Maytag MLG23PD - Manual
Maytag MLG23PD – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Typical tools needed for installation:; SPACE REQUIREMENTS; ITEMS PROVIDED
- Page 3 – FRONT VIEW
- Page 6 – Exhaust Hood Type; rigid metal duct; NEVER USE PLASTIC; If your existing ductwork is plastic, non-metal or
- Page 7 – If multiple units are exhausted into a common duct:; ELECTRICAL CONNECTION; Electric Single Dryer:; -Wire and Ground System
- Page 8 – DO NOT; use a naked flame to check for gas; There is no constant burning pilot light.; COMMERCIAL INSTALLATION ACCESSORIES
- Page 9 – WARNING –; TECHNICAL SPECIFICATION; (see dataplate by door opening for full model details)
- Page 10 – ANTES DE COMENZAR; REQUISITOS DE ESPACIO; ARTÍCULOS SUMINISTRADOS
- Page 11 – VISTA FRONTAL
- Page 14 – Tipo de cubierta de ventilación; NO USE NUNCA CONDUCTOS DE PLÁSTICO O NO METÁLICOS FLEXIBLES.
- Page 15 – Si varias unidades se ventilan a un conducto común:; CONEXIÓN ELÉCTRICA; SECADORA SOLA ELÉCTRICA:; Sistema de conexión a tierra y 2 conductores
- Page 16 – CONEXIONES AL SUMINISTRO DE GAS; No existe una; ACCESORIOS DE INSTALACIÓN COMERCIAL
- Page 17 – ADVERTENCIA –; ESPECIFICACIONES TECNICAS
- Page 18 – REQUISITI DI SPAZIO; ELEMENTI COMPRESI NELLA FORNITURA
- Page 19 – VISTA FRONTALE
- Page 22 – Tipo cappa di scarico; SISTEMA DI SCARICO; NON USARE MAI TUBI FLESSIBILI DI PLASTICA O NON METALLICI.
- Page 23 – Se in un tubo comune arrivano gli scarichi di più unità:; ALLACCIAMENTO ELETTRICO; Sistema di collegamento a terra e a 2 fili
- Page 24 – ALLACCIAMENTO AL GAS; NON USARE; Non esiste una spia pilota di combustione costante.; ACCESSORI INSTALLAZIONI COMMERCIALI
- Page 25 – AVVERTENZA; SPECIFICA TECNICA; Modello a gas
COMMERCIAL
GAS & ELECTRIC DRYERS
INSTALLATION INSTRUCTIONS
MODELS:
MDG21PN, MDG21PD, MDG16PD, MDG16MN, MDG16CS, MLG23PD,
MDE21PN, MDE21PD, MDE16PD, MDE16MN, MDE16CS, MLE23PD
SECADORAS COMERCIALES
DE GAS Y ELÉCTRICAS
INSTRUCCIONES DE INSTALACIÓN
MODELOS:
MDG21PN, MDG21PD, MDG16PD, MDG16MN, MDG16CS, MLG23PD,
MDE21PN, MDE21PD, MDE16PD, MDE16MN, MDE16CS, MLE23PD
ISTRUZIONI DI INSTALLAZIONE
DI ASCIUGA-BIANCHERIA
COMMERCIALI A GAS ED ELETTRICI
MODELLI:
MDG21PN, MDG21PD, MDG16PD, MDG16MN, MDG16CS, MLG23PD,
MDE21PN, MDE21PD, MDE16PD, MDE16MN, MDE16CS, MLE23PD
LEAVE THESE INSTRUCTIONS WITH THE OWNER
DEJE ESTAS INSTRUCCIONES CON EL PROPIETARIO
QUESTE ISTRUZIONI DEVONO ESSERE CONSERVATE DAL PROPRIETARIO
Printed in U.S.A. • Impreso en los Estados Unidos • Stampato negli Stati Uniti
2202408
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Page 1 1. BEFORE YOU START Typical tools needed for installation: • PTFE tape • Spirit level • Jointing compound • Screwdrivers • Cutting knife • Duct tape • Pipe wrench (heat resistant) • Adjustable spanners • T20 security torx screwdriver WARNINGS: Read these instructions carefully before you star...
Page 2 It is important to allow space around the dryer for adequate ventilation and exhausting. The minimum spacingrequirements are shown in the figure below: 0 cm 0 cm 56,5 cm (22 1/4”) 1 cm Minimum FRONT VIEW SIDE VIEW 0 cm
USE A MINIMUM OF 100mm (4”) DIAMETER RIGID ALUMINUM OR RIGID GALVANIZED STEEL DUCT.Do not use smaller duct. Ducts larger than 100mm can result in increased lint build-up. Any lint build-upshould be cleaned regularly. If flexible metal must be used in some areas, use the type with a stiff sheetmetal ...