Graco 715 - Manuals

Graco 715 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14

Summary

Page 4 - DESCRIPTION OF OPERATION

4 DESCRIPTION OF OPERATION 1. The normal “ready” state of the system is as follows:  The material supply line is filled with dispensable material.  The system has been purged, filling the valve with material up to the Spool (2).  The Spool (2) is seated in the lower Posipak Seal (6). 2. The dispe...

Page 5 - SETUP PROCEDURE; MOUNTING DISPENSE VALVE; OPERATING PROCEDURES; DRY SYSTEM CHECKOUT; section or call Technical Service at (330) 494

5 SETUP PROCEDURE MOUNTING DISPENSE VALVE Mounting holes are drilled through the valve body. The valve may be tilted to a maximum of 60 degrees from the vertical depending on the application. AIR CONTROLLER Operation of the Model 715 Dispense Valve requires a controller that can provide the followin...

Page 6 - OPERATION ADJUSTMENTS

6 OPERATING PROCEDURES WET CUP LOADING Some models are equipped with a wet cup around the Spool (2) to keep it wetted. This helps prevent curing or crystallization of material on the spool and consequent premature seal failure. Fill the wet cup with a compatible self-leveling material prior to opera...

Graco Manuals