Kohler K-T314-4M-BN- Installation Manual
Kohler K-T314-4M-BN– Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 3 – INSTALLATION ON FINISHED DECK OR RIM
- Page 8 – BEFORE INSTALLING SPOUT AND HANDLES; REMOVE PIPE PLUG
- Page 11 – INSTALLATION COMPLETION
- Page 12 – CALL US FOR HELP
- Page 13 – INSTRUCCIONES; CÓMO UTILIZAR LAS INSTRUCCIONES
- Page 14 – DIAGRAMA DE INSTALACIÓN
- Page 15 – INSTALACIÓN SOBRE BORDE O CUBIERTA ACABADA
- Page 16 – PARA LA INSTALACIÓN SOBRE EL SUBPISO
- Page 20 – ANTES DE INSTALAR EL SURTIDOR Y LAS LLAVES; INSTALE EL SURTIDOR
- Page 22 – INSTALE LAS LLAVES
- Page 23 – COMPLETE LA INSTALACIÓN
- Page 24 – PARA ASISTENCIA
- Page 25 – NOTICE; AVANT DE COMMENCER; COMMENT UTILISER LES INSTRUCTIONS
- Page 26 – DIAGRAMME DE RACCORDEMENT
- Page 27 – INSTALLATION SUR PLAN OU REBORD FINI
- Page 32 – AVANT D’INSTALLER LE BEC ET LES POIGNÉES; ENLEVER LE BOUCHON DE TUBE
- Page 34 – INSTALLER LES POIGNÉES
- Page 35 – COMPLÉTER L’INSTALLATION
- Page 36 – APPELEZNOUS POUR TOUTE ASSISTANCE
1012557-2-
A
2001 Kohler Co.
FINIAL FUNDAMENTALS
BATH/DECK-MOUNT BATH FAUCET
K-T314, K-T314M, K-T333, K-T333M
1. BEFORE YOU BEGIN
HOW TO USE THESE INSTRUCTIONS
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
All information in these instructions is based on the latest
product information available at the time of publication.
Kohler Co. reserves the right to make changes in product
characteristics, packaging, or availability at any time
without notice.
PRODUCT REQUIREMENTS
For roughing-in dimensions, see Fig. #1.
Ensure that any holes drilled in the deck are not
oversized. The spout requires adequate base
material strength. Spout and valve washers must
contact a maximum amount of deck surface. Spout
hole = 1” (2.5cm) maximum; and valve holes =
1-1/2” (3.8cm) maximum.
Finish deck material must fit closely to the
diameters of the plaster guards, especially the
spout plaster guard.
If holes are drilled in the sheet deck material before
placement on the deck, they must match the
plaster guard diameters.
Plaster guard diameters are approximately 1-5/8”
(4.1cm) for the valve, and 13/16” (2.1cm) for the
spout.
Installer-supplied copper tubing is to be 5/8” O.D.
(1/2” nominal).
Provide an access panel to the valves from the
underside of the deck.
Install water hammer arrestors in the supply lines
near the valves.
INSTALLER INFORMATION
Observe all local plumbing and building codes.
Products purchased separately may influence
valve placement and alignment.
Spout will require that the spout supply tube be cut
to the proper length.
Instructions are given for installation with 8”
(20.3cm) centers. For installations wider than 8”
(20.3cm) centers, adjust all roughing-in
dimensions and copper tubing lengths accordingly.
These instructions cover two methods of
installation: installation on finished deck or rim; and
installation on rough (unfinished) deck (to be
covered later with tile or other finish material).
Leave the protective sleeve on the spout supply
tube until the spout is installed. This is an O-ring
sealing surface, which may be damaged if
unprotected.
ORDERING INFORMATION
Bath/Deck-mount bath faucet:
Cross handles
K-T314-3
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Lever handles
K-T314-4
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Tee handles
K-T314-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cross handles
K-T333-3
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Lever handles
K-T333-4
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Tee handles
K-T333-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TOOLS AND MATERIALS REQUIRED
Open end/adjustable wrenches
Adjustable arc pliers
1/2” Nom. (5/8” O.D.) tubing
Tubing cutter
Hole cutting equipment
Soldering equipment and supplies
Phillips screwdriver
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
3 1012557-2- A Kohler Co., Kohler, WI U.S.A. 2. INSTALLATION ON FINISHED DECK OR RIM NOTE: For installation on rough (unfinished) deck,proceed to Section 3. Preparation: For installations with 8” (20.3cm) centersusing copper tubing (1/2” nominal, 5/8” O.D.), cut thetubing to the lengths as follows: ...
8 1012557-2- A Kohler Co., Kohler, WI U.S.A. 6. BEFORE INSTALLING SPOUT AND HANDLES REMOVE PIPE PLUG Ensure that the valves are closed (cold - fullycounterclockwise, hot - fully clockwise). Turn off the main water supply. 1/4” Pipe Plug CloseCold CloseHot WARNING: Risk of personal injury. Lines may ...
11 1012557-2- A Kohler Co., Kohler, WI U.S.A. 9. INSTALLATION COMPLETION Ensure that both faucet handles are turned off (hot -clockwise close, cold - counterclockwise close). Turn on the main water supply, and check for leaks.Repair as required. Remove the trim ring/aerator assembly. Turn on both ho...