Page 2 - Installers Guide; DO NOT; Owners Guide; ALERTED; SAFETY AND WARNING INFORMATION
2 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 These units MUST use one of the vent systems described in the Installing the Fireplace section ofthe Installers Guide . NO OTHER vent systems or components MAY BE USED . This gas fireplace and vent assembly MUST be vented directly to the outside and M...
Page 3 - TABLE OF CONTENTS
3 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 TABLE OF CONTENTS Safety and Warning Information ................................................ 2 Service Parts Lists ..................................................................... 4 Section 1: Approvals and Codes ...............................
Page 4 - Service Parts; Log set assembly
4 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 * Part number list on following page. * La liste des numéros de pièce se trouve à la page suivante. 4 2 3 (NG, LP) Exploded Parts Diagram(GN, PL) Vue éclatée des pièces Service Parts GEM36 Beginning Manufacturing Date: 7-02 Ending Manufacturing Date: ...
Page 5 - ACCESSORIES / ACCESSOIRES; Service Parts List / Liste des pièces de rechange; L'information fournie dans cette brochure
5 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 ITEM / PIÈC E DESCRIPTION SERIAL # / N° DE SÉRIE PART NUMBER / N° DE PIÈCE 1 Heat Shield / Protection(Bouclier) de Chaleur 370-130 2 Glass Door Assembly / Porte en verre GLA-GEM36 3 Log Grate / Grille de Bûche PRE 002330771POST 002330771 370-360A370-3...
Page 6 - Intermittent Pilot Ignition
6 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 (NG, LP) Exploded Parts Diagram(GN, PL) Vue éclatée des pièces Service Parts Intermittent Pilot Ignition Valve Assembly GEM36 Beginning Manufacturing Date: 7-02 Ending Manufacturing Date: ______ 1 2 3 4 5 6 7 8 9 1 0 11 1 2 1 3 1 4 1 5 1 6 1 7 1 8 IT ...
Page 7 - Appliance Certification; The Heat & Glo fireplace model discussed in this; Certification; Underwriters Laboratories; Installation Codes
7 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 Appliance Certification The Heat & Glo fireplace model discussed in this Installers Guide has been tested to certification standards and listed by the applicable laboratories. Certification MODEL: GEM36 LABORATORY: Underwriters Laboratories TYPE: ...
Page 8 - Getting Started; Introducing the Heat & Glo Gas Fireplaces; Pre-install Preparation; Do not install any
8 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 2 Getting Started Introducing the Heat & Glo Gas Fireplaces Heat & Glo direct vent gas fireplaces are designed to oper-ate with all combustion air siphoned from outside of thebuilding and all exhaust gases expelled to the outside. The informat...
Page 9 - Figure 1. Diagram of the GEM36
9 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 Figure 1. Diagram of the GEM36 TOP STANDOFFS TOP VENT COLLARS TRIM DOOR RATNG PLATES AND LABELS GAS CONTROLS GAS LINE ACCESS ELECTRICAL ACCESS HEAT-ZONE KNOCKOUTS HEAT-OUT KNOCKOUT ORIFICE ACCESS PANEL Ø 8” (203mm) 3” (76.2mm) 42-13/16” (1087.4mm) 35-...
Page 10 - Installing the Fireplace; Step 1. Locating the Fireplace; Vertical Sections; Constructing the Fireplace Chase; TREATMENT OF FIRESTOP SPACERS AND
10 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 3 Installing the Fireplace Step 1. Locating the Fireplace The following diagram shows space and clearance require-ments for locating a fireplace within a room. A B C D E 41-1/2” 18” 39” 50.5” 72” Minimum Clearances from the Fireplace to Combustible M...
Page 11 - Framing Dimensions; Step 2. Framing the Fireplace; MEASURE FIREPLACE DIMENSIONS AND
11 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 Framing should beconstructed of 2 X 4lumber or heavier. A . ................ 41-1/2” B . ....................... 43” C . ................ 17-1/2” D . ................ 54-1/2” E .** ......... 22-15/16” F .* ............... 49-1/2” Figure 3. Framing Di...
Page 13 - Step 3. Installing the Vent System
13 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 Figure 5. Vent System Components and Termination Kits Step 3. Installing the Vent System A. Vent System Approvals These models are approved to use DVP-series direct ventpipe components and terminations (see Figures 4 and 5).Approved vent system compo...
Page 14 - Pilot Shield Adjustment; When venting this unit with high vertical (8 feet or; Figure 9; When venting this unit with long horizontal runs; Flue Restrictor Instructions; Figure 8. Flue Restrictor; STRAIGHT UP; VERTICAL VENTING; On vertical venting; DIAMETER
14 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 FLUE RESTRICTOR Pilot Shield Adjustment Note: When venting this unit with high vertical (8 feet or more) with very little horizontal the pilot shield will need tobe bent down in the closed position as shown in Figure 9. Figure 9 PILOT SHIELD PILOT BR...
