Burnham 8H - Manuals
Burnham 8H – Manual in PDF format online.
Manuals:
Manual Burnham 8H
Summary
2 IMPORTANT INFORMATION - READ CAREFULLY NOTE: The equipment must be installed in accordance with those installation regulations enforced in the area where the installation is to be made. These regulations shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted b...
3 WARNING This boiler requires regular maintenance and service to operate safely. Follow the instructions contained in this manual.Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life. Read and understand the entire manual b...
4 Table of Contents I. Pre-Installation .............................................................6 II. Boiler Assembly ...........................................................8 III. Gas Control System Assembly ..................................15 (Knockdown Boilers) IV. Water Trim and Piping ...
6 I. Pre-Installation WARNING Carefully read all instructions before installing boiler. Failure to follow all instructions in proper order can cause personal injury or death. A . Inspect shipment carefully for any signs of damage. All equipment is carefully manufactured, inspected and packed. Our re...
b. If result is less than 50 ft 3 per 1,000 Btuh, space is considered a confined space . 4. Determine building type. A building of unusually tight construction has the following characteristics: a. Walls and ceiling exposed to outside atmosphere have a continuous water vapor retarder with a rating o...
8 II. Boiler Assembly A. Remove Crate 1. Remove all fasteners at crate skid.2. Lift outside container and remove with all other inside protective spacers and bracing. B. Remove boiler from skid. See Figure 2. Exercise care to avoid dropping boiler.1. Place boiler in approximate location. Refer to Se...
6. Lift boiler with pry bar. Remove wood blocks. Lower boiler. C. For Packaged Boiler only, proceed to Paragraph E. D. Test Section Assembly for leaks before connecting to system and installing controls, trim and jacket. Refer to Figure 3 and Table 3.1. Plug Tappings C & E (¾ NPT) and Return Tap...
0 F. Move boiler to permanent location by sliding or walking. Do not drop. For Packaged Boiler, proceed to Paragraph L. G. Confirm that one (1) Flue Baffle is properly positioned in each Boiler Flueway. Tabs at the top of each Flue Baffle should be resting on top row of Flue Pins on each adjoining s...
2 M. Attach Flame Roll-out Switch to Burner Access Panel. See Figure 6. Flame Roll-out Switch and hardware are located in Combination Boiler Parts and Control Carton. Flame Roll-out Switch is a single use device - do not test with heat - switch cannot be reset.1. Cut insulation from semicircular not...
6 F. EP-CSD-1 Control System Install Gas Control System . All components are located in Combination Boiler Parts and Control Carton.1. Install Gas Control Assembly on Manifold. See Figure 17. 2. Install pilot burner piping and controls. See Figure 17. 3. Install Ignition Transformer. a. Attach Ignit...
Figure 0: Schematic Gas Piping, 24V Standing Pilot, 806H & 80 H
25 IV. Water Trim and Piping A . Design and install boiler and system piping to prevent oxygen contamination of boiler water and frequent water additions.1. There are many possible causes of oxygen contamination such as:a. Addition of excessive make-up water as a result of system leaks. b. Absorptio...
2 2. If boiler is connected to heating coils located in air handling units where they may be exposed to refrigerated air, boiler piping must be equipped with flow control valves to prevent gravity circulation of boiler water during cooling system operation. 3. The piping diagrams shown (Figure 23, D...
28 a. A boiler by-pass is recommended for any installation for improved system temperature balance, while serving to protect the boiler from sustained condensing operation. The by-pass also provides some measure of low return water temperature protection by reducing flow through the boiler. See Figu...
2 V. Gas Piping WARNING Failure to properly pipe gas supply to boiler may result in improper operation and damage to the boiler or structure. Always assure gas piping is absolutely leak free and of the proper size and type for the connected load. An additional gas pressure regulator may be needed. C...
