Page 3 - Operations Manual; Voyager 3; 004 General Binding Corporation; TABLE OF CONTENTS
Operations Manual Voyager 3 Voyager 3 2004 General Binding Corporation I TABLE OF CONTENTS 1.0 Safety 1.1 Explanation of symbols 1-1 1.2 General Rules of safety 1-2 1.3 Emergency Stops 1-4 1.4 Safety Shields 1-4 1.5 Pneumantics 1-5 1.6 Heat 1-5 1.7 Safety labels 1-6 1.8 Know Your laminator 1-10 2.0 ...
Page 4 - II
Page 5 - III
Operations Manual Voyager 3 Voyager 3 2004 General Binding Corporation III The information in this publication is provided for reference and is believed to be accurate and complete. GBC is not liable for errors in this publication or for incidental or consequential damage in connection with the furn...
Page 6 - IV
Page 7 - Operations Manual: Safety; FCC NOTE; Explanation of symbols
Operations Manual: Safety Voyager 3 Voyager 3 2004 General Binding Corporation Page 1-1 1.0 Safety CAUTION: Do not attempt to operate yourVoyager 3 Laminator until you completelyread and understand this and all relatedOperations Manual. Your safety, as well as the safety of others, is impor-tant to ...
Page 8 - General rules of safety; Employ a
Operations Manual: Safety Voyager 3 Voyager 3 2004 General Binding Corporation Page 1-2 1.2 General rules of safety ELECTRICAL HAZARD: Do not operatethe laminator if power cord is damaged orfrayed. You can be severely shocked, elec-trocuted or cause a fire. ELECTRICAL HAZARD: Employ a licensed elect...
Page 14 - Main Power Switch; WARNING; SHARP EDGE
WARNING: Sharp edge. Keeps hands andfingers away. Sharp edge can cut. WARNING: Keep hands and fingers away.The gate can crush. Operations Manual: Safety Voyager 3 Voyager 3 2004 General Binding Corporation Page 1-8 CAUTION: Max load and height. Do not exceed. Main Power Switch WARNING SHARP EDGE
Page 16 - Know your laminator
Operations Manual: Safety Voyager 3 Voyager 3 2004 General Binding Corporation Page 1-10 1.8 Know your laminator To help you relate to the components referred to inthis manual, take the time to get to know what andwhere key components are on your new laminator. Over view Feeder
Page 17 - Laminator
Operations Manual: Safety Voyager 3 Voyager 3 2004 General Binding Corporation Page 1-11 Laminator Separator
Page 19 - Operations Manual: Warranty
Operations Manual: Warranty Voyager 3 Voyager 3 2004 General Binding Corporation Page 2-1 2.0 Limited 90-Day Warranty GBC warrants to the original purchaser for a periodof one year parts and ninety days labor, after instal-lation that this laminator is free from defects in work-manship and material ...
Page 21 - Operations Manual: Specifications; MACHINE SPECIFICATION; Lay Flat Films; Maximum Film Roll Diameter:; Tap and drain water; Power Requirement European Version:
Operations Manual: Specifications Voyager 3 Voyager 3 2004 General Binding Corporation Page 3-1 3.0 Specifications 3.1 MACHINE SPECIFICATION Maximum Speed: 150 ft/min = 10,000, 8.5 x 11 in. sheets/ hr.(45.7 meters/min = 10,000, 21.6 x 28 cm sheets/ hr.) Minimum sheet sizes: 8.5 x 11 in. with the 8.5...
Page 22 - Feeder Specifications; - 10 000 sheets/hr for all paper types listed under; Laminator Connection Height:; Counter clockwise (looking from DRIVE side); Sheets overlap on conveyor:; (2) front side blowers on the side guides
Operations Manual: Specifications Voyager 3 Voyager 3 2004 General Binding Corporation Page 3-2 Ambient Air Temp: 5°-40° C Humidity Rating: 30%-95% (Non-Condensing) Altitude Rating: 1000 Meter Minimum 3.2 Feeder Specifications Minimum sheet sizes: 8.5” x 11” (21.6 x 28 cm) (8.5” side forward) Maximu...
Page 23 - Electrical plug connections:
Operations Manual: Specifications Voyager 3 Voyager 3 2004 General Binding Corporation Page 3-3 Other: Vacuum and blower adjustments Conveyor: Type: Vacuum style conveyor Length: Min. 40” (101.6 cm) Vacuum sections : Max. 4” (101.6 mm)from downstream edge of feeder conveyor with possibility to close...
Page 24 - Note: Air pump design equal or similar to Becker air pump T 4.40 DSK
Operations Manual: Specifications Voyager 3 Voyager 3 2004 General Binding Corporation Page 3-4 Motor power: 1.85 kW (informative) RPM at 50 Hz: 1420 (informative) Adjustments: Vacuum and pressure adjustments Power Requirement: Power supplied by the laminator Note: Air pump design equal or similar t...
Page 25 - Operations Manual: Installation
4.0 Installation CAUTION: The GBC Voyager 3 can only beinstalled by a trained GBC Ser viceRepresentative. Before a Voayger 3 Laminator can be installed, thereare a few requirements that must be met. Make cer-tain that each of the requirements listed in the fol-lowing pre-installation checklist are m...
Page 29 - Receiving the crates
Operations Manual: Installation Voyager 3 Voyager 3 2004 General Binding Corporation Page 4-5 4.2 Receiving the crates The GBC Voyager 3 is shipped in two crates. Bothcrates should arrive at the same time on yourdocks. INFORMATION: ALL SHIPMENTS ARE EX-WORKS. At our dock, title passes to thebuyer. P...
Page 30 - Positioning the components
Operations Manual: Installation Voyager 3 Voyager 3 2004 General Binding Corporation Page 4-6 4.4 Positioning the components All components are positioned by the center line ofthe laminator. The components should be posi-tioned in the following order; Laminator, stackertable, feeder, conveyor, vacuu...
Page 31 - Feeder
Operations Manual: Installation Voyager 3 Voyager 3 2004 General Binding Corporation Page 4-7 Feeder Once the feeder has been safely removed from thecrate, you can move the feeder into position byusing a pallet jack or forklift. To move the feeder, approach the feeder from thefront and guide the for...