Page 2 - AMX Limited Warranty and Disclaimer
AMX Limited Warranty and Disclaimer AMX warrants its products to be free of defects in material and workmanship under normal use for three (3) years from the date of purchase from AMX, with the following exceptions: • Electroluminescent and LCD Control Panels are warranted for three (3) years, excep...
Page 3 - Reorient or relocate the receiving antenna.; FCC RF Radiation Exposure Statement
FCC Information This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received; including interference that may cause undesired operation. Federal ...
Page 5 - Table of Contents
Table of Contents i MVP-WDS Wall Docking Station for MVP Panels Table of Contents MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box ........................... 1 Overview .................................................................................................................. 1 Speci...
Page 7 - Overview; Installation
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 1 MVP-WDS Wall Docking Station for MVP Panels MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box Overview The MVP-WDS Wall/Flush Mount Docking Station (FIG. 1) provides a surface-installed docking location. MVP-WDS stations use a securit...
Page 8 - Specifications; MVP-WDS Specifications; Front Panel Components:; Side Panel Components:; Included Accessories:
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 2 MVP-WDS Wall Docking Station for MVP Panels Specifications MVP-WDS Specifications Dimensions (HWD): • 8.59" x 12.66" x 3.40" (21.82 cm x 32.16 cm x 8.64 cm) Note : Always use the cutout/installation dimensions for the MVP-WDS whe...
Page 9 - MVP-WDS docking station connector locations; LED Pattern Indicators for the MVP-WDS; LED
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 3 MVP-WDS Wall Docking Station for MVP Panels MVP-WDS docking station connector locations FIG. 2 shows the layout of the connectors on the right side of the MVP-WDS. LED Indicators The two LEDs located within the security release pushbutton on...
Page 10 - drywall clips; Installing the CB-MVPWDS Conduit Box
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 4 MVP-WDS Wall Docking Station for MVP Panels Installation MVP-WDS wall-docking stations can be installed either the CB-MVPWDS or other solid surface environment using one of the two mounting options: drywall clips or solid surface screws, as ...
Page 11 - Removing the MVP-WDS Faceplate; Place the MVP-WDS face up on a flat level surface.; MVP Support Cradle
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 5 MVP-WDS Wall Docking Station for MVP Panels 2. Using either nails or screws, fasten the conduit box to the stud through the five Stud Fastening Holes. 3. Remove the wiring knockouts from the right side of the conduit box to accommodate cabli...
Page 12 - Security Latch
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 6 MVP-WDS Wall Docking Station for MVP Panels 4. Close the battery cover and disconnect the power connector to remove power from the unit and maintain the support cradle in the forward position. 5. Remove the two #6-32 Faceplate Security Screw...
Page 14 - Installing the MVP-WDS in a CB-MVPWDS Conduit Box; Installing the
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 8 MVP-WDS Wall Docking Station for MVP Panels Installing the MVP-WDS in a CB-MVPWDS Conduit Box The conduit box must be mounted prior to continuing this section. Refer to the Installing the CB-MVPWDS Conduit Box section on page 4 for detailed ...
Page 15 - Installing the MVP-WDS Using Expansion Clips; WDS Faceplate
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 9 MVP-WDS Wall Docking Station for MVP Panels Installing the MVP-WDS Using Expansion Clips Expansion clips are mounted through the four oval holes located along the rim of the MVP-WDS. As the screw is tightened, the clip bends toward the inser...
Page 17 - Follow the steps outlined in the; Installing the MVP-WDS Into a Flat Surface Using Mounting Screws; Refer to; The faceplate must be removed prior to any surface installation.; Replacement drywall clip sets cab be ordered from AMX.
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 11 MVP-WDS Wall Docking Station for MVP Panels 6. Tighten all four drywall clip sets (screws and clips) until both Mounting Tabs are securely fastened and flush against the wall. 7. Follow the steps outlined in the Replacing the Faceplate on t...
Page 19 - Replacing the Faceplate on the MVP-WDS; Refer to the; Connecting a Power Supply
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 13 MVP-WDS Wall Docking Station for MVP Panels Replacing the Faceplate on the MVP-WDS 1. Temporarily apply power to the MVP-WDS by connecting the terminal end of the power cable to the power supply. 2. Press the Cradle Activation Pushbutton (l...
Page 20 - Using the 3.5mm mini-Phoenix Connector for Power; the connected docking station.
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 14 MVP-WDS Wall Docking Station for MVP Panels Initially, both blue LEDs illuminate and remain dim (indicating that the power is being supplied to the MVP-WDS). Using the 3.5mm mini-Phoenix Connector for Power To use the 2-pin 3.5 mm mini-Phoe...