30 Length (Feet) 0.3 Inch w.c. Pressure Drop 0.5 Inch w.c. Pressure Drop ½ ¾ 1 1¼ ½ ¾ 1 1¼ 10 132 278 520 1,050 175 360 680 1,400 20 92 190 350 730 120 250 465 950 30 73 152 285 590 97 200 375 770 40 63 130 245 500 82 170 320 660 50 56 115 215 440 73 151 285 580 60 50 105 195 400 66 138 260 530 70 4...
3 A. Install vent system in accordance with local building codes; or local authority having jurisdiction; or National Fuel Gas Code , ANSI Z223.1/NFPA 54, Part 7, Venting of Equipment and/or CAN/CSA B149.1, Venting Systems and Air Supply for Appliances. Install any of the following for this Series 8...
32 E. Boiler Equipped With Vent Damper. See Figure 26. 1. Open Vent Damper Carton and remove Installation Instructions. Read Installation Instructions thoroughly before proceeding. CAUTION Do not use one vent damper to control two or more heating appliances. 2. Vent damper must be same size as draft...
33 Figure 2: Typical Vent System 9. Design vent system for sea level input. 10. Provide adequate ventilation of Boiler Room. See Section I: Pre-Installation. 11. Never pass any portion of vent system through a circulating air duct or plenum. WARNING When an existing boiler is removed from a common v...
34 VII. Electrical WARNING Failure to properly wire electrical connections to the boiler may result in serious physical harm.Electrical power may be from more than one source. Make sure all power is off before attempting any electrical work.Each boiler must be protected with a properly sized fused d...
35 E. Alliance SL™ Water Heater (if used). May be used with Intermittent Circulation only. Refer to Alliance SL™ Installation, Operating and Service Instructions for wiring, piping and additional information. F. Vent Damper Sequence of Operation. See Figure 28 for schematic wiring diagram.1. The Ven...
36 1. Standing Pilot (24) Sequence of Operation a. Normal Operation i. Thermostat or operating control calls for heat. Vent Damper (if used) opens. ii. Gas valves are energized allowing main gas flow and ignition of main burners. iii. Call or heat ends. Gas valves are de- energized, extinguishing ma...
52 WARNING Completely read, understand and follow all instructions in this manual before attempting start-up. A. Safe operation and other performance criteria were met with the gas manifold and control assembly provided on boiler when boiler underwent tests specified in American National Standard fo...
5 BOILER OPERATING INSTRUCTIONS TO SHUT DOWN: 1. Close manual main shut-off valve(s) and pilot valve(s). 2. Turn off main electric switch. TO START UP: 1. Make sure that both the main manual and the pilot valve(s) have been off for at least five minutes. 2. Turn room thermostat and all operating con...
58 I. Check pilot burner flame and main burner flames through observation port. 1. Check pilot flame. Refer to Table 11 for appropriate pilot detail. 2. Adjust thermostat to highest setting. 3. Check main burner flames. See Figure 52. Flame should have clearly defined inner cones with no yellow tipp...
5 CAUTION Avoid operating this boiler in an environment where saw dust, loose insulation fibers, dry wall dust, etc. are present. If boiler is operated under these conditions, the burner interior and ports must be cleaned and inspected daily to insure proper operation. a. Loosen lock screw.b. Close ...
6 IX. Service WARNING Service on this boiler should be undertaken only by trained and skilled personnel from a qualified service agency. Inspections should be performed at intervals specified in this manual. Maintain manual in a legible condition. Keep boiler area clear and free of combustible mater...
62 Important Product Safety Information Refractory Ceramic Fiber Product Warning : The Repair Parts list designates parts that contain refractory ceramic fibers (RCF). RCF has been classified as a possible human carcinogen. When exposed to temperatures about 1805°F, such as during direct flame conta...
63 F. Clean Combustion Chamber by vacuuming. Exercise care to avoid damaging Base Insulation. G. Install Burners by reversing procedures used to remove burners. Verify Main Burners are properly located on support bracket in Base Rear Panel, seated on Main Burner Orifices, and secured with hitch pin ...
