Zephyr ES1-E30AB - Manual

Zephyr ES1-E30AB

Zephyr ES1-E30AB – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
Page: / 13

Table of Contents:

  • Page 3 – CAUTION; TABLE OF CONTENTS; WARNING
  • Page 4 – MEASURE THE INSTALLATION
  • Page 5 – PREPARE THE INSTALLATION
  • Page 8 – REINSTALL BOTTOM PANEL AND FILTERS; Do not forget to connect the ground!
  • Page 11 – REPLACEMENT PARTS; Description
  • Page 13 – Warranty; One Year Service Repair Warranty:; Metal and Charcoal Filters.; This Warranty will be Voided when:; You must present proof of original purchase date.; TO OBTAIN SERVICE UNDER WARRANTY; or any Service Related Questions, please call:; Staple your receipt here.
Loading the manual

HB0064

RANGE HOOD
INSTALLATION INSTRUCTIONS - USE AND CARE

INTENDED FOR DOMESTIC COOKING ONLY

INSTALLER: LEAVE THIS MANUAL WITH HOMEOWNER.

HOMEOWNER: CLEANING AND OPERATION INFORMATION

ON PAGES 9 AND 10.

06683 rev. A

DEC07.0101

READ AND SAVE THESE INSTRUCTIONS

!

!

MODEL ES1-E30AB, ES1-E30AS, ES1-30AW

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - CAUTION; TABLE OF CONTENTS; WARNING

Please take note this manual uses the following symbols to emphasize particular information: NOTE: Indicates supplementary information needed to fully complete an instruction. ABOUT THIS MANUAL TOOLS NEEDED TO INSTALL THE RANGE HOOD CAUTION Denotes an instruction which, if not followed, may severely...

Page 4 - MEASURE THE INSTALLATION

1. INSTALL DUCTWORK Plan where and how the ductwork will be installed. Install proper-sized ductwork, elbow(s) and roof or wall cap for the type of blower you areinstalling. If using 6’’ (150 mm) round ducts, use a transition. Use 2’’ (50 mm) duct tape toseal duct joints. Hood 3¼” x 10” duct Roof ca...

Page 5 - PREPARE THE INSTALLATION

NOTE: If the bottom of the cupboard is recessed,attach wood strips (not included), as shownbeside, in order to properly install the rangehood under the cabinet. The wood strips mustbe as thick as recess. HO0002A 2 ” 3 8 Cut-out the openings for duct ( A ) and power cable ( B ), in cabinet or wall, a...

Other Zephyr Models

All Zephyr Other