Page 2 - MANUFACTURED MOBILE HOME REQUIREMENTS; INFORMATION FOR MOBILE/MANUFACTURED HOMES AFTER FIRST SALE; This Regency
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 2 To the New Owner: Congratulations! You are the owner of a state-of-the-art Gas Fireplace by REGENCY ® . The P121 / P121LC / P121RC / P131 is a hand crafted appliance and has been designed to provide you with all the...
Page 3 - TABLE OF CONTENTS
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 3 TABLE OF CONTENTS OPERATING INSTRUCTIONS Operating Instructions ................................................. 34Lighting Procedure ...................................................... 34Shutdown Procedure .......
Page 4 - SAFETY LABEL
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 4 This is a copy of the label that accompanies each P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace. We have printed a copy of the contents here for your review. The safety label is located on...
Page 5 - REQUIREMENTS; MA Code - CO Detector
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 5 REQUIREMENTS 5.08: Modifications to NFPA-54, Chapter 10 (2) Revise 10.8.3 by adding the following additional requirements: (a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, ...
Page 6 - Note: These units are; INSTALLATION; YOUNG CHILDREN SHOULD BE
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 6 INSTALLATION CHECKLIST Note: These units are non-load bearing. 1) Locate appliance. Refer to the following sections: a) Locating Your Fireplace b) Clearances c) Combustible Mantel Clearances d) Framing & Finishi...
Page 7 - SPECIFICATIONS
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 7 INSTALLATION SPECIFICATIONS P121-2 See Thru P131-2 Pier Note: These units are non-load bearing.
Page 10 - COMBUSTIBLE MANTELS; Mantel Clearances
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 10 INSTALLATION COMBUSTIBLE MANTELS CLEARANCES The clearances listed below are Minimum distances unless otherwise stated (refer to diagrams in the "Locating Your Fireplace" section): WARNING: Fire hazard is an...
Page 11 - FRAMING AND FINISHING; Framing Dimensions
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 11 B C A FRAMING AND FINISHING P121-2 - See Thru P131-2 - Pier Framing Dimensions P121-2 (See Thru) P131-2 (Pier) P121LC-2 / P121RC-2 (Corner Unit) A 25"(635mm) 25"(635mm) 26-13/16" minus two times minus t...
Page 12 - Top Standoff Assembly
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 12 VENTING INTRODUCTION The P121-2/P121LC-2/P121RC-2/P131-2 uses the "balanced fl ue" technology Co -Axial system. The inner liner vents products of combustion to the outside while the outer liner draws outside...
Page 13 - EXTERIOR VENT TERMINATION LOCATIONS
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 13 INSTALLATION EXTERIOR VENT TERMINATION LOCATIONS A= Clearance above grade, veranda, porch, deck, or balcony *(min. 12"/30cm) B= Clearance to window or door that may be opened *(12"/30cm) #(9"/23cm) C= C...
Page 14 - RIGID PIPE VENTING COMPONENTS LIST
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 14 INSTALLATION FPI946-506/P Vent Guard (Optional) 510-994 Rigid Pipe Adaptor (Must use with all Rigid Piping) 640-530/P Riser Vent Terminal 946-205 Vinyl Siding Shield for Riser Vent Terminal 946-208/P Vent Guard (Op...
Page 15 - VENTING ARRANGEMENT - HORIZONTAL TERMINATIONS
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 15 VENTING ARRANGEMENT - HORIZONTAL TERMINATIONS Regency ® Direct Vent System (Flex) Horizontal Terminations Only These venting systems, in combination with the P121-2/P121LC-2/P121RC-2/P131-2 Direct Vent Gas Fireplac...
Page 16 - RIGID PIPE VENTING SYSTEMS; Horizontal or Vertical Terminations; Flat Wall Installation
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 16 Pipe Length Vertical Terminal Storm Collar Part # 953 Flashing 943 or 943S Ceiling Firestop (Part # 963) 24" Pipe Length Adj.Pipe Length 11" - 14-5/8" 90 Elbow o Horizontal Termination Cap Wall Thimble ...
Page 17 - Option; RIGID PIPE VENTING ARRANGEMENTS; Straight Out Horizontal Venting
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 17 Option V H A) 1' (305mm) Minimum 3' (914mm) Maximum B) 2' (610mm) Minimum 6' (1.86m) Maximum C) 3' (914mm) Minimum 9' (2.7m) Maximum D) 4' (1.22m) Minimum 12' (3.6m) Maximum E) 5' (1.5m) Minimum 15' (4.5m) Maximum ...
Page 18 - Elbows
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 18 INSTALLATION Diagram 3 Horizontal Venting with Two (2) 90 o Elbows Horizontal Venting with Two (2) 90 o Elbows Horizontal Venting with Three (3) 90 o Elbows Horizontal Venting with Three (3) 90 o Elbows Diagram 5 D...
Page 19 - RIGID PIPE VENTING ARRANGEMENTS - VERTICAL TERMINATIONS; Straight Up Vertical Venting; IMPORTANT
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 19 INSTALLATION RIGID PIPE VENTING ARRANGEMENTS - VERTICAL TERMINATIONS (Propane & Natural Gas) • Vent must be supported at offsets • Maintain clearances to combustibles as listed in the "Clearances" secti...
