Slant/Fin J-390 - Manual

Slant/Fin J-390

Slant/Fin J-390 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
Page: / 44

Table of Contents:

  • Page 2 – RATINGS AND DIMENSIONS; Figure 1. Dimensions data; Water Piping
  • Page 3 – LOCATION AND IDENTIFICATION OF PARTS; Figure 2. Location and identification of parts
  • Page 4 – Figure 3. Jaguar boiler min. clearances for combustible; INSTALLATION REQUIREMENTS
  • Page 6 – VENT AND AIR INTAKE MATERIALS; Manufacturer
  • Page 7 – PVC/CPVC PIPE GENERAL ASSEMBLY METHOD; EXAMPLE: The combustion air is provided by air intake; Figure 4. Vent & Air Intake Pipe installation into Boiler Adapter.
  • Page 9 – The height should be used as the SNOW LINE.
  • Page 11 – CHIMNEY AS A CHASE
  • Page 15 – THROUGH A ROOF; Figure 13. Direct vent, venting and air intake through a roof.
  • Page 16 – CONDENSATE REMOVAL SYSTEM; Figure 14. Condensate disposal system
  • Page 18 – H N H N H N
  • Page 19 – BOILER CONTROL
  • Page 20 – DISCONNECT
  • Page 21 – IZ; ig
  • Page 23 – PUMP ZONING SYSTEM USING R882A/B RELAYS; LI; Figure 16d. Single zoning of Jaguar boiler pump
  • Page 25 – FOR PROTOTYPE ONLY; PIPING ORIENTATION FOR REFERENCE ONLY.; GAS SUPPLY VALVE; Gauge must face front of boiler, in clear view
  • Page 26 – JAGU AR; This is the minimum flow rate recommended for Jaguar boiler.
  • Page 31 – Figure 22. Display Board; MODE; Steady dot indicates burner is on.; Table 3; JAGUAR BOILER DISPLAY BOARD
  • Page 32 – For space heating mode “0” (boilers not utilizing outdoor sensor)); Table 4; VIEWING AND CHANGING TEMPERATURES; blinking
  • Page 33 – Boiler model selection, value is 5 for model J-390; Not Utilized; Display shows blower RPM (mutiply reading by 10 for actual RPM); VIEWING AND CHANGING SYSTEM SETTING -; Table 5; “To change system setting or perform system test”; system setting: Press “UP or DOWN” button, then press “ENTER”
  • Page 34 – lo; Maximum
  • Page 35 – WHAT TO DO IF YOU SMELL GAS:; TO TURN OFF GAS TO APPLIANCE; Figure 24. Gas supply shutoff valve operation.; OPERATING INSTRUCTIONS
  • Page 36 – JAGUAR MODEL J-390 SEQUENCE OF OPERATION
  • Page 37 – IV. CHECK COMBUSTION AND FUEL INPUT RATE; A. Start and run the burner at the high firing rate, by using the; INLET
  • Page 38 – and retry operation. The temperature display shows the error code.; ERROR CODE
  • Page 39 – continued on page 39
  • Page 40 – continued from page 38
  • Page 42 – GENERAL TROUBLESHOOTING GUIDE FOR SERVICE PERSONNEL; Turn off all electrical power to the boiler before servicing.; CAUSE
  • Page 43 – NOTES
Loading the manual

IMPORTANT

READ ALL OF THE FOLLOWING

WARNINGS AND STATEMENTS

BEFORE READING THE

INSTALLATION INSTRUCTIONS

The installation must conform to the requirements of

the authority having jurisdiction or, in the absence of

such requirements, to the National Fuel Gas Code,

ANSI Z223.1-latest edition. The installation must also

conform to the additional requirements in this Slant/Fin

Instruction Book.

In addition where required by the authority having juris-

diction, the installation must conform to American

Society of Mechanical Engineers Safety Code for

Controls and Safety Devices for Automatically Fired

Boilers, No. CSD-1.

WARNING

This boiler, gas piping and accessories must be

installed, connected, serviced and repaired by a

trained, experienced service technician, familiar with all

precautions required for gas-fired equipment and

licensed or otherwise qualified, in compliance with the

authority having jurisdiction.

