Lennox GWB8-042IE-2 - Manual
Lennox GWB8-042IE-2 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – TABLE OF CONTENTS; Safety Symbols & Warnings; The following de; NOTICE; CAUTION; IMPORTANT: Read the following instructions; KEEP THIS MANUAL NEAR BOILER; fl; WARNING
- Page 3 – BOILER RATINGS & CAPACITIES; heat loss of building.; Table 1 RATINGS NATURAL AND PROPANE GASES
- Page 4 – DIMENSIONS; Model
- Page 5 – INSTALLATION PROCEDURE; Control Side
- Page 6 – VENTILATION & COMBUSTION AIR
- Page 7 – Warning; INSTALLATION SYSTEM PIPING; distance from; RELIEF VALVE
- Page 9 – Figure 5 - Piping Arrangements For Boiler When; Figure 6 - Bypass Piping
- Page 10 – Check Your Chimney; Minimum Vent Pipe Clearance; VENT INSTALLATION
- Page 11 – CHECK YOUR CHIMNEY; For boilers for connection to gas vents or; Figure 7 - Type B Gas Vent
- Page 13 – OPTIONAL HORIZONTAL VENTING INSTRUCTION; Table 4- Field Controls; Number Of
- Page 14 – WHAT TO DO IF YOU SMELL GAS; DANGER; GAS SUPPLY PIPING
- Page 15 – Table 6 - NATURAL GAS
- Page 16 – ELECTRICAL WIRING; Refer to Ladder Diagram from document envelope; Thermostat Installation; Electric Power Supply; CI; Figure 9 - Control Module Panel
- Page 17 – SEQUENCE OF OPERATION
- Page 18 – WIRING DIAGRAMS; Figure 10 - Control Module; Damper is not an option.
- Page 19 – Filling System With Water; STARTING YOUR BOILER; Do not add water into hot empty boiler.
- Page 20 – If you do not follow these instructions; Do NOT try to; • Use only your hand to turn the gas shutoff
- Page 21 – Electrical shock hazard. Follow instructions to turn; If your system does not give; CHECKING AND ADJUSTING
- Page 22 – Figure 14 - Main Burner Flame
- Page 23 – MAINTAINING YOUR BOILER
- Page 24 – IF YOUR SYSTEM IS NOT HEATING OR NOT GIVING ENOUGH HEAT . . .; SERVICE HINTS
- Page 25 – EQUIPMENT & OPTIONAL ACCESSORIES; Burn and scald hazard. Safety relief valve could
- Page 26 – PRESSURE SWITCH
- Page 27 – APPENDIX A - CONTROL MODULE; A.1 Installation Environment Considerations; • Do not use this appliance if any part has; Example; Figure 15 - Display Readout
- Page 29 – A.6 Boiler High Limit Temperature Controller; Figure 16 - Basic Control Algorithm Example; A.8 Troubleshooting Error Codes
- Page 30 – A.9 Intermittent Pilot
- Page 31 – Electrical shock hazard. Ignition circuit generates; Figure 17 - Pilot Flame
P/N# 240009135, Rev. C [06/2012]
RETAIN THESE INSTRUCTIONS FOR
FUTURE REFERENCE
These instructions must be affi xed on
or adjacent to the boiler.
GAS FIRED BOILER
INSTALLATION
INSTRUCTIONS
PRODUCT LITERATURE
Lennox Industries Inc.
Dallas, Texas
This boiler cannot be used with all types of
chimneys. Read these instructions carefully
before installing.
GAS-FIRED HOT WATER BOILERS
These Gas-Fired Water boilers are low pressure,
sectional cast iron boilers Design Certi
fi
ed by
CSA (Canadian Standards Association) for
use with Natural and Propane Gases. They
are constructed and hydrostatically tested for
maximum working pressure of 50 psi (pounds
per square inch) in accordance with A.S.M.E.
(American Society of Mechanical Engineers)
Boiler and Pressure Vessel Code Section IV
Standards for Cast Iron Heating Boilers.
C.S.A. Certifi ed
For Natural Gas Or Propane
Tested For 50 psi.
ASME
Working Pressure
WARNING
Improper installation, adjustment, alteration,
service, or maintenance could result in death
or serious injury. Refer to this manual for
assistance. For additional information consult
a quali
fi
ed installer, service agency, or the gas
supplier.
!
GWB8-042IE-2, GWB8-075IE-2
GWB8-112IE-2, GWB8-150IE-2
GWB8-187IE-2, GWB8-225IE-2
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 Boiler Ratings & Capacities...................... 3Dimensions ............................................. 4Installation Procedure ............................. 5Ventilation & Combustion Air .................. 6Installation System Piping ...................... 7Vent Installation ............
3 New York City MEA Number 484-84-E Vol. IV . BOILER RATINGS & CAPACITIES Model Input *Mbh Heating Capacity *Mbh **Net AHRI Rating Water *Mbh AFUE Vent Diameter (Inches) To Chimney (Category I) Horizontal Vent (Category III) GWB8-042IE-2 42.5 36 31 84.4 4 3 GWB8-075IE-2 75.0 63 55 83.4 4 3 GWB8-...
4 DIMENSIONS Model Width (A) GWB8-042IE-2 11 GWB8-075IE-2 14-1/4 GWB8-112IE-2 17-1/2 GWB8-150IE-2 20-3/4 GWB8-187IE-2 24 GWB8-225IE-2 27-1/4