Grindmaster RAPS400E - Manual
Grindmaster RAPS400E – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Installation; Standard; WA R N I N G
- Page 4 – Adjustments; Brew Volume, Brew Timer; Before making the timer adjustment, do the following:; Adjusting the Timer; Standard single batch timer:; Electrical Shock Hazard!
- Page 6 – To Adjust the Bypass:; Thermostat Adjustment; Standard Mechanical Thermostat:
- Page 8 – Cleaning; Dispose of grounds and rinse brew basket.
- Page 9 – Urn cleaners that have been used successfully:; Service; common service tasks
- Page 11 – Replace level control.
- Page 12 – Problem
- Page 13 – Brewing Problems
- Page 14 – Parts Illustration for Models P300E & P400E; Item; FRONT
- Page 15 – Parts Illustration for Model RAP400E
- Page 16 – Parts Illustration for Model RAPS400E
- Page 17 – Parts Illustration for Model VSB-400
- Page 18 – Parts Illustration for Shuttle CS-LL; FAUCET MODEL ES; GAUGE ASSEMBLY
- Page 27 – Wiring Diagram for P300E/P400E, with 1 Batch Timer
- Page 28 – Wiring Diagram for P300E/P400E, with 2 Batch Timer
- Page 33 – Notes
- Page 36 – Grindmaster Corporation; WARRANTY; GENERAL WARRANTY INFORMATION; Coverage is not included for labor needed or caused by:; HOW TO OBTAIN WARRANTY SERVICES; by Grindmaster Corporation’s Service Dept.
Shuttle Brewer & Airpot/Shuttle Brewers
Operation and Instruction Manual
For Models P300E, P400E, RAP300E,
RAP400E, RAPS300E, RAPS400E
Installation:
See rough-in drawings in this manual for dimensions and locations of
electric and water input.
Set-Up/Position
1) Remove the brewer from the packing material and attach its legs.
2) Position the brewer on a strong, stable table or counter. Check the
level front to back and side to side. Adjust the legs to the correct level.
IMPORTANT:
THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE
FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS
MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC
CODE, NATIONAL PLUMBING CODE, AND ANY LOCAL
ORDINANCES.
The electric and water hook-up locations are behind the front panel.
Remove the four screws fastening this panel for access to these
connections.
Table of Contents
Installation and Start-up ....................................... 1-2
Operation .......................................................... 3
Adjustments ........................................................ 4-7
Care and Cleaning ............................................... 8-9
Service ............................................................... 9-10
Troubleshooting
Filling Problems .................................... 11
Heating Problems ................................. 12
Brewing Problems ................................ 13
Parts Illustrations
Models P300E & P400E ....................... 14
Model RAP400E ..................................... 15
Model RAPS400E ................................... 16
VSB-400................................................ 17
Shuttle CS-LL .......................................... 18
Rough-In Drawings
Model P-300.......................................................... 19
Model P-400 ......................................... 20
Model RAP-300 ......................................... 21
Model RAP-400 ........................................ 22
Model RAPS-300 ....................................... 23
Model RAPS-400 ..................................... 24
VSB-300 .................................................. 25
VSB-400 ................................................ 26
Wiring Diagrams
P300E/P400E with 1 Batch Timer ......... 27
P300E/P400E with 2 Batch Timer........ 28
R A P 3 0 0 E / R A P 4 0 0 E ............................... . 2 9
RAPS300E/RAPS400E........................30
Drawing #091-548 .................................31
Drawing #091-182 ....................................32
Warranty ................................................................... 36
Water Hook-up
1) The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water.
2) Use 3/8" copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection
to the fill valve is 3/8" flare.
3) Water line pressure must be from 30 to 70 psi.
4) Hot (up to 160°F) or cold water may be used. Hot water offers faster recovery between brews.
5) Install a shut-off valve near the brewer.
6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water
has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting
type if cold water is used. Contact our parts department to select the filter for your conditions.
© Grindmaster Corporation, 1998
PRINTED IN U.S.A.
0306 FORM # AM-309-06
Part # 090-077
Prior authorization must be obtained from Grindmaster Corporation for all warranty claims.
Grindmaster Corporation
4003 Collins Lane
Louisville, KY 40245 USA
(502) 425-4776
(800) 695-4500 (USA & Canada only)
(800) 568-5715 (Technical Service Only)
FAX (502) 425-4664
www.grindmaster.com
WA R N I N G
ELECTRIC SHOCK HAZARD!
Installation of this appliance should be performed by
qualified service personnel only. Improper installation could
result in electrocution.
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Page 2 Shuttle Brewers & Airpot/Shuttle Brewers Installation (con't) Electric Hook-up 1) The electric ratings for your brewer are printed on its nameplate. Typical electric ratingsare:P300, P400, RAP300, RAP400Optional 120/208V, 3.8kW, 18A or 120/240V 5.0kW, 21A, 1 phase Standard 120/208V, 5.0kW...
Page 4 Adjustments All adjustable components are located under the top cover. To access these parts: 1) Shut off the electric line to the brewer or unplug the brewer. 2) Remove the single screw fastening the top cover. Remove the top cover. 3) Pull forward and lift off the top cover. Brew Volume, Br...
Page 6 To Adjust the Bypass: 1) Shut off and open brewer as described at the beginning of the adjustments section. 2) Locate the bypass valve for the brew head you wish to adjust. Valve is on the right and frontof the BREW valve. 3) Open the valve (counter clockwise) to the desired setting. Use the ...