Pioneer 4LG100T BN - Manuals

Pioneer 4LG100T BN – User Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9

Summary

Page 2 - Thank you for purchasing this pioneer quality product.; Tools Required; Teflon Tape; Prior to Installation; Observe all local plumbing and building codes before you begin; Caution

2 REV-01 17, 13 Thank you for purchasing this pioneer quality product. Tools Required Teflon Tape 3/32” Allen Wrench Strap Wrench Thermometer Plumbers Putty Prior to Installation Observe all local plumbing and building codes before you begin • installation.The finished wall and tub/shower valve(4020...

Page 3 - Trim Installation

3 REV-01 17, 13 Trim Installation Remove the temporary nipple. • For Slip-Fit Installation (For 4LG100T,4BR1X0T, 4BR2X0T Only):- • The 1/2” nominal copper tube must be cut with a minimum length of A • to maximum length of B from finished wall. The end of copper tube should be chamfered free of burrs...

Page 6 - Turn off the main water supply

6 REV-01 17, 13 Trim Installation Turn off the main water supply 1. Remove test cap (F) with the help of 1-11/32” socket, ensure all the 2. debris are flushed out of the system. relieve the water pressure.Thread sleeve (G) to the valve body. Insert the cartridge (H) to the 3. valve body. Ensure the ...

Pioneer Manuals