3 SECTION I DESIGN FOR THE SYSTEM DESIGN ENGINEER 1. General Description Model 60 equipment consists of factory-assembledcomponents to be “built-up” in the field into a completedunit. Depending on the system requirements, theinstallation may consist of a single unit or a multi-sectionunit. A multi-s...
4 C.) The basin floor should be properly pitched and finished to prevent puddling. D.) The cross members containing the anchoring studs to receive the air cleaner base frame must be evenand level to provide a proper foundation for themetal framework base. Where the installation site is not suitable ...
6 convenient location near the door. Those locatedinside are wired in series with the electricalinterlocks and used as a safety measure to controlthe primary power to the high voltage powersupplies from inside the duct. Those located outsidecontrol the duct lights. Grounding An earth ground must be ...