Page 15 - Must have a one; Figure 12. Venting with Two 90° Elbows; H + H
15 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 VENTING WITH ONE (1) 90° ELBOW V (FT.) H (FT.) 1.5' MIN. (.457m) 3' MAX. (.912m) 2.5' MIN. (.762m) 6' MAX. (1.82m) 3.5' MIN. (1.06m) 9' MAX. (2.73m) 4.5' MIN. (1.37m) 12' MAX. (3.64m) 5.5' MIN. (1.67m) 15' MAX. (4.55m) 6.5' MIN. (1.98m) 18' MAX. (5.4...
Page 16 - Figure 13. Venting with three 90° elbows
16 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 VENTING WITH THREE (3) 90° ELBOWS V (FT.) H (FT.) 2' MIN. (.609m) 3' MAX. (.912m) 2.5' MIN. (.762m) 6' MAX. (1.82m) 3.5' MIN. (1.06m) 9' MAX. (2.73m) 4.5' MIN. (1.37m) 12' MAX. (3.64m) NOTE: H + H 1 = 24' MAX. (7.28m) V + V 1 + H + H 1 = 64' MAX. (19...
Page 17 - B. Installing Vent Components; Venting Out the Top Vent; • Make sure that the fiberglass rope ring supplied in the; Figure 14. Fiberglass Rope Ring; Continue Adding Vent Components; • Continue adding vent components snap-locking, locking; Install Support Brackets
17 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 B. Installing Vent Components Venting Out the Top Vent The glass must be taken off again for positioning the logswhen the unit is finally installed in place and finished aroundit. Re-install the glass door. Attach vent system to the topstarting colla...
Page 20 - = AREA WHERE TERMINAL IS NOT PERMITTED; Figure 21. Vent Termination Minimum Clearances; public
20 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 V = VENT TERMINAL X = AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTED Figure 21. Vent Termination Minimum Clearances A = 12" ....................... clearances above grade, veran- da, porch, deck or balcony B = 12" ......................
Page 22 - Step 5. Installing the Optional Heat-Out; There must be NO INSULATION or other com-; NOTE; Do this; FORE; final positioning of the fireplace.; Step 6 The Gas Control System; The type of gas control system used with this model is; Intermittent Pilot Ignition System
22 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 Step 5. Installing the Optional Heat-Out or Heat-Zone Kits Figure 24 3. Cut and frame a 12” wide x 10” tall (305 x 254mm) hole inthe exterior wall. The center of the hole will be 22-15/16”(583mm) above the base of the fireplace. See Figure 3. 4. Inst...
Page 23 - Pressure
23 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 • At the gas line access hole, use insulation to re-pack the space around the gas pipe. • Insert insulation from the outside of the fireplace and pack the insulation tightly to totally seal between thepipe and the outer casing. Step 7. The Gas Supply...
Page 24 - Ignition module, valve, pilot and wall switch operate on 3 volts.; Wall Switch; Volt Transformer; Step 9. Wiring the Fireplace
24 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 ! ! Figure 26. Intermittent Pilot Ignition (IPI) Wiring Diagram NOTE 1: Ignition module, valve, pilot and wall switch operate on 3 volts. 120 VAC is required at junction box unless equipped with battery back-up. Wall Switch Position the wall switch i...
Page 25 - FINISH WALL MATERIAL
25 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 Step 10. Finishing Figure 28 shows the minimum vertical and correspondingmaximum horizontal dimensions of fireplace mantels or othercombustible projections above the top front edge of thefireplace. See Figures 2 and 3 for other fireplace clearances. ...
Page 26 - Facing Requirements; Figure 31. Facing Template Dimensions; IMPORTANT INSTALLATION NOTE
26 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 Facing Requirements Facing Thickness from 3/4” to 1-1/4” Facing material within this thickness range can be broughtto 1/2” behind the door top and sides. These non-combus-tible finishing materials must never overlap or obstruct theair outlet/inlet gr...
Page 28 - Step 12. Before Lighting the Fireplace; Step 13. Lighting the Fireplace; Step 14. Climate Control
28 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 Step 12. Before Lighting the Fireplace Before lighting the fireplace, be sure to do the following: Remove all paperwork from underneath the fireplace. Review safety warnings and cautions • Read the Safety and Warning Information section at the beginn...
Page 29 - Maintaining and Servicing Your Fireplace; Fireplace Maintenance; Placing Ember Material
29 Heat & Glo • GEM36 • 370-900 Rev. O • 2/05 4 Maintaining and Servicing Your Fireplace Fireplace Maintenance Although the frequency of your fireplace servicing and main-tenance will depend on use and the type of installation, youshould have a qualified service technician perform an appli-ance ...