Ariens 921024 - Manual

Ariens 921024

Ariens 921024 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
Page: / 29

Table of Contents:

  • Page 2 – Step One: Assemble Handlebars; NOTE: The Ariens company has made changes to
  • Page 8 – Assemble Handlebar
  • Page 9 – Install Discharge Chute
  • Page 10 – Discharge Chute Crank
  • Page 12 – Check Function of Dual Handle Interlock
  • Page 13 – Check Tire Pressure
  • Page 14 – Adjust Skid Shoes
  • Page 15 – Check Auger Gearcase Oil
  • Page 16 – Check Engine Crankcase Oil
  • Page 17 – Fill Engine Fuel Tank
  • Page 18 – Step Eleven: Starting the
  • Page 19 – Choke
  • Page 20 – Rocker Switch
  • Page 21 – Fuel Shut Off Valve
  • Page 22 – Key
  • Page 23 – Prime
  • Page 26 – Note
  • Page 27 – Warm up
  • Page 28 – Step Twelve: Stopping the Engine
  • Page 29 – Additional Resources; Refer to Owners Manual and Engine Manual
Loading the manual

Quick Start Guide

Deluxe 24 (921024 s/n 101 & up)

Step 1: Assemble Handlebars

Step 2: Install Discharge Chute

Step 3: Install Discharge Chute Crank

Step 4: Install Remote Deflector Control

Step 5: Check Function of Dual Handle Interlock

Step 6: Check Tire Pressure

Step 7: Adjust Skid Shoes

Step 8: Check Auger Gearcase Oil

Step 9: Check Engine Crankcase Oil

Step 10: Fill Engine Fuel Tank

Step 11: Start Engine

Step 12: Stop Engine

READ AND UNDERSTAND ALL INSTRUCTION, WARNING, AND DANGER LABELS.

IMPORTANT:

READ OPERATOR’S MANUAL AND ENGINE MANUAL

THOROUGHLY AND FOLLOW THE IMPORTANT SAFE OPERATION PRACTICES
BEFORE OPERATING.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Step One: Assemble Handlebars; NOTE: The Ariens company has made changes to

Step One: Assemble Handlebars NOTE: The Ariens company has made changes to packaging that affects this serial number range. If the upper handlebars on your unit came already attached please disregard the following five slides. Not attached Attached

Page 8 - Assemble Handlebar

Step One: Assemble Handlebar 1. Remove the lower and loosen the upper hardware on the handlebar assembly. 2. Loosen the hardware on the shift rod. 3. Put the speed selector lever in the sixth forward position. 4. Rotate the handlebar into operating position. NOTE: Be careful not to damage cable spri...

Page 9 - Install Discharge Chute

Step Two: Install Discharge Chute 1. Grease underside of discharge chute ring (if not already greased). 2. Remove mounting hardware from auger housing. 3. Install discharge chute over opening in the auger housing. Finger tighten the mounting hardware removed above. NOTE: Leave discharge chute pedest...

Other Ariens Models

All Ariens Other