Page 21 - external keystrokes sent from the external USB keyboard.; Interface Connector Pins and Functions; Securing an MVP Panel to an MVP-WDS; Place the MVP-WDS on a flat and level surface.
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 15 MVP-WDS Wall Docking Station for MVP Panels If a USB keyboard has been connected, only on-screen keyboards and keypads will reflect any external keystrokes sent from the external USB keyboard. To be detected by the docking station, USB inpu...
Page 22 - Removing an MVP Panel from an MVP-WDS; Unsecured MVP removal from an MVP-WDS
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 16 MVP-WDS Wall Docking Station for MVP Panels When the MVP is properly docked, the following message is displayed on the panel (FIG. 17). Proper docking and communication can be verified via the on-screen system message, or the illuminated Do...
Page 23 - none; Installing and Charging Batteries in the Docking Stations; Installing MVP-BP Batteries Into the MVP-WDS; AMX label up
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 17 MVP-WDS Wall Docking Station for MVP Panels 5. Lift the panel off the alignment guide pins and remove it from the support cradle. Undock-<USER> String When the MVP is removed from the docking station (undocked), the undock-<user>...
Page 24 - Installing the MVP-WDS-SK Silver Conversion Kit; One Silver Cradle Pivot (; Removing the original faceplate
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 18 MVP-WDS Wall Docking Station for MVP Panels Installing the MVP-WDS-SK Silver Conversion Kit The VP-WDS-SK Silver Conversion Kit (FG5965-22) contains the following components: One Silver Cradle Bezel/Faceplate (60-5965-20SL) One Silver Cradl...
Page 25 - Close the battery cover.
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 19 MVP-WDS Wall Docking Station for MVP Panels 7. Disconnect the 2-pin mini-Phoenix connector from the side of the docking station to remove power from the unit and maintain the support cradle in this angled position. 8. Close the battery cove...
Page 26 - Removing the existing black pivot unit (battery and cradle combo); just above the USB connectors
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 20 MVP-WDS Wall Docking Station for MVP Panels 14. Press downward on the Security Latch (towards the pushbutton) to get it to go through the top opening and allow the faceplate’s removal. 15. Grab the top rim of the faceplate and carefully sli...
Page 27 - Gap opening
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 21 MVP-WDS Wall Docking Station for MVP Panels 4. Carefully remove the cradle pivot’s attachment screw and place it aside for later re-attachment. 5. Carefully slide the black pivot cradle combo unit (battery cover/support cradle) up from the ...
Page 28 - Place the black pivot combo unit aside.; Installing the new conversion kit’s pivot unit components; Gently align the second circuit board (; DO NOT OVERTIGHTEN these screws or you will crack the board.
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 22 MVP-WDS Wall Docking Station for MVP Panels 8. Carefully place the first circuit board aside and rotate the black pivot combo unit over to expose the second circuit board attached to the backside of the unit ( B in FIG. 24). 9. Carefully re...
Page 29 - Carefully secure the cradle pivot’s attachment screw.; Installing the new silver faceplate; until you hear a click
MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box 23 MVP-WDS Wall Docking Station for MVP Panels 5. Use the screwdriver to install one of the previously removed MVP Support Cradle Securing screws to the securing plate (shown in FIG. 23 on page 21). 6. Carefully slide the entire silver battery...
Page 31 - Upgrading the Docking Station Firmware; The following accessory devices are firmware upgradeable:; Step 1: Prepare the Docking Station for firmware transfer via USB; Before beginning with this section:; seconds; to continue with the setup process and proceed to the Setup page.; Batteries; Target Panel Device #
Upgrading the Docking Station Firmware 25 MVP-WDS Wall Docking Station for MVP Panels Upgrading the Docking Station Firmware The following accessory devices are firmware upgradeable: MVP-TDS Table Top Docking Station ( FG5965-10 ) MVP-WDS Wall/Flush Mount Docking Station - Black ( FG5965-11 ) MVP-WD...
Page 32 - Step 2: Upgrade the Docking Station firmware via USB; The default System value is one; and then
Upgrading the Docking Station Firmware 26 MVP-WDS Wall Docking Station for MVP Panels Step 2: Upgrade the Docking Station firmware via USB 1. Configure the panel for a USB Connection Type. 2. Prepare NetLinx Studio for communication to the panel via a Virtual Master. 3. After the Communication Verif...
Page 33 - Reboot Device; Device and System values
Upgrading the Docking Station Firmware 27 MVP-WDS Wall Docking Station for MVP Panels 10. Click the Reboot Device checkbox. This causes the touch panel to reboot after the firmware update process is complete. The reboot of the panel can take up 30 seconds after the firmware process has finished. 11....