64 Yellow LED Flash Code a Indicates Recommended Service Action Heartbeat Normal Flame Signal N/A 2 Weak Flame Signal - System will operate reliably but flame signal is less than desired. Note: This indication may flash temporarily during or shortly after lightoff on some applications. Perform routi...
65 Green LED Flash Code (X + Y) a Indicates Next System Action Recommended Service Action OFF No “Call for Heat” N/A None Flash Fast Startup - Flame sense calibration N/A None Heartbeat Normal operation N/A None 2 5 minute Retry Delay- Pilot flame not detected during trial for ignition Initiate new ...
68 Item No. Description Part No. Quantity 805H 806H 807H 808H 809H 810H . Heat Exchanger Assembly 1 Complete (Less Flue Baffles) 6171605 1 --- --- --- --- --- 6171606 --- 1 --- --- --- --- 6171607 --- --- 1 --- --- --- 6171608 --- --- --- 1 --- --- 6171609 --- --- --- --- 1 --- 6171610 --- --- --- -...
Item No. Description Part No. Quantity 805H 806H 807H 808H 809H 810H 4. Manifold and Main Burners 4A Main Burner 8231602 8 10 12 15 17 19 4B Main Burner with Pilot Bracket, Standing Pilot (24V) 8231601 --- 1 1 1 1 1 Main burner with Pilot Bracket, Honeywell EI 8231604 1 1 1 1 1 1 Main Burner with Pi...
2 Item No. Description Part No. Size Quantity 5- Gas Train -- Standing Pilot (24V, OP) 24V: USA & Canada, 6 & Section, Natural & LP Gas OP: USA & Canada, 6 - 0 Section, Natural & LP Gas A Gas Valve, Robertshaw 7000ERHC-S7C, Natural Gas, 1” NPT 81660156 806H - 810H 1 Gas Valve, Ro...
3 Item No. Description Part No. Quantity 5-2 Gas Train -- Standing Pilot (OP-CSD-) OP-CSD-: USA Only, 8-0 Section, LP Gas Only A Gas Valve, Robertshaw 7000GVERHC-S7C, LP Gas, 1” NPT 81660271 1 B Solenoid Gas Valve, Honeywell V8295A1032, 1” NPT 81660236 1 C Lubricated Manual Shut-Off Valve, Conbraco ...
4 Item No. Description Part No. Size Quantity 5-3 Gas Train -- Intermittent Ignition (EI) USA: 5 - 0 Section, Natural and LP Gas Canada: 5 - 0 Section, Natural Gas 5 - Section, LP Gas A Gas Valve, Robertshaw 7000DERHC, Natural Gas, 1” NPT 81660151 805H-810H 1 Gas Valve, Robertshaw 7000DERHC-LP, LP G...
6 Item No. Description Part No. Quantity 5-5 Gas Train -- Intermittent Ignition (EP-CSD-) USA Only: 8 - 0 Section, Natural Gas Only A Gas Valve, Robertshaw 7000GVERHC-S7C, Natural Gas, 1” NPT 81660168 1 B Solenoid Gas Valve, Honeywell V8295A1032, 1” NPT 81660236 1 C Lubricated Manual Shut-Off Valve,...
Item No. Description Part No. Size Quantity 5-6 Pilot Assembly and Piping -- Standing Pilot (24V) USA & Canada: 6 & Section, Natural and LP Gas A Pilot Burner, Honeywell Q314A3687, Natural Gas 8236033 All 1 Pilot Burner, Honeywell Q314A3828, LP Gas 8236034 B Thermocouple, Honeywell Q309A1996...
8 Item No. Description Part No. Size Quantity 5- Pilot Assembly and Piping -- Intermittent Ignition (Honeywell EI) USA 5 - 0 Section, Natural and LP Gas A Pilot Burner, Honeywell Q348A1002, Natural Gas 8236072U 805H-810H 1 Pilot Burner, Honeywell Q348A1010, LP Gas 8236081 B Igniter/Sensor Cable, 36”...
