Page 5 - English; CONTENTS; FIRST OF ALL; -1 Safety considerations
English 1 REYQ72PAYDREYQ96PAYDREYQ120PAYD REYQ72PATJREYQ96PATJREYQ120PATJ VRV III System air conditioner Installation manual CONTENTS 1. FIRST OF ALL.......................................................................... 1 1-1. Safety considerations ..................................................
Page 6 - -2 Special notice of product; III
2 English • Make sure that all wiring is secured, that specified wires are used, and that no external forces act on the terminal connec-tions or wires. Improper connections or installation may re-sult in fire. • When wiring, position the wires so that the electric parts box lid can be securely faste...
Page 7 - -3 Disposal requirements; INTRODUCTION; -2 Standard supplied accessories; SELECTION OF LOCATION
English 3 [DESIGN PRESSURE] Since design pressure is 478 psi, the wall thickness of pipes should be more carefully selected in accordance with the relevant local and national regulations. 1-3 Disposal requirements Dismantling of the unit, treatment of the refrigerant, oil and eventual other parts, s...
Page 8 - INSPECTING AND HANDLING THE UNIT; -1 Selection of piping material and Refrigerant
4 English • If the height is exceeded the above, calculate h1 and h2 shown in the figure below, and add h2/2 to the service space of front side and h1/2 to the service space of suction side. DANGER • Do not install unit in an area where flammable materials are present due to risk of explosion result...
Page 9 - -2 Protection against contamination
English 5 • Outside unit multi connection piping kit and refrigerant branching kit (sold separately) are needed for connection of piping between out-side units (in case of multi system) and piping branches.Use only separately sold items selected specifically according to the outside unit multi conne...
Page 10 - -5 Example of connection; Example of connection
6 English 6-5 Example of connection B1 B2 B3 B4 Example of connection (Connection of 8 indoor units) Outside unit side (3 pipes) Indoor unit side (2 pipes) Suction gas pipe HP/LP gas pipe Liquid pipe Gas pipe Liquid pipe BS Unit Suction gas pipe HP/LP gas pipe Liquid pipe (Suction) gas pipe Liquid p...
Page 11 - Outside unit multi connection piping kit and
English 7 Outside unit multi connection piping kit and Refrigerant branch kit selection Pipe size selection • Refrigerant branch kits can only be used with R410A. • When multi outdoor system are installed, be sure to use the special separately sold Outside unit multi connection piping kit. (BHFP26P9...
Page 12 - Outside unit
8 English Required Conditions Example Dr a wings 1. It is necessa y to increase the pipe siz e betw een the first br anch kit and the final br anch kit. (Reducers m ust be procured on site) Ho w e ve r, the pipes that are same pipe siz e with main pipe m ust not be increased 2. For calculation of To...
Page 13 - FIELD WIRING; -1 Power circuit, safety device and cable
English 9 7. FIELD WIRING NOTE • All field wiring and components must be installed by a licensed elec-trician and must comply with relevant local and national regulations. • Be sure to use a dedicated power circuit. Never use a power supply shared by another appliance. • Never install a phase advanc...
Page 14 - -4 Transmission Wiring Connection Procedure; NOTE; -5 Power Wiring Connection Procedure; CAUTION
10 English NOTE • Open the knock holes with a hammer or the like. • After knocking out the holes, we recommend you remove any burrs and paint them using the repair paint to prevent rusting. (Refer to figure 17-1, 2) • When passing wiring through the knock holes, remove burrs around the knock holes a...
Page 15 - -6 Procedure for Wiring Inside Units; AIR TIGHT TEST AND VACUUM DRYING; Resin hook
English 11 • When two wires are connected to a single terminal, connect them so that the rear sides of the crimp contacts face each other. Also, make sure the thinner wire is on top, securing the two wires simultaneously to the resin hook using the included clamp (1). 7-6 Procedure for Wiring Inside...
Page 16 - PIPE INSULATION
12 English <Vacuum drying> Evacuate the system from the liquid pipe, suction gas pipe, HP/LP gas pipe and equalizer pipe shutoff valve service ports by using a vacuum pump for more than 2 hours and bring the system to–14.6 psi or less. After keeping the system under that condition for more tha...
Page 17 - 1-2 Procedure of Adding Refrigerant charging and
English 13 Tightening torque The sizes of the shutoff valves on each model and the tightening torque for each size are listed in the table below. <Size of Shutoff Valve> (Refer to figure 27) 1. Service port 2. Cap 3. Hex holes 4. Shaft (valve body) 5. Seal section To open 1. Remove the cap and...
Page 18 - Less than above range
14 English CAUTION • Make sure to use the protect tool (protective groves and goggles) when charging the refrigerant. • Due to a danger of liquid hammer, the refrigerant must not be charged over the allowable maximum amount when charging the refrigerant. • Do not perform the refrigerant charging ope...
Page 19 - In case of cooling mode
English 15 • After H2P stop blinking (about 12 minutes after turning on the power), check H2P is OFF.If H2P is ON, check the malfunction code in the remote controller of indoor unit and correct the malfunction in accordance with [Remote controller display malfunction code] in chapter 11-2-2. (3) Che...
Page 21 - 3-3 Checks After Test Run; CAUTION FOR REFRIGERANT LEAKS
English 17 • If the check operation was not performed at first istallation, the malfunc-tion code “U3” will be displayed in the remote controller. Perform the check operation following “11-2-2 Procedure of Check Operation . 13-3 Checks After Test Run Perform the following checks after the test run...