Harman Kardon PB 105 - Manual
Harman Kardon PB 105 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 4 – Harman Stove Company; 52 Mountain House Road; Table of Contents
- Page 5 – Assembly; Outdoor
- Page 7 – After the boiler is set into place the venting can be done.; Note: Use teflon pipe thread sealant or teflon; Fasten conduit to the ash base with the clamps; Floor Protector
- Page 9 – Requirements for Terminating the Venting; Venting
- Page 11 – ” pellet vent pipe (also known as PL vent) is constructed
- Page 12 – It Can Not be installed in a chimney serving another; The chimney should be cleaned and or inspected be-; Venting Installation
- Page 13 – Outside Air; NOTE: If outside air is installed, the inlet cover; Installation
- Page 14 – Main Wiring Installation
- Page 20 – Draft Test Procedure; After the venting is completed, the firebox low draft; Don’t forget to turn the feed adjuster back to #4.
- Page 21 – Max Temp dial; Operation
- Page 22 – Setting The Boiler Temperature; Without the Outdoor Air Temperature Sensor Installed; To set the maximum boiler water temperature,; Control Board Operation; Aquastat Sensor - This sensor is located in the
- Page 24 – This resets the control in addition to turning it off.; Starting A Fire Automatically; This is usually a weekly maintenance procedure.
- Page 26 – Fill hopper with pellets and remove ashes as; Type of Fuel; Use pelletized wood only. The lower the ash; Store pellets in the manufacturer’s wrapping; Lighting the fire manually will not be necessary unless; Apply starting gel as shown in Fig.15
- Page 27 – NOTE: Stirring the starting gel into the pellets usu-; CAUTION: A vapor flash could occur if too much; NOTE: When the Switch is set to Manual igniter
- Page 28 – Cleaning the burnpot air chamber:; This area only needs to be cleaned twice a heating season,
- Page 29 – Maintenance; Ash Removal; It is recommended to remove the ashes when the boiler; Open Ash Door; Lift the latch and open the door as shown in fig. 21.; Disposal of Ashes; Ashes should be placed in a metal container with a; Remove Ash Pan; Always wear gloves to remove ash pan. Grab the ash
- Page 30 – Cleaning
- Page 31 – Cleaning the Tube heat Exchangers:; Remove the combustion blower heat shield.There
- Page 33 – Feeder Parts
- Page 34 – Specifications
- Page 36 – Parts List; ITEM NUMBER; OWNERS MANUAL
- Page 37 – Warranty
- Page 38 – Testing Label
- Page 39 – NOTES
R4
SAFETY NOTICE
PLEASE READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND USE YOUR NEW BOILER. FAILURE TO FOL-
LOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE, BODILY INJURY, OR EVEN DEATH.
FOR USE IN THE U.S. AND CANADA. SUITABLE FOR INSTALLATION IN MOBILE HOMES
IF THIS HARMAN PELLET BOILER IS NOT PROPERLY INSTALLED, A HOUSE FIRE MAY RESULT. FOR YOUR SAFETY,
FOLLOW INSTALLATION DIRECTIONS.
CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION
REQUIREMENTS IN YOUR AREA.
CONTACT YOUR LOCAL AUTHORITY (SUCH AS MUNICIPAL BUILDING DEPARTMENT, FIRE DEPARTMENT, FIRE
PREVENTION BUREAU, ETC.) TO DETERMINE THE NEED FOR A PERMIT.
CETTE GUIDE D'UTILISATION EST DISPONIBLE EN FRANCAIS. CHEZ VOTRE CONCESSIONNAIRE DE HARMAN STOVE
COMPANY.
SAVE THESE INSTRUCTIONS
The Harman PB 105 Pellet Boiler
Installation & Operating Manual
“Ce manuel est disponible en Français sur demande”
R1
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
4 Assembly 4 Venting 8 Installation 11 Operation 2 0 Maintenance 2 7 Troubleshooting 3 1 Feeder Parts 3 2 Specifications 3 3 Wiring Diagram 3 4 Parts List & Options 3 5 Warranty 3 6 Testing Label 3 7 Quick Reference Start-Up Back Cover Please read this entire manual before you install and use yo...
5 Assembly T e m p er a tu re / P ress u re G a u g e Aq u as ta t W e ll Pr es su re R e li e f V a lv e Bl a nk Co ve r* H eat E xc ha n ger Cl ea no u t R o d H a nd le s A cc es s C o ve r T o S ec o nd ar y A sh C ha m b er R e m o ve C o ve r to a c ce ss n u ts to f as te n F lu e T u n ne l ...
7 Design:The first thing that needs to be done is deciding where andhow the boiler will be installed. Things that need to be taken into consideration are theintended use of the boiler for example, is the boiler going tobe used as your primary heating system or is it going to beused as a secondary or...