Item No. Description Part No. Size Quantity 5-8 Pilot Assembly and Piping -- Intermittent Ignition (Honeywell EI) Canada 5 - 0 Section, Natural Gas 5 - Section, LP Gas A Pilot Burner, Honeywell Q348A1002, Natural Gas 8236072U 805H-810H 1 Pilot Burner, Honeywell Q348A1010, LP Gas 8236081 805H-807H B ...
80 Item No. Description Part No. Size Quantity 5- Pilot Assembly and Piping -- Standing Pilot (OP) USA & Canada: 6 - 0 Section, Natural and LP Gas A Pilot Burner, Honeywell Q179D1008, Natural Gas 8236025 806H-810H 1 Pilot Burner, Honeywell Q179D1008 w/388146KD Orifice, LP Gas 6236039 B Thermocou...
8 Item No. Description Part No. Size Quantity 5-0 Pilot Assembly and Piping -- Standing Pilot (OP-CSD-) USA Only: 8 - 0 Section, LP Gas Only A Pilot Burner, Honeywell Q179D1008 w/388146KD Orifice, LP Gas 6236039 808H-810H 1 B Thermocouple, Honeywell Q309A1996 w/36” Lg. Lead 8236004 1 C Flame Rod Lea...
82 Item No. Description Part No. Size Quantity 5- Pilot Assembly and Piping -- Intermittent Ignition (EP) USA & Canada: 6 - 0 Section, Natural Gas Only A Pilot Burner, Honeywell Q179C1009, Natural Gas 8236017 806H-810H 1 B Flame Rod Lead, Honeywell R1298020, 4 Ft. Lg. 71362561 1 C Rajah Connecto...
83 Item No. Description Part No. Size Quantity 5-2 Pilot Assembly and Piping -- Intermittent Ignition (EP-CSD-) USA Only: 0 Section, Natural Gas Only A Pilot Burner, Honeywell Q179C1009, Natural Gas 8236017 808H-810H 1 B Flame Rod Lead, Honeywell R1298020, 4 Ft. Lg. 71362561 1 C Rajah Connector, Hon...
8 Item No. Description Part No. Quantity 805H 806H 807H 808H 809H 810H . Trim and Miscellaneous Controls A Limit, 140-220°F, Honeywell L4080D1218 (EI & Standing Pilot); L4080B1212 (EP * OP) 80160251 80160474 1 1 1 1 1 1 Immersion Well, ¾” NPT x 1½” Insul. Depth 80160426 1 1 1 1 1 1 B Limit, Manu...
88 Item No. Description Part No. Quantity 805H 806H 807H 808H 809H 810H 8. Draft Hood and Automatic Vent Damper 8A Draft Hood 8111605 1 --- --- --- --- --- 8111604 --- 1* --- --- --- --- 8111607 --- 1** --- --- --- --- 8111603 --- --- 1* --- --- --- 8111608 --- --- 1** --- --- --- 8111602 --- --- --...
Burnham Manuals
-
Burnham 81441001R8-3/06
Manual
-
Burnham IN9
Manual
-
Burnham LEDV-2
Manual
-
Burnham FM01FD00B
Manual
-
Burnham ALP150
Manual
-
Burnham IN10(3)
Manual
-
Burnham ALP080
Manual
-
Burnham 20_PV_I
Manual
-
Burnham IN12
Manual
-
Burnham Minuteman II
Manual
-
Burnham C3
Manual
-
Burnham IN3
Manual
-
Burnham CHG225
Manual
-
Burnham K50
Manual
-
Burnham PVG & SCG
Manual
-
Burnham DOE
Manual
-
Burnham HF SERIES
Manual
-
Burnham V8 Series
Manual
-
Burnham E4
Manual
-
Burnham MST396
Manual