Trion 60 - Manual

Trion 60

Trion 60 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
Page: / 29

Table of Contents:

  • Page 3 – SECTION I DESIGN; FOR THE SYSTEM DESIGN ENGINEER
  • Page 4 – SECTION II INSTALLATION
  • Page 6 – SECTION III OPERATION & SERVICE; WARNING
  • Page 7 – Maintenance
  • Page 10 – Troubleshooting Reference Chart
  • Page 25 – Model 60 Control Schematic; THIS PAGE INTENTIONALLY LEFT BLANK; DETAILED SCHEMATIC DRAWINGS WILL BE PROVIDED
  • Page 26 – Model 60 Field Wiring; DETAILED FIELD WIRING DRAWINGS WILL BE PROVIDED
Loading the manual

Field Assembled

ELECTRONIC

AIR CLEANER

AIR BOSS Model 60 Series

without

Integral Washing System

INSTALLATION

OPERATION

SERVICE

For Model Numbers

60- ___-01

Electrostatic Precipitators for

Commercial & Industrial

Applications

101 McNeill Road

Sanford, NC 27330

(919) 775-2201

Fax: (919) 774-8771

(800) 884-0002

www.trioninc.com

MANUAL Form No. 61-0147B

Sept 01

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - SECTION I DESIGN; FOR THE SYSTEM DESIGN ENGINEER

3 SECTION I DESIGN FOR THE SYSTEM DESIGN ENGINEER 1. General Description Model 60 equipment consists of factory-assembledcomponents to be “built-up” in the field into a completedunit. Depending on the system requirements, theinstallation may consist of a single unit or a multi-sectionunit. A multi-s...

Page 4 - SECTION II INSTALLATION

4 C.) The basin floor should be properly pitched and finished to prevent puddling. D.) The cross members containing the anchoring studs to receive the air cleaner base frame must be evenand level to provide a proper foundation for themetal framework base. Where the installation site is not suitable ...

Page 6 - SECTION III OPERATION & SERVICE; WARNING

6 convenient location near the door. Those locatedinside are wired in series with the electricalinterlocks and used as a safety measure to controlthe primary power to the high voltage powersupplies from inside the duct. Those located outsidecontrol the duct lights. Grounding An earth ground must be ...

Other Trion Models

All Trion Other