Page 2 - CONTENTS
2 CONTENTS 1 READ IMMEDIATELY 3 1.1 Important Information 1.2 Legal Provisions and Guidelines 1.3 Energy-Efficient Use of the Heat Pump 2 PURPOSE OF HEAT PUMP 4 2.1 Application 2.2 Principle of Operation 3 SCOPE OF DELIVERY 4 3.1 Baseline Unit 4 ACCESSORIES 5 4.1 Connecting Flanges 5 TRANSPORT 5 6 I...
Page 3 - Important Information; READ IMMEDIATELY; Legal Provisions and Guidelines; C and
3 READ IMMEDIATELY 1.1 Important Information Any work on the heat pump may only be performed by an authorised and qualifiedcustomer service. The transport securing devices must be removed after the transport. The heat pump must not be tilted more than max. 45 ° (in either direction). Flush the heati...
Page 4 - Principle of Operation; SCOPE OF DELIVERY; ) Transport securing
4 3 PURPOSE OF HEAT PUMPSCOPE OF DELIVERY PURPOSE OF THE HEATPUMP 2.1 Application The brine-to-water heat pump is designed for usein existing or newly built heating systems. Brine isused as the heat carrier in the heat source system.Ground coils, ground collectors or similar systemscan be used as th...
Page 5 - TRANSPORT; ACCESSORIES; Connecting Flanges; The heat pump must not be tilted; The transport securing device is to
5 TRANSPORT 5 ACCESSORIES TRANSPORT CAUTION! CAUTION! 4 ACCESSORIES 4.1 Connecting Flanges The use of flat-sealing connecting flanges allowsthe unit, as an option, to be connected by means off l a n g e s . For the transport by means of a hand truck orboiler trolley, position the latter under the fr...
Page 6 - INSTALLATION; The heat pump offers silent operation due to efficient; MOUNTING; General Information; The heating system must be flushed
6 6 7 INSTALLATIONMOUNTING INSTALLATION 6.1 General Information As a rule, the unit must be installed indoors on alevel, smooth and horizontal surface. The entire baseframe should make full contact with the surface inorder to ensure adequate sound insulation. Failingthis, additional sound insulation...
Page 7 - Connection on Heat Source; The supplied strainer must be fitted; C can thus be ensured.; The brine solution must contain at; Electrical Connection; - Connection of the control wire to terminals X1:; The clockwise phase sequence must
7 MOUNTING 7.3 Connection on Heat Source Side The following procedure must be observed whenmaking the connection: Connect the brine line to the flow and return pipeof the heat pump. The supplied strainer must be fitted in the heat source inlet of the heat pump in orderto protect the evaporator again...
Page 8 - COMMISSIONING; General Information; Commissioning is to be effected in; The overflow valve is to be opened to such an extent
8 COMMISSIONING 8 CAUTION! COMMISSIONING 8.1 General Information To ensure proper commissioning it should be carriedout by a customer service authorised by the manu-facturer. Only then can an extended warranty periodof 3 years in total be granted (cf. Warranty service). 8.2 Preparatory Steps Prior t...
Page 9 - Cleaning of Heat Source Side; The supplied strainer is to be install-; Cleaning of Heating Side; C a u t i o n - H e a t i n g Te c h n i c i a n s !
9 CARE/CLEANING 9.3 Cleaning of Heat Source Side The supplied strainer is to be install- ed in the heat source inlet of the heat pump inorder to protect the evaporator against conta-mination. The filter screen of the strainer should be cleanedone day after commissioning, thereafter every week.If no ...
Page 10 - DECOMMISSIONING; Disposal; the event that a malfunction occurs nevertheless,; All work on the heat pump may only
10 11 DECOMMISSIONING 11.1 Summer Shutdown A heating-only system can be shut down in summer(no domestic water heating). This can be effectedby means of the mode selector switch of the heatp u m p c o n t r o l l e r. P l e a s e f o l l o w t h e i n s t r u c t i o n sc o n t a i n e d i n t h e c ...
Page 11 - APPENDIX
11 APPENDIX 12 APPENDIX 12.1 Dimensioned Drawings 12.1.1 Dimensioned Drawing SI 50ZS 1212.1.2 Dimensioned Drawing SI 75ZS 1312.1.3 Dimensioned Drawing SI 100ZS 14 12.2 Equipment Data 15 12.3 Diagrams 12.3.1 Characteristic Curves SI 50ZS 16 12.3.2 Characteristic Curves SI 75ZS 17 12.3.3 Characteristi...
Page 15 - Equipment Data
15 APPENDIX: 12.2 EQUIPMENT DATA Equipment Data EQUIPMENT DATA for brine-to-water heat pumps for heating purposes 1 TYPE AND COMMERCIAL DESCRIPTION ..50ZSN ..75ZSN ..100ZSN 2 MODEL 2.1 Enclosure type acc. to EN 60 529 IP 21 IP 21 IP 21 2.2 Installation site indoors indoors indoors 3 PERFORMANCE DATA...
Page 24 - APPENDIX: 12.6 EC DECLARATION OF CONFORMITY; EC Declaration of Conformity; The undersigned
24 APPENDIX: 12.6 EC DECLARATION OF CONFORMITY EC Declaration of Conformity EC Declaration of Conformity The undersigned Glen Dimplex Deutschland GmbHDivision DimplexAm Goldenen Feld 18D-95326 Kulmbach / Allemagne hereby confirm that the design and construction of the product(s) listed below, in the...
Page 25 - Notes