Page 2 - EDN312 Installation Guide; Ethernet DSL Access; IP DSLAM
EDN312 Installation Guide Ethernet DSL Access IP DSLAM . ii 1/1531-HSD 101 41 Uen A 2004-01-30 Copyright Ericsson AB - 2004 All Rights Reserved Disclaimer No part of this document may be reproduced in any form without the written permission of the copyright owner. The contents of this document are...
Page 3 - Contents
. 1/1531-HSD 101 41 Uen A 2004-01-30 iii Contents 1 Introduction 1 1.1 Revision History 1 2 Environmental and Space Requirements 2 3 Cabling 4 3.1 Cabling of Subscriber Lines 4 3.1.1 Cabling Lines 4 3.1.2 Wiring EDGE Connectors 5 3.2 Cabling of Ethernet Connections 8 4 Mounting the IP DSLAM 9 5 Veri...
Page 5 - Introduction; History
Introduction 1/1531-HSD 101 41 Uen A 2004-01-30 1 1 Introduction This guide describes how to install the Ethernet DSL Access (EDA) IP DSLAM EDN312. The guide is intended for installation and maintenance personnel. An overview of the installation process of a complete Access Domain is described in th...
Page 6 - Environmental and Space Requirements
Environmental and Space Requirements 2 1/1531-HSD 101 41 Uen A 2004-01-30 2 Environmental and Space Requirements The 12-line IP DSLAM (EDN312) complies with the following standards regarding storage, transportation and operation. The operation category is also designated stationary in-use at weather...
Page 8 - Cabling; Cabling of Subscriber Lines; Lines
Cabling 4 1/1531-HSD 101 41 Uen A 2004-01-30 3 Cabling 3.1 Cabling of Subscriber Lines Before the IP DSLAM is mounted the connections between the Line MDF and the Exchange MDF have to be rewired. The wires are disconnected, and then reconnected through typically a Broadband MDF and the EDA System ac...
Page 9 - Wiring EDGE Connectors
Cabling 1/1531-HSD 101 41 Uen A 2004-01-30 5 3.1.2 Wiring EDGE Connectors It is recommended to follow the “Best practice” wiring procedure when wiring the EDGE connectors. The EDGE connector can be mounted by using a Tool Kit. The kit consists of a wiring bracket-tool and an LSA+ inserter-tool. Figu...
Page 12 - Cabling of Ethernet Connections
Cabling 8 1/1531-HSD 101 41 Uen A 2004-01-30 Figure 7 Tie Up and Label the EDGE Connectors 3.2 Cabling of Ethernet Connections The EDN312 IP DSLAM is connected to the network with cat. 5 straight through standard LAN cables. The total cable length from a switch to the IP DSLAM must not exceed 100 m ...
Page 13 - Mounting the IP DSLAM
Mounting the IP DSLAM 1/1531-HSD 101 41 Uen A 2004-01-30 9 4 Mounting the IP DSLAM The illustration below shows how to mount the EDN312 after the subscriber lines, exchange lines through the EDGE connector have been pulled. The EDGE connector is removed from the bracket-tool and inserted in the rear...
Page 14 - Verifying the Installation; Verification without Connection to PEM
Verifying the Installation 10 1/1531-HSD 101 41 Uen A 2004-01-30 5 Verifying the Installation The purpose of the verification is to ensure the following: • No errors in the rewiring of the subscriber lines • The old services (POTS or ISDN) function • The physical installation of the EDA Access Domai...
Page 15 - Verification with the Local Craft Tool
Verifying the Installation 1/1531-HSD 101 41 Uen A 2004-01-30 11 5.2 Verification with the Local Craft Tool The LCT can be used without a connection to PEM or to any backbone network as described in section section Error! Reference source not found. on page Error! Bookmark not defined. . The LCT act...
Page 16 - Verification Using PEM
Verifying the Installation 12 1/1531-HSD 101 41 Uen A 2004-01-30 2. Copy 24 configuration files with line configurations from the LCT tool to the ECN320 flash disk. 3. Restart the embedded IP DSLAMs by using the Command Line Interface (CLI) 4. Test the ADSL lines by connecting a CPE modem to each li...
Page 18 - Reference List
Reference List 14 1/1531-HSD 101 41 Uen A 2004-01-30 Reference List System Overview, 1/1551-HSC 901 26/4, Ericsson AB 2004 PEM User’s Guide, 1553-AOM 901 018/3, Ericsson AB 2004 EDN312 User’s Guide,1/1553-HSD 101 41, Ericsson AB 2004 Subrack Installation Guide, 1/1531-HSC 901 026/4, Ericsson AB 2004...