Premier Mounts XL6000CM - Manual
Premier Mounts XL6000CM – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – TABLE OF CONTENTS; Installation Instructions; Warning Statements
- Page 3 – Parts List; of the PDS Series Projector Mount.; Installation Tools; Phillips Head Screw Driver; LOCK-ITTM Security System
- Page 4 – Ceiling Installation; Figure 3
- Page 5 – Figure 4; NOTE; Attaching the Projector; Do not fully loosen the screws, as the
- Page 6 – Figure 6
- Page 7 – Technical Specifications
- Page 8 – will be shipped to you at no charge, but you must pay any labor costs.
- Page 9 – XL6000CM Projector Bracket Installation Instructions
- Page 10 – Security System
XL6000CM
Projector Mount
Installation Instructions
NORTH AMERICA
3130 East Miraloma Avenue
Anaheim, CA 92806 USA
USA and Canada -
Phone: 800-368-9700
Fax: 800-832-4888
EUROPE
Swallow House,
Shilton Industrial Estate,
Shilton, Coventry, England CV79JY
Phone: +44 (0) 2476 614700
Fax: +44 (0) 2476 614710
AUSTRALIA, NEW ZEALAND,
OCEANIA (DISTRIBUTOR)
P.O. Box 295
Mordialloc Victoria 3195
Australia
Phone: 03 9586 6330
9530-019-461-01
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
XL6000CM TABLE OF CONTENTS Warranty 2 Contact Premier Mounts 2 Parts List 3 Installation Tools 3 Ceiling Installation 4 Attaching the Projector 5 Adjusting the Projector 5 Optional Installations 6 AST-2446 Installation/ Custom Length Pipe (1 ½ 6 ) T P N ” PP-FCTA Installation 6 Technical Specificati...
XL6000CM Installation Instructions Page 3 Congratulations on the purchase of your new Premier Mounts PDS Projector Mount. Parts List This mount is shipped with all installation hardware and components. Make sure that none of these parts are missing and/ or damaged before beginning installation. If t...
XL6000CM Page 4 Installation Instructions 1. Separate the Upper Bridge from the Base Box by removing the six (6) M6 x 12mm Phillips Head screws three on each side (Figure 1). Upper Bridge Base Box Figure 1 Ceiling Wood Stud Ceiling Surface #14 x 2” Wood Screws Upper Bridge 2. Use the appropriate slo...