......................................................37
Safety Check ...........................................................................38
Care and Maintenance .............................................................41
General Troubleshooting Guide ................................................42
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
REAR VIEW SIDE VIEW FRONT VIEW TOP VIEW 9 5/8 25 WATER RETURN 1 1/4" NPT (MALE) GAS PIPE 3/4" NPT 5 1/8 16 3/8 3 5/8 5 5/8 CONDENSATE DRAIN - 3/4" DIA 4 1/4 4" AIR INTAKE CONNECTION (5 3/4) 26 52 23 5/8 4 1/4 52 5/8 9 5/8 5 1/2 3 7/8 (21 1/8) 4" VENT CONNECTION WATER SUPPLY 1 1/4...
Jaguar Model J-390 3 BOILER CONTROL FIELD WIRINGTERMINALS (24V) FIELD WIRINGTERMINALS (120V) GAS VALVE TRANFORMER 4" AIR INTAKE CONNECTION 4" VENT CONNECTION SPARK ELECTRODE(IGNITER) HEAT EXCHANGER VENTURI COMBUSTIONBLOWER WINDOW(SIGHT GLASS) FLUE PIPE FLUE SENSOR GAS SUPPLY VALVE WATER SUPP...
Jaguar Model J-390 4 The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1- latest edition. This installation must also conform to the additional require- ments in this Slant/Fin Inst...