Page 3 - CONTENTS
WARNINGS 4 BEFORE INSTALLATION 5 Product Receipt 5 Model Identification 5 Ratings and Certifications 5 Component Locations 6 General Information 7 GENERAL SAFETY 8 Time/Temperature Relationships inScalds 8 INSTALLATION 9 Installation Codes 9 Equipment Base 9 Stacking 9 Clearances 11 Combustion and V...
Page 4 - WARNINGS; Pay Attention to These Ter ms
4 DANGER: Indicates the presence of immediate hazards which will cause severe person-al injury, death or substantial property damage if ignored. WARNING: Indicates the presence of hazards or unsafe practices which could causesevere personal injury, death or substantial property damage if ignored. CA...
Page 5 - BEFORE INSTALLATION; Product Receipt; Altering any Raypak pressure vessel
5 BEFORE INSTALLATION Raypak strongly recommends that this manual be re-viewed thoroughly before installing your Hi Deltaheater. Please review the General Safety informationbefore installing the heater. Factory warranty does notapply to heaters that have been improperly installed oroperated. (Refer ...
Page 7 - General Infor mation
7 General Infor mation Quantity of Vent Size (in.) Model No. Burners Gas Valves Blowers Flue Intake 992A 11 2 + 1* 2 10 10 1262A 14 3 + 1* 2 12 10 1532A 17 4 2 12 10 1802A 20 4 2 14 10 2002A 23 5 3 14 10 2072A 23 5 3 14 10 2342A 26 5 3 16 10 * Hidden solenoid located inside of air plenum. Burners pe...
Page 8 - GENERAL SAFETY; Feel water before bathing or showering.
8 GENERAL SAFETY To meet commercial hot water use needs, the highlimit safety control on this water heater is adjustable upto 210°F. However, water temperatures over 125°Fcan cause instant severe burns or death from scalds.When supplying general purpose hot water, the rec-ommended initial setting fo...
Page 9 - Installation Codes; Installations must follow these codes:; Equipment Base; The heaters should be located in an
9 INSTALLATION INSTALLATION Installation Codes Installations must follow these codes: • Local, state, provincial, and national codes, laws,regulations and ordinances • National Fuel Gas Code, ANSI Z223.1/NFPA 54 –latest edition (NFGC) • National Electrical Code, ANSI/NFPA 70 - latestedition (NEC) • ...
Page 11 - Clearances; Indoor Installations; Outdoor Installations
11 In addition, the heater shall be installed such that thegas ignition system components are protected fromwater (dripping, spraying, rain, etc.) during applianceoperation or service (circulator replacement, controlreplacement, etc.). Clearances Indoor Installations Heater Side Minimum Clear- ance ...
Page 13 - TruSealTM Combustion Air; All Air from Inside the Building; TWO; All Air from Outdoors; Two permanent openings
13 three or four sheet metal screws (not supplied) equal-ly distributed around the circumference of the duct. Allducting should be self-supported. The filter housing isnot designed to support the air duct. TruSeal™ Combustion Air In certain applications it may be necessary to utilizethe TruSeal opti...
Page 14 - Water Piping; General
14 b. Not less than the sum of the areas of all ventconnectors in the confined space. WARNING: Do not use one permanent opening method if the equipment room is under negativepressure conditions or the equipment is commonvented with other gas-fired appliances. 1. Ventilation of the space occupied by ...
Page 16 - Cold Water Star ts; Temperature & Pressure Gauge; Hydronic Heating; Pump Selection
16 Failure to exceed 105ºF (41ºC) within 7 minutes mayresult in the premature failure of the hot surface ignit-er, remote flame sensor, burners and heat exchanger.It can cause operational problems, bad combustion,sooting, flue gas spillage and reduced service life ofthe vent system. The bypass allow...
Page 18 - Potable Water and Space Heating; When this heater is used for both
18 Potable Water and Space Heating 1. All piping materials and components connected tothe water heater for the space heating applicationshall be suitable for use with potable water. 2. Toxic chemicals, such as used for boiler treatment,shall not be introduced into the potable water usedfor space hea...
Page 20 - Gas Supply; Failure of a heat exchanger due to lime
20 shut-off. Close isolation valves and remove water pip-ing from the in/out header on the heater. Drain theheater and any piping of all water that may experiencebelow-freezing temperatures. Pool/Spa Water Chemistr y Water Hardness Water hardness is mainly due to the presence of cal-cium and magnesi...
