Bogen BBF - Manual

Bogen BBF

Bogen BBF – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
Page: / 1
Loading the manual

1

A: BBS Installation

1

. Install BBS back box on wall, making sure that the box is squarely mounted.

Allow free access above box for AC wiring and above or below box for audio
wiring.

2. Have power wiring run near upper right-hand corner where box will be

mounted.

3. Secure box on wall with screws through back holes (4 screws).

Flush- and Surface-Mount Back Boxes

Models BBF and BBS - Installation and Use Manual

1

B: BBF Installation

1

. Prepare mounting hole for BBF back box. Hole size should

be 24-

1

3/

1

6" H x

1

4-5/

1

6" W minimum opening with studs

or mounting surfaces on each side.

2. Have power wiring run near upper right-hand

corner where box will be mounted.

3. Install BBF back box in wall, making sure that

the box is squarely mounted and the front sur-
face flush with the finished wall. Use shims if
necessary. Allow free access above box for AC
wiring and above or below box for audio
wiring.

4. Secure box in wall with screws through side

slots (4 screws).

5. With box positioned, install 4 additional screws

in holes next to slots.

2

: Junction Box Wiring

1

. Supply AC power to unit through conduit, BX or ROMEX in accordance with

local electrical codes.

2. Snap AC receptacle into junction box (GND pin down) and connect wires as

shown using wire nuts.

3. BBF - Install junction box in BBF and secure with four #6 x 3/8 screws.

BBS - Install junction box in BBS and secure with four #6-32 x 3/8 screws
and KEPS nuts.

50 Spring Street, Ramsey, NJ 07446, U.S.A.
Tel. 20

1

-934-8500, Fax: 20

1

-934-9832, www.bogen.com

Specifications subject to change without notice.
© 2005 Bogen Communications, Inc.
Part No. 53-5599-0

1

C 0507

4: Amplifier Installation

1

. Mount amplifier on back box by aligning hinge pins and lowering into place.

2. Connect ground strap by inserting middle hinge screws through lugs of

ground strap as shown in illustration. Ground strap must be installed to meet
UL requirements.

5: Front Panel Mounting

1

. Mount front panel (but do not tighten)

with four #8-32 x 3/8 screws at top
and bottom of panel.

2. Install two #8 x 3/8 screws on inside

lips of door opening, then tighten all
mounting screws. Do not overtighten
as U-clip will strip.

3. Check to see that door opens and

closes correctly.

3

: Preparations Before Installing Amplifier

1

. Run all audio leads into wall box. The preferred arrangement is for output

leads to enter through the top and input leads to enter through the bottom.
Use knockouts as necessary. Make sure wires do not rest against sharp edges
of box.

2. Install hinges (packed with amplifier) using 6 #8 x 3/8 screws. Do not install

middle screws of lower hinge (used for ground strap connection - see 4).

3. Check to see that AC power is available at the outlet.

BBF

Junction Box

BBF

BBS

Ground Strap

Output

Input

3. Make necessary input and output con-

nections (care should be taken to
keep input and output leads separated
as much as possible).

4. With power switch turned off, plug

AC cord into side outlet on junction
box.

5. Turn amplifier ON and check

connections.

6. Secure amplifier using three #8-32 x

1

/2 screws.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Bogen Models

All Bogen Other