Kohler K-124-4-BN- Installation Manual

Kohler K-124-4-BN

Kohler K-124-4-BN– Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
Page: / 24

Table of Contents:

  • Page 2 – Please read all instructions before you begin.; Hacksaw or Tubing Cutter
  • Page 3 – Valve Units
  • Page 5 – Complete the Valve Installation; Elbow
  • Page 6 – Install the Handles; When using this valve in a fiberglass or acrylic
  • Page 7 – Complete the Installation; Make sure all the connections are tight.
  • Page 8 – Guide d’installation; Outils et matériaux; Veuillez lire toutes les instructions avant de commencer.; Soudure
  • Page 9 – Commencer l’installation - Alimentations de sol; ATTENTION : Risque d’endommagement du produit.; Retirer; Installation de la douche; Mur fini
  • Page 10 – Commencer l’installation - Alimentations de plafond; Aspirateur
  • Page 11 – Compléter l’installation de la valve
  • Page 12 – Compléter le mur fini.
  • Page 13 – Installer les poignées; Lorsque cette valve est utilisée en installation; Pour une poignée à six broches:
  • Page 14 – Compléter l’Installation; S’assurer de l’étanchéité des tous les raccords.
  • Page 15 – Guía de instalación; Herramientas y materiales; Lea todas las instrucciones antes de comenzar.; Suelda
  • Page 16 – Comience la instalación - Suministros en el piso; Retire los; Instalación de ducha; Válvulas
  • Page 17 – Comience la instalación - Suministros en el techo; Aspirador
  • Page 18 – Termine la instalación de la válvula; Codo
  • Page 19 – Termine la pared acabada.
  • Page 20 – Instale las manijas; En caso de utilizar esta válvula en una instalación de; Para una manija de seis dientes:
  • Page 21 – Termine la instalación; Verifique que todas las conexiones estén aseguradas.
Loading the manual

Installation Guide

Two-Handle Wall-Mount Valve and Handles

M

product numbers are for Mexico (i.e. K-12345

M

)

Los números de productos seguidos de

M

corresponden a México (Ej.

K-12345

M

)

Français, page “Français-1”

Español, página “Español-1”

K-124

117061-2-A

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Please read all instructions before you begin.; Hacksaw or Tubing Cutter

Thank You For Choosing Kohler Company We appreciate your commitment to Kohler quality. Please take a fewminutes to review this manual before you start installation. If youencounter any installation or performance problems, please don’thesitate to contact us. Our phone numbers and website are listed ...

Page 3 - Valve Units

1. Begin Installation - Floor Supplies CAUTION: Risk of product damage. Remove the plaster guards, valve units, and aspirator before applying heat to the yoke. Determine the location of the support framing for the yoke,spout, and the showerhead. Install the support framing. The yoke has two union jo...

Page 5 - Complete the Valve Installation; Elbow

3. Complete the Valve Installation NOTE: This section applies to all valve installation styles. CAUTION: Risk of product damage. Remove the plaster guards, valve units, and aspirator before applying heat to the yoke. IMPORTANT! Use thread sealant on all threaded connections. Remove the plaster guard...

Other Kohler Models

All Kohler Other