Slant/Fin L-Series - Manuals

Slant/Fin L-Series – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4

Summary

Page 2 - FACTORY SUPPLY AND RETURN HEADER ASSEMBLY — OIL

3'' RETURN HEADER WITH 1 1 / 2 '' STUBS (3 MODULE) * 3'' BUILDING PIPING (BY OTHERS) 1 1 / 2 '' X 34'' SQUARE NIPPLE 1 1 / 2 '' X 30'' NIPPLE CAST END CAP WITH 3 / 4 '' TAPPING. SUPPLY OR RETURN. FOR USE WITH LWCO. 3'' SUPPLY HEADER WITH 1 1 / 2 '' STUBS (3 MODULE) 1 1 / 2 '' X 4'' NIPPLE 3 1 1 / 2 ...

Page 3 - For direct return, header assembly piping; * Building piping must be rigidly secured so

NOTE:Shown reverse return (Preferred). For direct return, header assembly piping connections may be made at the same end of the boiler bank, not as shown.Some governing agencies do not allow compression type couplings.Consult your local code requirements. 3'' PIPE X 20'' (BY OTHERS) 1 1 / 2 '' UNION...

Page 4 - Caravan Flex Joint Assembly Instructions; Slip the metal retainer on the system piping with the larger; When installing the gaskets if a lubricant; DO NOT; use any oil based lubricants.; are enclosed within the clamp.; NOTE: On 3” schedule 40 pipe, spacing between clamps is

Caravan Flex Joint Assembly Instructions 1. Slip the metal retainer on the system piping with the larger diameter side facing the end of the pipe to be joined. The 3" flex joint has a single piece serrated metal retaining ring. This retaining ring should be seated in the recess in the inner diam...

Slant/Fin Manuals