Raypak 265 - Manual
Raypak 265 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – POWER VENT ASSEMBLY; RECEIVING EQUIPMENT; GENERAL SPECIFICATIONS
- Page 3 – INSTALLATION REQUIREMENTS; MOUNTING POWER VENT ASSEMBLY; down to the appliance.
- Page 4 – WIRING A POWERVENT ASSEMBLY TO AN APPLIANCE WITH IID IGNITION.; WARNING
- Page 5 – VENTING; Reduced Maximum Equivalent Vent Run (feet)
- Page 6 – CATEGORY III; a negative draft in the system. Consult sizing guide or factory.
- Page 11 – SEQUENCE OF OPERATION; Dimensional Data
- Page 13 – ILLUSTRATED PARTS LIST
OPERATING AND
INSTALLATION
INSTRUCTIONS
Models
185, 265, 335, 405
Swimming Pool and Spa Heaters
181/182, 260/261, 330/331, 400/401
Water Heaters and Boilers
D-2 POWER VENT
(FOR ELECTRONIC IGNITION MODELS ONLY)
CATALOG NO. 6000.57D
Effective:
10-26-06
Replaces: 03-15-03
FOR YOUR SAFETY
Do not store or use gasoline or other flammable vapors and liquids or other combustible
materials in the vicinity of this or any other appliance. To do so may result in an explosion
or fire.
WARNING:
Improper installation, adjustment, alteration, service or maintenance can cause
property damage, personal injury or loss of life. Refer to the user ’s information manual
provided with this heater. Installation and service must be performed by a qualified in-
staller, service agency or the gas supplier.
FOR YOUR SAFETY
WHAT TO DO IF YOU SMELL GAS:
·
Do not try to light any appliance.
·
Do not touch any electrical switch; do not use any phone in your building.
·
Immediately call your gas supplier from a neighbor ’s phone. Follow the gas
supplier ’s instructions.
·
If you cannot reach your gas supplier, call the fire department.
This manual should be maintained in legible condition and
kept adjacent to the appliance or kept in a safe place for
future reference.
P/N 241086 Rev. 1
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
POWER VENT ASSEMBLY INSTALLATION, START-UP AND OPERATION 1. RECEIVING EQUIPMENT On receipt of your equipment it is suggested that you visually check for external damage to the carton. If the carton is damaged, it is suggested that a note be made on the Bill of Lading when signing for equipment.Remov...
3 3. INSTALLATION REQUIREMENTS The equipment must be installed in accordance with local codes, or in the absence of local codes with the latest edition of the National Fuel Gas Code, ANSI Z223.1, the National Electrical Code, ANSI/NFPA 70. The equipment shall be installed in accordance with those in...
4 WIRING A POWERVENT ASSEMBLY TO AN APPLIANCE WITH IID IGNITION. WARNING : Disconnect all electrical power to the unit before servicing to avoid potential shock injury or damage to the unit. To change voltages, follow wiring diagram for correct voltageconnections. Improper wiring connections can bur...