Page 2 - Documentation and Resources; Document Revision History; Obtaining Documentation and Submitting a Service Request; Document Version
2 1 Documentation and Resources Documentation for the Cisco 1000 Series Aggregation Services Routers documentation is online with the exception of the regulatory compliance and safety documentation and the Cisco 1000 Series Aggregation Services Routers documentation flyer. For detailed hardware inst...
Page 3 - Prepare for Installation; Warning; Site Preparation and Unpacking
3 2 Prepare for Installation This section contains information about tools and parts, warnings, site preparation information, and information for rack-mount and equipment shelf or tabletop installation. Warning Only trained and qualified personnel should install, replace, or service this equipment. ...
Page 4 - Prepare for Rack-Mount Installation; Note; Rack-Mount the Router; Attach the Rack-Mount Brackets—Chassis Front-Mounted
4 Prepare for Rack-Mount Installation Before you begin the rack-mounting tasks: • Decide whether or not you want to front-mount or rear-mount the chassis. • Decide whether or not you want to attach cable-management brackets to your chassis. Note If you install cable-management brackets, make certain...
Page 5 - Attach the Rack-Mount Brackets—Chassis Rear-Mounted; Four-Post Rack Installation
5 Attach the Rack-Mount Brackets—Chassis Rear-Mounted To install the rack-mount on a Cisco ASR 1002 Router for a rear rack-mount configuration, follow these steps: Step 1 Locate the threaded ear holes in the rear sides of the chassis. Step 2 Position the rear rack-mount bracket top hole with the cha...
Page 7 - Tip; Two-Post Rack Installation
7 Tip To allow space to attach the cable-management brackets to the chassis in the rack easily, make certain that you use the rack-mount bracket ear holes specified in Step 9. Step 8 Hold the chassis in position against the mounting rails and follow these steps: a. Insert the bottom screw into the s...
Page 8 - Attach the Cable-Management Bracket
8 Caution If you are using a two-post rack, secure the rack to the floor surface to prevent tipping and avoid bodily injury and component damage. Step 1 Position the chassis so the front is closest to you and lift it carefully into the rack. To prevent injury, avoid any sudden twists or moves. Step ...
Page 9 - Chassis Ground Connection Installation
9 Figure 5 Attaching the Cable-Management Bracket to the Cisco ASR 1002 Router Step 3 Using the bottom rack-mount ear hole, insert the screw through cable-management bracket and into the chassis rack-mount bracket. Figure 5 shows the cable-management brackets attached to the chassis. Step 4 Using a ...
Page 11 - Connect the Router to the Network; Console and Auxiliary Port Cable Connections; The Cisco
11 Step 5 Locate the chassis ground connector on the side of your chassis. Step 6 Insert the two screws through the holes in the grounding lug. Step 7 Use the Number 2 Phillips screwdriver to carefully tighten the screws until the grounding lug is held firmly to the chassis. Do not overtighten the s...
Page 12 - Management Ethernet Port Cable Connection; Caution
12 Figure 8 Cisco ASR 1002 Integrated Route Processor Console and Auxiliary Port Connectors Step 3 After you establish normal router operation, you can disconnect the terminal. Note For console and auxiliary port pinouts, see Cisco ASR 1002 router specifications in the Cisco ASR 1000 Series Aggregat...
Page 14 - Start the System; Connect AC Power to the Cisco ASR 1002 Router
14 Proceed to the “Start the System” section on page 14 to complete the installation. 5 Start the System Before you start the system, you must connect power to it. Connect AC Power to the Cisco ASR 1002 Router This section provides instructions for installing the AC power supply into the Cisco ASR 1...
Page 15 - Connect DC Power to the Cisco ASR 1002 Router; LED Label
15 Figure 11 AC Power Supply for the Cisco ASR 1002 Router Table 1 describes the AC power supply LEDs on the Cisco ASR 1002 Router. Table 1 Cisco ASR 1002 Router AC Power Supply LEDs Note To connect an AC power supply to the Cisco ASR 1002 Router, follow the steps in Installing the AC Power Supply, ...