Page 21 - HORIZONTAL
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 21 INSTALLATION HORIZONTAL TERMINATIONS Install the vent system according to the manufacturer's instructions included with the components. 1) Set the unit in its desired location. Check to determine if wall studs or r...
Page 23 - Do not locate termination; Offset Chart; for Regency; Direct
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 23 INSTALLATION 5) Slip the assembled liner and termination assembly through the thimble making sure the termination cap faces up (there are markings on the cap that show which way is up). This will position the termi...
Page 24 - THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 24 CONVERSION KIT #731-969 FROM NG TO LP FOR P121-2/P121LC-2/P121RC-2/P131-2 USING SIT 820 NOVA GAS VALVE THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER IF IN DOUBT DO NOT DO THIS CONVERSION !! INSTALLATION 5)...
Page 25 - Installation of the DC Sparker:
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 25 F i g . 3 17) Reverse steps 4) to 1). 18) Attach the label "This unit has been converted to LPG" near or on top of the serial # decal. 19) Replace yellow "NG" label with red "LPG" label. WAR...
Page 26 - These instructions must be left
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 26 25) Locate the ground lug at the receptical box, left of the unit. Installer Notice: These instructions must be left with the appliance. 26) Connect one end of the supplied green ground wire to the lug with the nut...
Page 28 - LOG INSTALLATION
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 28 INSTALLATION LOG INSTALLATION Read the instructions below carefully and refer to the diagrams. If logs are broken do not use the unit until they are replaced. Broken logs can interfere with the pilot operation. Log...
Page 30 - FINISHING TRIM
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 30 GLASS DOOR REMOVAL 1) Remove the 8 screws that secure the glass door. INSTALLATION 2) Pull the door slightly out on an angle and then lift up and pull completely out. 3) P131 & P121LC/P121RC Corner Model: Remov...
Page 31 - Thermostat Wire Table; WALL THERMOSTAT
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 31 Option 1: REMOTE CONTROL Can be used with Option 2 or 3 but not both. Use the Regency ® Remote Control Kit approved for this unit. Use of other systems may void your warranty. The remote control kit comes with a ha...
Page 32 - WIRING DIAGRAMS; Lockwasher; Grounding Lug Detail; Star washer; Gas; For; NATURAL GAS; Units and Units; NOT; Equipped with DC Spark Boxes
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 32 WIRING DIAGRAMS Caution: Ensure that the wires do not touch any hot surfaces and are away from sharp edges. CAUTION: Label all wires prior to disconnection when servicing controls.Wiring errors can cause improper a...
Page 33 - Terminal Block Location; PROPANE; Units and Units Equipped with DC Spark Boxes*
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 33 Terminal Block Location Terminal Block Remove cover to access Terminal Block Lockwasher Ground Wire Nut #8 Ground Lug (for mobile home) Grounding Lug Detail Star washer Thermodisc Green (Ground)White (Neutral)Black...
Page 34 - OPERATING INSTRUCTIONS
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 34 LIGHTING PROCEDURE NOTE: For all propane units and units equipped with electric spark boxes, see "Copy of Lighting Plate Instruc-tions" section for more details. Only when the pilot holds, without pressure ...
Page 35 - COPY OF THE LIGHTING PLATE INSTRUCTIONS; NORMAL OPERATING
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 35 COPY OF THE LIGHTING PLATE INSTRUCTIONS OPERATING INSTRUCTIONS NORMAL OPERATING SOUNDS OF GAS APPLIANCES It is possible that you will hear some sounds from your gas appliance. This is perfectly normal due to the fa...
Page 36 - MAINTENANCE; GLASS REPLACEMENT; General Vent Maintenance
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 36 MAINTENANCE 2) Remove the Cap, and shine a fl ashlight down the Vent. Remove any bird nests, or other foreign material. 3) C h e c k f o r e v i d e n c e s o f e x c e s s i v e condensation, such as water droplets...
Page 37 - REMOVING VALVE
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 37 12) Lift the entire assembly out. 8) Remove the Side Base Brick Panels and fi nally the Long Base Brick Panels. MAINTENANCE Remove Left & Right Side Base Brick Panels Remove the 2 Long Base Brick Panels 9) Disco...
Page 38 - FAN REPLACEMENT; INSTALLING VALVE
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 38 FAN REPLACEMENT 1) Shut off power. 2) Remove top louvers. 3) Unplug power wires. 4) Remove 4 screws securing fan to mounting bracket. MAINTENANCE 5) Remove 2 connector wires. 6) Replace fan. 7) Repeat for opposite ...
Page 39 - PARTS LIST
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 39 100 99 98 181 181 34 11 34 34 32 B R IC K PA N E LS 9 146 146 168 146 172 1 135 204 204 172 17 206 24 10 206 146 207 150 151 204 171 1 171 204 205 205 PARTS LIST P121-2 (SEE THRU) MAIN ASSEMBLY 1) 360-528 Door Assy...
Page 44 - NOTES
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 44 NOTES ___________________________________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ ...
Page 47 - WARRANTY
Regency ® P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace 47 WARRANTY Regency ® Fireplace Products are designed with reliability and simplicity in mind. In addition, our internal Quality Assurance Team carefully inspects each unit thoroughly before it leaves our facility. FP...
Page 48 - Installer: Please complete the following information; Printed in Canada
Installer: Please complete the following information Dealer Name & Address: ______________________________________________ ___________________________________________________________________ Installer: ___________________________________________________________ Phone #: _________________________...