Page 21 - Gas Supply Connection; FAILURE TO FOLLOW; . Over pressurized gas valves are not cov-; Table I: Maximum Equivalent Pipe Length
21 Gas Supply Connection The heater must be isolated from the gas supply pip-ing system by closing the manual shut-off valve duringany pressure testing of the gas supply piping systemat test pressures equal to or less than 1/2 psi (3.45kPa). Relieve test pressure in the gas supply line priorto recon...
Page 22 - Gas Supply Pressure; Electrical Power Connections; DO NOT attach any voltage to the stage se-; Field-Connected Controllers
22 8. Remove the rubber grommet from the left-hand-side panel and reinstall into the standard main gasopening, located on the right-hand side of theheater. 9. Install a coupling, nipple, union and sediment traponto the right-hand end of the main gas line andthen install the gas line, making sure tha...
Page 23 - Check the power source:; Making the Electrical Connections; prior to working with any electrical connections or; Field Wiring Connection; A grounding electrode conductor shall be
23 CIRCUIT BREAKER WHITE GROUND BLACK GREEN A B C Fig. 18: Wiring Connections Check the power source: AC = 108 VAC Minimum, 132 VAC MAXAB = 108 VAC Minimum, 132 VAC MAXBC = <1 VAC Maximum If the heater does not have a factory-wired stage con-troller, it is factory-wired in an on-off configuration...
Page 25 - DO NOT; Venting; Appliance Categories; Category I
25 Installer action is required to electrically enable yourheater to operate after making the power connections.You must make a closed contact connection on Stage1 connector of the Central Point Wiring (CPW) boardfor temperature control connections. This will be donebased on the controller option se...
Page 26 - Suppor t of Vent Stack
26 Combustion Air Supply Exhaust Configuration Heater Venting Category Certified Materials Combustion Air Inlet Material Vertical Natural Draft Venting I “B” Vent From Inside Building(Non-Direct Venting) Horizontal Through- the-Wall Venting III Stainless Steel (Gas Tight) Vertical Natural Draft Vent...
Page 27 - Changing the Flue Outlet
27 8. Locate and guard vent termination to prevent acci-dental contact by people or pets. 9. DO NOT terminate vent in window well, stairwell,alcove, courtyard or other recessed area. 10. DO NOT terminate above any door, window, or gravity air intake. Condensate can freeze, causingice formations. 11....
Page 28 - Installation
28 5. Remove the screws, retaining ring and rain gasketfrom top of heater. 6. Remove the screws, flue collar and gasket fromthe run side of the tee located in the flue box ontop of the heater. 7. Reverse the components and reattach in the newlocation. 8. Make sure that the stainless steel cover, now...
Page 29 - the following steps must be fol-; with each appliance remaining connected to the
29 Ter mination The vent terminal should be vertical and should termi-nate outside the building at least 2 ft above the high-est point of the roof that is within 10 ft. The vent capshould have a minimum clearance of 4 ft horizontallyfrom and in no case above or below (unless a 4 ft hori-zontal dista...
Page 31 - 0’ of straight flue pipe
31 Air Inlet Max. Length* Model No. Certified Venting Material Vent Size Maximum Equivalent Vent Length* Combustion Air Intake Pipe Material 10” 12” 992A 10” 1262A 1532A 12” 75’ 100’ 1802A 2002A 2072A 14” 2342A Category III 16” 70’ Room Air 40’ Ducted Combustion Air Galvanized Steel, PVC, ABS, CPVC ...
Page 32 - Direct Vent - Ver tical
32 For installations in extremely cold climate, it is re-quired that: 1. The vent must be installed with a slight upwardslope of not more than 1/4 inch per foot of hori-zontal run to the vent terminal. In this case, an ap-proved condensate trap must be installed per ap-plicable codes. 2. The intake ...
Page 33 - Outdoor Installation; Freeze Protection; Controls
33 Flues supported only by flashing and extended abovethe roof more than 5 ft should be securely guyed orbraced to withstand snow and wind loads. The air inlet opening MUST be installed 1 ft above theroof line or above normal snow levels that might ob-struct combustion air flow. This dimension is cr...