Page 17 - to a torque of
17 Note The color coding of the DC-input power supply leads depends on the color coding of the DC power source at your site. Typically, green or green/yellow is used for ground. Make certain the lead color coding you choose for the DC-input power supply matches lead color coding used at the DC power...
Page 18 - Verifying Power Supply operation; show platform; Start the Cisco ASR 1002 Router
18 Step 9 Connect the ground, positive, and negative leads to the power source. Step 10 Turn the branch source breaker on. Step 11 Turn the power supply switch to the On (I) position. Step 12 Verify that the LEDs illuminate. This completes the procedure for connecting DC-input power. Verifying Power...
Page 22 - Configuring the Router; Using the Console to Access the CLI; Return
22 *Feb 13 13:01:28.701: %LINK-5-CHANGED: Interface GigabitEthernet0, changed state to administratively down *Feb 13 13:01:29.728: %LINEPROTO-5-UPDOWN: Line protocol on Interface GigabitEthernet0, changed state to down *Feb 13 13:01:14.738: %CPPHA-7-SYSREADY: F0: cpp_ha: CPP client process FMAN-FP (...
Page 23 - quit; Configure Global Parameters Using the Set-up Facility
23 Router> enable Step 3 At the password prompt, enter your system password. If an enable password has not been set on your system, this step may be skipped. The following example shows entry of the password called enablepass : Password: enablepass Step 4 When your enable password is accepted, th...
Page 27 - Check the Running Configuration Settings
27 Use, duplication, or disclosure by the Government is subject to restrictions as set forth in subparagraph (c) of the Commercial Computer Software - Restricted Rights clause at FAR sec. 52.227-19 and subparagraph (c) (1) (ii) of the Rights in Technical Data and Computer Software clause at DFARS se...
Page 28 - Save the Running Configuration to NVRAM; Perform Other Configuration Tasks; configure; After Installation
28 Save the Running Configuration to NVRAM To store the configuration or changes to your startup configuration in NVRAM, use the copy running-config startup-config command to save your configuration changes to the startup configuration so that the changes will not be lost if the software reloads or ...
Page 29 - Power Off the Cisco ASR 1002 Router; reload
29 Power Off the Cisco ASR 1002 Router This section explains how to shut down the Cisco ASR 1002 Router. It is recommended that before turning off all power to the chassis, you issue the reload command. This insures that the operating system cleans up all the file systems. Once the reload operation ...
Page 30 - Replace the Shared Port Adapters; configure terminal
30 Step 2 Using the handles on both sides of the module, with two hands, gently insert the Cisco ESP5 or -ESP10 into the top chassis slot. Note Handle the Cisco ESP5 and ESP10 by the carrier edges only; never touch the printed circuit board components or connector pins. Step 3 Once the board is seat...
Page 31 - Replace a Power Supply in the Cisco ASR 1002 Router; Removing an AC Power Supply; Installing the AC Power Supply
31 Step 9 Power on the router by turning the power switch to the on (I) position. Replace a Power Supply in the Cisco ASR 1002 Router This section provides instructions for removing and replacing the AC power supply and the DC power supply in a Cisco ASR 1002 Router. Before you begin, make certain t...
Page 33 - Removing the DC Power Supply
33 Note Using a tie wrap for the AC power cable is optional and not necessary. However, if you do attach the AC power cable to a power supply tab and then you remove the AC power cable for some reason, check for any damage to the cable after you cut the tie wrap off. If the power cord is damaged, re...
Page 34 - Installing the DC Power Supply
34 Step 7 Replace the DC power supply within five minutes or the system will shutdown. You have completed the procedure for removing a DC power supply from the Cisco ASR 1002 Router. Installing the DC Power Supply This section provides information about replacing a DC power supply in the Cisco ASR 1...