Vulcan EF5 ML-114944 - Manual
Vulcan EF5 ML-114944 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 3 – UNPACKING; Accessories packed in the fry tank include:
- Page 4 – Vulcan-Hart Fryers should be installed in accordance with:; In the United States of America:
- Page 6 – Never make flue connections directly to the fryer.
- Page 7 – OPERATION; FILL FRY TANK WITH LIQUID SHORTENING; Do not overfill tank.; OVER TEMPERATURE DEVICE
- Page 8 – LIGHTING THE PILOT; lit when knob is released.; TURNING THE FRYER ON
- Page 9 – Turn the manual gas shutoff valve OFF.; FRYING FOODS; Heat shortening to set temperature.
- Page 12 – MAINTENANCE; VENT
INSTALLATION &
OPERATION MANUAL
V U L C A N - H A R T C O M P A N Y , P . O . B O X 6 9 6 , L O U I S V I L L E , K Y 4 0 2 0 1 - 0 6 9 6 , T E L . ( 5 0 2 ) 7 7 8 - 2 7 9 1
FORM 31052 (1-98)
MODELS EF3, EF4, & EF5 ECONOFRY
GAS FRYERS
MODELS
EF3
ML-52099
EF4
ML-114943
EF5
ML-114944
Model EF3
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
— 3 — Installation, Operation and Care of MODELS EF3, EF4 & EF5 ECONOFRY GAS FRYERS KEEP THESE INSTRUCTIONS FOR FUTURE USE GENERAL Your Vulcan-Hart Gas Fryer is produced with quality workmanship and material. Proper installation,usage and maintenance will result in many years of satisfactory per...
— 4 — LOCATION The equipment area must be kept free and clear of combustible substances. Minimum clearance fromcombustible construction is 6" (152.4mm) from the sides and 6" (152.4mm) from the back of the fryer;minimum clearance from non-combustible construction is 0" from the sides and ...
— 6 — LEVELING THE FRYER Once gas connections have been made, place a spirit level on top of the fryer. Adjust the legs to ensurethat the fryer is level front-to-back and side-to-side in the final installed position. FLUE CONNECTIONS Adequate ventilation must be provided and must comply with NFPA St...