Page 34 - Heater Sequence of Operation
34 Fig. 31: External LED Indicator Decal Heater Sequence of Operation Models 992A-1262A 1. The black (hot) wire lead goes directly to the mainpower switch. This black toggle switch is locatedat the middle front of the control compartment. 2. When the main power switch is placed in the “ON”position, ...
Page 41 - Ignition Module; Code; Flow Switch
41 Ignition Module When additional heat is needed, the combustion airblower starts to purge air from the combustion cham-ber for about 15 seconds. On proof-of-air flow, the air- proving switch closes and the igniter is energized. Toensure safe operation, the gas valve cannot open untilthe igniter is...
Page 42 - High and Low Gas Pressure Switches
42 Fig. 35: Operating Control Low Water Cut-Off (Optional) The low water cut-off automatically shuts down theburner whenever water level drops below the level ofthe sensing probe. A 5-second time delay preventspremature lockout due to temporary conditions suchas power fluctuations or air pockets. Fi...
Page 43 - Proper installation of flue venting is criti-
43 87%-Efficiency Boilers – Special Instructions Water Piping An 87%-efficiency boiler requires a minimum inletwater temperature of 120ºF (49ºC) to prevent exces-sive condensation in the combustion chamber. An87%-efficiency boiler operated with an inlet tempera-ture of less than 120ºF (49ºC) must ha...
Page 48 - Wiring Diagrams
Page 50 - WHAT TO DO IF YOU SMELL GAS:
50 START-UP Pre Star t-up Filling System (Heating Boilers) Fill system with water. Purge all air from the system.Lower system pressure. Open valves for normal sys-tem operation, and fill system through feed pressure.Manually open air vent on the compression tank untilwater appears, then close vent. ...
Page 51 - Blower Adjustment
51 Preparation Check Power Supply With multi-meter at incoming power, check voltagebetween: Hot - Common (≈120 VAC) Hot - Ground (≈120 VAC) Common - Ground (< 1 VAC) Attach Manometers to Measure Pressures 1. Turn off main gas valve. 2. Attach 24” scale manometer to the first main gasshut-off valv...
Page 53 - Manually close the downstream leak test valve.
53 1. Manually close the downstream leak test valve. 2. Open test point A and connect a manometer to it.Verify that there is gas pressure and that it is with-in the proper range (NOTE: must not exceed 14.0in. WC). 3. Open test point B and connect a rubber tube to it.Connect the other end of the tube...
Page 54 - OPERATION; Lighting Instructions
54 10. To restart system, follow lighting instructions in the Operation section. 11. Check to see that the high limit control is set above the design temperature requirements of thesystem. For multiple zones: Check to make sure the flow isadjusted as required in each zone. 12. Check that the heater ...
Page 55 - TROUBLESHOOTING
55 TROUBLESHOOTING Step 7 Step 6 Step 5 Step 1 Step 2 Step 3 Step 4 Is there a Call For Heat? Is Disable jumper intact? (J1) Is there 120VAC at J8 Connector on the CPW board? Do the combustion air blowers come on? Is 24VAC at present at TH (J3 & J12 on CPW board and orange wire on ignition modul...
Page 56 - MAINTENANCE; Visually inspect burner flame.; Periodically; Clean screen and air filter in intake.; Daily
56 MAINTENANCE Suggested MinimumMaintenance Schedule Regular service by a qualified service agency andmaintenance must be performed to ensure maximumoperating efficiency. Maintenance as outlined below may be performed bythe owner. Daily 1. Check that the area where the heater is installedis free fro...
Page 57 - Recalibrate all indicating and recording gauges.; Annually; Check drip leg and gas strainers.
57 Weekly For low-pressure heaters, test low-water cut-offdevice. (With at least one stage of the appliance on,depress the low water cut-off test button, applianceshould shut-off and ignition fault light should come on.Depress reset button to reset). 1. Check igniter. (Resistance reading should be 4...
Page 58 - APPENDIX; Inside Air Contamination
58 APPENDIX Inside Air Contamination All heaters experience some condensation duringstart-up. The condensate from flue gas is acidic.Combustion air can be contaminated by certain vaporsin the air which raise the acidity of the condensate.Higher acidity levels attack many materials includingstainless...