Kohler K-2461-F2- Installation Manual
Kohler K-2461-F2– Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Siliconized acrylic caulk; must; Observe all local building codes.; Pencil
- Page 5 – Assemble the Vanity; Leveler
- Page 6 – Install the Vanity; Position the vanity against the finished wall.
- Page 7 – Install the Lavatory
- Page 8 – To remove the drawer:; Slide the drawer out on the rails until fully extended.; To reinstall the drawer:; Fully extend the rails.; Release Latch
- Page 9 – Guide d’installation; Meuble; Outils et matériels; ATTENTION : Risque d’endommagement du produit.; Mastic à; doit; être utilisé pour sécuriser le lavabo au; Crayon à papier
- Page 10 – du matériau du mur fini.
- Page 12 – Assembler le meuble; Levier
- Page 14 – Installer le meuble; Positionner le meuble contre le mur fini.
- Page 15 – Installer le lavabo
- Page 16 – Raccorder le drain et les alimentations.
- Page 17 – Pour retirer le tiroir:; Glisser le tiroir hors des rails en pleine extension.; Pour réinstaller le tiroir:; Étendre complètement les rails.; Rail
- Page 18 – Guía de instalación; Tocador; Herramientas y materiales; El sellador acrílico; se debe; utilizar para fijar el lavabo al tocador. No utilice
- Page 21 – Ensamble el tocador; Nivelador
- Page 23 – Instale el tocador; Coloque el tocador contra la pared acabada.
- Page 25 – Extienda completamente los rieles.; Riel
Installation Guide
Vanity
M
product numbers are for Mexico (i.e. K-12345
M
)
Los números de productos seguidos de
M
corresponden a México (Ej.
K-12345
M
)
Français, page “Français-1”
Español, página “Español-1”
K-2461
1061218-2-A
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Thank You For Choosing Kohler Company We appreciate your commitment to Kohler quality. Please take a fewminutes to review this manual before you start installation. If youencounter any installation or performance problems, please don’thesitate to contact us. Our phone numbers and website are listed ...
2. Assemble the Vanity NOTE: To protect the finished surface of the vanity, perform assembly tasks on a flat, padded work surface. Remove the drawer from the vanity base. Refer to the ″ Remove/Reinstall the Drawer ″ . Place the vanity base upside down on the work surface. Thread the feet into the fo...
3. Install the Vanity Position the vanity against the finished wall. Verify the vanity is level. If necessary, turn the levelers on thebottom of the vanity counterclockwise to raise the vanity, orclockwise to lower it. Mark two pilot holes an equal distance from the centerpoint ofthe mounting rail. ...