Thermo Pride PGL33-250 - Manual

Thermo Pride PGL33-250

Thermo Pride PGL33-250 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
Page: / 38

Table of Contents:

  • Page 4 – This furnace is not to be used as a construction heater.; TURN OFF THE ELECTRICAL POWER; to the furnace before attempting to change blower speed wiring.
  • Page 5 – I. GENERAL INSTRUCTIONS
  • Page 7 – 00 square inches is required regardless of the input.
  • Page 9 – An agency approved gas barometric control or draft diverter; must; be installed. The draft control device must
  • Page 12 – TYPICAL PIPING FOR TWO STAGE REGULATION
  • Page 14 – TWO PIECE MOUNTING PLATE; Do not place loose insulation around chamber sides and back.; BURNER INSERTION
  • Page 15 – with combustion equipment and a carbon monoxide detector.; It; requires combustion equipment and a
  • Page 17 – or O; L. REQUIREMENTS AND SIZING OF DUCT WORK
  • Page 18 – DUCT SIZES FOR HOMES, QUIET OFFICES OR SIMILAR INSTALLATIONS
  • Page 29 – See burner manufacturer instructions for troubleshooting.
  • Page 32 – Remove cleanout
  • Page 34 – VII. REPLACEMENT PARTS
Loading the manual

THERMO

PRODUCTS,LLC.

BOX 217

NORTH

JUDSON,

IN

46366

PHONE: (574) 896-2133


MG-807C

ECN 4403-MA

MADE IN USA

INSTALLATION AND SERVICE MANUAL

MODELS:

PGT5-100, PGT11-125, PGT16-160,

PGL20-180, PGL33-250, PGL37-312, & PGL39-400

?

?

?

?

WARNING

:

IF YOU DO NOT FOLLOW THE SAFETY PRECAUTIONS BELOW AND IN THIS

MANUAL, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY,
OR LOSS OF LIFE.

DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE
VICINITY OF THIS OR ANY OTHER APPLIANCE.

WHAT TO DO IF YOU SMELL GAS:

DO NOT TRY TO LIGHT ANY APPLIANCE.

DO NOT TOUCH ANY ELECTRICAL SWITCH; DO NOT USE ANY PHONE IN YOUR BUILDING.

LEAVE THE BUILDING IMMEDIATELY.

IMMEDIATELY CALL YOUR GAS SUPPLIER FROM A NEIGHBOR’S PHONE. FOLLOW THE GAS
SUPPLIER’S INSTRUCTIONS.

IF YOU CANNOT REACH YOUR GAS SUPPLIER; CALL THE FIRE DEPARTMENT.

INSTALLATION AND SERVICE MUST BE PERFORMED BY A QUALIFIED INSTALLER, SERVICE
AGENCY OR THE GAS SUPPLIER. (REFERRED TO IN THESE INSTRUCTIONS AS A QUALIFIED
HEATING CONTRACTOR).

PLEASE READ THESE INSTRUCTIONS PRIOR TO INSTALLATION, INITIAL FIRING, AND BEFORE
PERFORMING ANY SERVICE OR MAINTENANCE. THESE INSTRUCTIONS MUST BE LEFT WITH THE
HOMEOWNER AND SHOULD BE RETAINED FOR FUTURE REFERENCE BY QUALIFIED SERVICE
PERSONNEL.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 4 - This furnace is not to be used as a construction heater.; TURN OFF THE ELECTRICAL POWER; to the furnace before attempting to change blower speed wiring.

All installations and services must be performed by qualified service personnel. 2 This page contains various warnings and cautions reproduced from the Power Gas Furnace Manual. Please read and comply with the statements below . CAUTION: When installing the burner, it should be noted that the loose ...

Page 5 - I. GENERAL INSTRUCTIONS

All installations and services must be performed by qualified service personnel. 3 I. GENERAL INSTRUCTIONS These instructions must be read in their entirety before installing the furnace. It is the installer's responsibility to do the following: 1. Inform and demonstrate to the user, the correct ope...

Page 7 - 00 square inches is required regardless of the input.

All installations and services must be performed by qualified service personnel. 5 EXAMPLE: 100,000 BTUH input furnaces requires "two" openings of 100 square inches each. A minimum opening of 100 square inches is required regardless of the input. If the building is tightly constructed and or...

Other Thermo Pride Models

All Thermo Pride Other