Nutone CV352 - Manual
Nutone CV352 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – THE RANCH STYLE HOUSE
- Page 3 – THE SPLIT-LEVEL HOUSE
- Page 4 – INSTALLATION IN NEW CONSTRUCTION; INSTALLATION HINTS; INSTALLING THE TUBING
- Page 5 – TUBING INSTALLATION; NAIL PLATE INSTALLATION
- Page 6 – WALL INLET INSTALLATION
- Page 7 – DIMENSIONAL CHART; POWER UNIT INSTALLATION; MOUNTING; TUBING CONNECTIONS
- Page 8 – INSTALLATION IN EXISTING CONSTRUCTION; LAYOUT AND PLANNING
- Page 10 – MODEL 330N WALL INLET INSTALLATION; FLOOR INLET INSTALLATION; INSTALLATION IN NEW AND EXISTING CONSTRUCTION
- Page 11 – FINAL SYSTEM CHECK
- Page 12 – Two Year Limited Warranty
BUILT-IN CENTRAL
CLEANING SYSTEM
MODEL: CV-352
GENERAL INFORMATION
..............
2
LAYOUT AND PLANNING
...............
2
Examples ........................................2
Locating the Power Unit ..................3
Locating the Wall Inlets ...................3
Tubing .............................................3
INSTALLATION IN
NEW CONSTRUCTION
....................
4
Wall Inlet Rough-In .........................4
Installing the Tubing ........................4
Installation Hints............................4
Tubing Installation .........................5
Wall Inlet Installation .......................6
Model 360 Wall Inlet .....................6
Model 330 Wall Inlet .....................6
Power Unit Installation ....................7
Dimensional Chart ........................7
Mounting .......................................7
Tubing connections .......................7
Wiring ............................................7
INSTALLATION IN
EXISTING CONSTRUCTION
...........
8
Layout and Planning .......................8
Locating Access Keys .....................8
Wall Inlet Installation .......................8
Model 330 Wall Inlet ...................10
FLOOR INLET INSTALLATION
.....
10
FINAL SYSTEM CHECK
................
11
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 GENERAL INFORMATION LAYOUT AND PLANNING EXAMPLES The NuTone Central Cleaning System consists of a Central Power Unit, PVC Tubing, PVC Fittings, automatic switchoperated Wall Inlets, a flexible hose and various cleaningattachments. As an aid in planning the installation, look at the following examp...
3 FIGURE 3 THE SPLIT-LEVEL HOUSE Like the two-story house, the split level installation commonly calls for a two-level trunk line.Here, the power unit islocated in the garage.The intake tubing runsexposed up thegarage wall andinto the ground levelsection's attic. Two branch linesconnect this part of...
4 INSTALLATION IN NEW CONSTRUCTION WALL INLET ROUGH-IN 1. Once the locations for wall inlets have been determined, mount all inlet brackets. 2. To locate bracket on wall stud, measure approximately 18" up from finished floor level. (Height may vary according toindividual preference.) 3. Refer to...