Mitsubishi Electric PVFY-P-E00A - Manual
Mitsubishi Electric PVFY-P-E00A – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Safety Precautions; Before installing the unit, make sure you read all the “Safety; Precautions for devices that use R410A refrigerant.
- Page 4 – Installation Clearances; Vertical Applications:; The air handler must be supported on the; REFRIGERANT PIPING; Unit Mounted on Return Plenum; Cautions of refrigerant piping; Platform Mounting; Caution: COIL UNDER PRESSURE; Suspended Mounting
- Page 5 – Unit size; finger tight; ELECTRICAL WIRING
- Page 6 – Typical transmission wire connections
- Page 7 – Attach shielding ground on the outdoor unit’s ground terminal.; Connecting Line Voltage; Make sure power supply is off.; 08 Volt Power Supply; Setting addresses
- Page 8 – Step 1; Remove wire on connector 2 and reinstall on connector 1; Step 2; Remove wire on connector 3 and reinstall on connector 2; Step 3; Remove wire on connector 4 and reinstall on connector 3
Manufactured For MITSUBISHI
ELECTRIC & ELECTRONICS USA
Air-Conditioners for Building Application
INDOOR UNIT
PVFY-P-E00A Concealed Vertical Air handler
For Use with CITY MULTI Outdoor Units Only
INSTALLATION MANUAL
For safe and correct use, please read this installation manual thoroughly before
installing the air-conditioner.
Page
1. Inspect
Shipment
1
2. Safety
Precautions
2
3.
Selecting and Installation site
3
4.
Installing the unit
3
5. Refrigerant
Piping
4
6. Drain
Connections
5
7. Electrical
Wiring
5
INSPECT SHIPMENT
These air handlers are completely factory assembled, and all components are performance tested. Each unit
consists of a blower assembly, refrigerant coil and controls in an insulated, galvanized steel factory enclosure.
Knockouts are provided for electrical wiring entrance.
1. Check the unit rating plate to confirm specifications are as ordered.
2. Upon receipt of equipment, carefully inspect it for possible damage. Take special care to examine the unit if
the carton is damaged.
If damage is found, it should be noted on the carrier’s freight bill. Damage claims should be filed with the carrier
immediately. Claims of shortages should be filed with the seller within 5 days.
1
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 Safety Precautions • Before installation and electric work Before installing the unit, make sure you read all the “Safety precautions”. The “Safety precautions” provide very important points regarding safety. Make sure you follow them. • Symbols used in the text Warning: Describes precautions that...
Installation Clearances TOP View Horizontal Installation 24" 24" Width of Unit TOP View Vertical Installation Length of Unit Clearance Area Clearance Area 4 Vertical Applications: The air handler must be supported on the bottom only and set on a solid floor with a return plenum below or fiel...
Schrader valve Front panel Vapor Connection Cut here afterrelieving pressure 5 Always use proper refrigerant line sizes as shown: Unit size P12, P18 1/4” liquid x 1/2” gas P24 – P54 3/8” liquid x 5/8” gas Both refrigerant lines need to be insulated all the way up to the cabinet. Make sure the openin...