Page 3 - Important Information; READ IMMEDIATELY
3 READ IMMEDIATELY 1.1 Important Information Prior to opening the unit it must be ensured that all electrical circuits are disconnectedfrom the power source. During transport, the heat pump must not be tilted more than 45 ° (in either direction). Heat pump and transport pallet are only connected by ...
Page 4 - SCOPE OF DELIVERY; Baseline Unit; Application; Principle of Operation
4 v a l v e a s w e l l a s t h e l o w - n o i s e c o m p r e s s o r, adesuperheater, a condenser and the electric controlunit. In the case of low ambient temperatures, air humiditymay accumulate on the evaporator in the form offrost impairing the heat transfer. The evaporator isautomatically def...
Page 5 - Control Box; Heat Pump Controller; TRANSPORT
5 2. 2. 1. 1. 1. 3. 1. 1. 3. 2. SCOPE OF DELIVERY TRANSPORT 4 CAUTION! 3.2 Control Box The control box is integrated in the heat pump. It canbe folded downward after removing the lower front panel and loosening the fastening screws locatedat the top on the right. The control box houses the mains ter...
Page 6 - INSTALLATION; Condensate Line; MOUNTING; General
6 INSTALLATIONMOUNTING 6 INSTALLATION 5.1 General The unit should always be installed on a permanentlylevel, smooth and horizontal floor. The entire baseframe surface should thereby make close contact withthe floor in order to ensure adequate sound insulationand to prevent water-carrying parts from ...
Page 7 - Electrical Connection; COMMISSIONING
7 MOUNTING COMMISSIONING 6.3 Electrical Connection The power connection of the heat pump is effectedvia a commercially available 4-core cable. The cable has to be supplied by the client and thewire cross-section to be selected according to thepower consumption of the heat pump (see Equip-ment Data i...
Page 8 - Procedure During Cooling Season; Maintenance; Cleaning of Heating Side
8 COMMISSIONINGCLEANING / MAINTENANCE f) Once all heating circuit are fully open and aheating water temperature of approx. 25 ° C is maintained in the buffer tank, the minimum flowrate must be set on the overflow valve and theheating circulating pump. g) New buildings have an increased heat demanddu...
Page 9 - Cleaning of Air Side; DECOMMISSIONING; Placing Out of Service in Summer
9 CLEANING / MAINTENANCE MALFUNCTIONS / TROUBLESHOOTING DECOMMISSIONING the supply and return line of the heat pump. Ther e g u l a t i o n s o f t h e t r a d e a s s o c i a t i o n s m u s t b eadhered to. If in doubt, contact the manufacturers ofthe chemicals! To prevent consequential damage it ...
Page 10 - APPENDIX; DIMENSION DRAWING
10 APPENDIX 11.1 DIMENSION DRAWING 11 11.2 EQUIPMENT DATA 12 11.3 SCHEMATICS 11.3.1 Heating Mode 13 11.3.2 Cooling Mode 14 11.4 WIRING DIAGRAMS 11.4.1 Control 15 11.4.2 Load 16 11.4.3 Terminal Diagram 17 11.4.4 Legend 18 11.5 HYDRAULIC BLOCKDIAGRAM 19 11.6 EC DECLARATION OFCONFORMITY 20 11.7 WARRANT...
Page 11 - Dimension Drawing
11 Dimension Drawing APPENDIX: 11.1 DIMENSION DRAWING
Page 12 - Equipment Data
Page 17 - Wärmepumpenregler; Klemmenplan und Steckverbinderbelegung; Netz
17 11.4.3 Terminal Diagram APPENDIX: 11.4 WIRING DIAGRAMS Wärmepumpenregler Klemmenplan und Steckverbinderbelegung im reversiblen Luft/Wasser-Außengerät LA 16 ASR ge /g n 1 3 2 3/PE 400VAC - 50Hz L1 L2 L3 P E Netz Wärmepumpenregler ge /g n A n sc h lu ss le itu n g 4 La st 1 2 3 X1 P E L 1 L2 L3 S t...
Page 19 - Hydraulic Block Diagram
19 Hydraulic Block Diagram APPENDIX: 11.5 HYDRAULIC BLOCK DIAGRAM N1-N05 (HUP) N1-N06 (WUP) N2-N02 (SUP) N1-N010 EV N1-B3 (WWF) KW T WW EV N2-N01 (HUPR) N1-B6 (NKF) N1-N04 (2.WE) N1-N012/N013 (MAN/MZN) M N1-N011 (HPN) X8/X11 N1-B1 (AUF) T T 1 5 6 2 4 3 Standardregler (mit Display) Kühlregler (ohne D...
Page 20 - EC Declaration of Conformity; APPENDIX: 11.6 EC DECLARATION OF CONFORMITY; Declaration of Conformity
20 EC Declaration of Conformity APPENDIX: 11.6 EC DECLARATION OF CONFORMITY Declaration of Conformity The undersigned KKW Kulmbacher Klimageräte-Werk GmbH,Geschäftsbereich DimplexAm Goldenen Feld 18D-95326 Kulmbach hereby confirm that the design and construction of the product(s) listed below, in th...
Page 21 - Notes