WARNING

The venting system of this boiler is under positive pressure.

Leakage from this system can be hazardous and if not avoided

can result in death or serious injury. In addition to the recom-

mendations within this manual and the User’s Information

Manual, the venting system, from the flue collector to the out-

door discharge, must be carefully checked annually by a quali-

fied service agency.

This manual must be left with owner and should be
hung on or adjacent to the boiler for reference.

INSTALLATION AND OPERATING INSTRUCTIONS

Printed in U.S.A. 708

Par t No. 83-5736 Publication No. J-40

Heating Contractor

Address

Phone Number

Boiler Model Number

Boiler Serial Number

Installation Date

DIRECT-VENT SEALED COMBUSTION CONDENSING BOILER

HOT WATER MODEL J-390

GAS-FIRED BOILER FOR NATURAL GAS

TABLE OF CONTENTS

Boiler Dimensions and Rating ....................................................2

Identification of Par ts ..................................................................3

Installation Requirements ...........................................................4

Contamination Prevention...........................................................5

Venting Application .....................................................................5

Boiler Room Air Supply and Ventilation ......................................5

Flue gas Venting Requirements..................................................6

Additional Installation Requirements for Massachusetts ............6

Vent Material ..............................................................................6

Air Intake Material ......................................................................6

Vent and Air Intake Restrictions .................................................7

Non-Direct Vent Installation ........................................................8

Sidewall Venting, Non-Direct Vent ..............................................8

Vent Termination Location and Clearance ..................................8

Non-Direct Vent Ver tical Venting .................................................8

Direct Vent Installation ................................................................8

Sidewall Venting, Direct Vent ......................................................8

Vent/Air Intake Termination Installation.....................................14

Direct Vent, Venting and Air Intake through a Roof ..................15

Venting and Air Intake Regular Inspection ...............................16

Condensate Removal System ..................................................16

Gas Piping ................................................................................16

Electrical Wiring ........................................................................17

Wiring Diagram .........................................................................18

Single and Multi Zoning ............................................................21

Water Piping .............................................................................24

Operating Instructions...............................................................30

Boiler Control Display ...............................................................30

Boiler Control ............................................................................30

Sequence of Operation .............................................................36

Gas Input Rate Adjustment ......................................................37

Safety Check ...........................................................................38

Care and Maintenance .............................................................41

General Troubleshooting Guide ................................................42

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - RATINGS AND DIMENSIONS; Figure 1. Dimensions data; Water Piping

REAR VIEW SIDE VIEW FRONT VIEW TOP VIEW 9 5/8 25 WATER RETURN 1 1/4" NPT (MALE) GAS PIPE 3/4" NPT 5 1/8 16 3/8 3 5/8 5 5/8 CONDENSATE DRAIN - 3/4" DIA 4 1/4 4" AIR INTAKE CONNECTION (5 3/4) 26 52 23 5/8 4 1/4 52 5/8 9 5/8 5 1/2 3 7/8 (21 1/8) 4" VENT CONNECTION WATER SUPPLY 1 1/4...

Page 3 - LOCATION AND IDENTIFICATION OF PARTS; Figure 2. Location and identification of parts

Jaguar Model J-390 3 BOILER CONTROL FIELD WIRINGTERMINALS (24V) FIELD WIRINGTERMINALS (120V) GAS VALVE TRANFORMER 4" AIR INTAKE CONNECTION 4" VENT CONNECTION SPARK ELECTRODE(IGNITER) HEAT EXCHANGER VENTURI COMBUSTIONBLOWER WINDOW(SIGHT GLASS) FLUE PIPE FLUE SENSOR GAS SUPPLY VALVE WATER SUPP...

Page 4 - Figure 3. Jaguar boiler min. clearances for combustible; INSTALLATION REQUIREMENTS

Jaguar Model J-390 4 The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1- latest edition. This installation must also conform to the additional require- ments in this Slant/Fin Inst...

Other Slant/Fin Models

All Slant/Fin Other