Page 6 - Installation manual; English; CONTENTS; Read these
RWEYQ72PTJU RWEYQ168PTJU RWEYQ84PTJU RWEYQ216PTJU RWEYQ144PTJU RWEYQ252PTJU VRV-W III System air conditioner Installation manual 1 English CONTENTS 1. SAFETY CONSIDERATIONS ...................................................... 12. INTRODUCTION...........................................................
Page 8 - INTRODUCTION; -2 Standard operation limit; Cooling; -3 Standard supplied accessories; NOTE
3 English 2. INTRODUCTION This installation manual concerns VRV inverters of the Daikin RWEYQ-P series. These units are designed for indoor installation and used for cooling and heatpump applications. The RWEYQ-P units can be combined with Daikin VRV series indoor units for air conditioning purposes...
Page 9 - -5 Technical specifications
English 4 2-5 Technical specifications (1) (1) Refer to the engineering data book for the complete list of specifications.(2) The normal cooling capacities are based on: –indoor temperature: 80 °FDB / 67 °FWB, –inlet water temperature: 85 °F, –outlet water temperature: 95 °F, –equivalent pipe length...
Page 10 - SELECTION OF LOCATION
5 English 3. SELECTION OF LOCATION This unit does not have specifications for outdoor installation. The unit must be installed indoors (example: machine room, …). Paying attention to the conditions mentioned below, select the place for installation with a prior approval of customer. 1. The foundatio...
Page 11 - WATER PIPING WORK; CAUTION; -1 When designing the equipment
English 6 NOTE • Prepare a water drainage channel around the foundation to con-densate waste water from around the unit. • If the unit is to be installed on a roof, check the strength of the roof and its drainage facilities first. • Make sure the area around the machine drains properly by setting up...
Page 12 - -3 Daily service and maintenance
7 English 7-3 Daily service and maintenance 1. Management of water qualityThe plate type heat exchanger has a structure that does not permit dismantling and cleaning, or replacing any parts. Please pay attention carefully to the quality of water to be used for the plate type heat exchanger in order ...
Page 13 - FIELD WIRING; -2 Power circuit and cable requirements
English 8 8. FIELD WIRING NOTE • All field wiring and components must be installed by a licensed elec- trician and must comply with relevant local and national regulations. • The field wiring must be carried out in accordance with the wiring diagrams and the instructions given below. • Be sure to us...
Page 15 - -5 In case of a local setting; Power wire
English 10 Field line connection: L1, L2, L3, phase of the power supply wiring should be clamped to the safety catch using the included clamp material.The green and yellow striped wrapped wires should be used for ground-ing.Make sure to connect the power wire to the power terminal block and fix it u...
Page 16 - REFRIGERANT PIPING; -1 Selection of piping material
11 English 9. REFRIGERANT PIPING CAUTION After completing installation, be sure to open the valves. (See 9-9 Additional refrigerant charge for details) (Operating the unit with the valves shut will break the compressor.)Use R410A to add refrigerant. (The R410A refrigerant cylinder hasa pink stripe p...
Page 17 - -4 Connecting the refrigerant piping; Pattern 1; No trap has been installed in the gas piping.; Prohibited pattern
English 12 Precautions when connecting pipes • See the following table for flare part machining dimensions.• When connecting the flare nuts, apply refrigerant oil to the inside of the flares and turn them three or four times at first.(Use ester oil or ether oil.) • See the following table for tighte...
Page 18 - -5 Example of connection
13 English 9-5 Example of connection ∗ In case of a system of switching between cooling and heating, all systems use 2-tube piping (for suction gas piping and liquid piping). No BS unit is required. Example of connection (Connection of 8 indoor units Heat pump system) Single outside unit installed (...
Page 19 - -6 Air tight test and vacuum drying; Charge with the tank upright.
English 14 9-6 Air tight test and vacuum drying The units were checked for leaks by the manufacturer.Confirm that the valves are firmly closed before Air tight test or vacuum drying.To prevent entry of any impurities and ensure sufficient pressure resis-tance, always use the special tools dedicated ...
Page 20 - -10 Stop valve operation procedure
15 English 2. After the vacuum drying is finished, charge the additional refrigerant in its liquid state through the liquid stop valve service port. Taking into account following instructions: • Check that gas and liquid stop valves are closed. • Stop the compressor and charge the specified weight o...
Page 21 - CHECKS AFTER INSTALLATION; WARNING; 1-2 Before turn on the power supply
English 16 10. CHECKS AFTER INSTALLATION WARNING • Never connect power supply wiring to the terminal block for remote controller wiring as this could damage the entire system. • Attach the power wire securely. • To avoid injury, always make sure that the circuit breaker on the power supply panel of ...
Page 22 - 1-4 Check of normal operation; CAUTION FOR REFRIGERANT LEAKS
17 English 〈 Cautions for check operation 〉 • If the system is started within about 12 minutes after the outdoor/ indoor units are turned ON, the compressor will not run and H2P lights up. Before starting an operation, always verify that the LED dis-play shows the contents of the table in “ 11-3 Che...
Page 23 - Procedure for checking maximum concentration
English 18 Pay a special attention to the place, such as a basement, etc. where refrigerant can stay, since refrigerant is heavier than air. Procedure for checking maximum concentration Check the maximum concentration level in accordance with steps 1 to 4 below and take whatever action is necessary ...