Grindmaster RAPS300E - Manual

Grindmaster RAPS300E

Grindmaster RAPS300E – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
Page: / 36

Table of Contents:

  • Page 2 – Installation; Standard; WA R N I N G
  • Page 4 – Adjustments; Brew Volume, Brew Timer; Before making the timer adjustment, do the following:; Adjusting the Timer; Standard single batch timer:; Electrical Shock Hazard!
  • Page 6 – To Adjust the Bypass:; Thermostat Adjustment; Standard Mechanical Thermostat:
  • Page 8 – Cleaning; Dispose of grounds and rinse brew basket.
  • Page 9 – Urn cleaners that have been used successfully:; Service; common service tasks
  • Page 11 – Replace level control.
  • Page 12 – Problem
  • Page 13 – Brewing Problems
  • Page 14 – Parts Illustration for Models P300E & P400E; Item; FRONT
  • Page 15 – Parts Illustration for Model RAP400E
  • Page 16 – Parts Illustration for Model RAPS400E
  • Page 17 – Parts Illustration for Model VSB-400
  • Page 18 – Parts Illustration for Shuttle CS-LL; FAUCET MODEL ES; GAUGE ASSEMBLY
  • Page 27 – Wiring Diagram for P300E/P400E, with 1 Batch Timer
  • Page 28 – Wiring Diagram for P300E/P400E, with 2 Batch Timer
  • Page 33 – Notes
  • Page 36 – Grindmaster Corporation; WARRANTY; GENERAL WARRANTY INFORMATION; Coverage is not included for labor needed or caused by:; HOW TO OBTAIN WARRANTY SERVICES; by Grindmaster Corporation’s Service Dept.
Loading the manual

Shuttle Brewer & Airpot/Shuttle Brewers

Operation and Instruction Manual

For Models P300E, P400E, RAP300E,

RAP400E, RAPS300E, RAPS400E

Installation:

See rough-in drawings in this manual for dimensions and locations of
electric and water input.

Set-Up/Position

1) Remove the brewer from the packing material and attach its legs.

2) Position the brewer on a strong, stable table or counter. Check the

level front to back and side to side. Adjust the legs to the correct level.

IMPORTANT:

THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE
FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS
MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC
CODE, NATIONAL PLUMBING CODE, AND ANY LOCAL
ORDINANCES.

The electric and water hook-up locations are behind the front panel.
Remove the four screws fastening this panel for access to these
connections.

Table of Contents

Installation and Start-up ....................................... 1-2
Operation .......................................................... 3
Adjustments ........................................................ 4-7
Care and Cleaning ............................................... 8-9
Service ............................................................... 9-10
Troubleshooting

Filling Problems .................................... 11
Heating Problems ................................. 12
Brewing Problems ................................ 13

Parts Illustrations

Models P300E & P400E ....................... 14
Model RAP400E ..................................... 15

Model RAPS400E ................................... 16

VSB-400................................................ 17
Shuttle CS-LL .......................................... 18

Rough-In Drawings

Model P-300.......................................................... 19
Model P-400 ......................................... 20
Model RAP-300 ......................................... 21
Model RAP-400 ........................................ 22
Model RAPS-300 ....................................... 23
Model RAPS-400 ..................................... 24
VSB-300 .................................................. 25
VSB-400 ................................................ 26

Wiring Diagrams

P300E/P400E with 1 Batch Timer ......... 27
P300E/P400E with 2 Batch Timer........ 28
R A P 3 0 0 E / R A P 4 0 0 E ............................... . 2 9
RAPS300E/RAPS400E........................30
Drawing #091-548 .................................31
Drawing #091-182 ....................................32

Warranty ................................................................... 36

Water Hook-up

1) The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water.
2) Use 3/8" copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection

to the fill valve is 3/8" flare.

3) Water line pressure must be from 30 to 70 psi.
4) Hot (up to 160°F) or cold water may be used. Hot water offers faster recovery between brews.
5) Install a shut-off valve near the brewer.
6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water

has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting
type if cold water is used. Contact our parts department to select the filter for your conditions.

© Grindmaster Corporation, 1998
PRINTED IN U.S.A.

0306 FORM # AM-309-06
Part # 090-077

Prior authorization must be obtained from Grindmaster Corporation for all warranty claims.

Grindmaster Corporation

4003 Collins Lane
Louisville, KY 40245 USA
(502) 425-4776
(800) 695-4500 (USA & Canada only)
(800) 568-5715 (Technical Service Only)
FAX (502) 425-4664
www.grindmaster.com

WA R N I N G

ELECTRIC SHOCK HAZARD!

Installation of this appliance should be performed by
qualified service personnel only. Improper installation could
result in electrocution.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Installation; Standard; WA R N I N G

Page 2 Shuttle Brewers & Airpot/Shuttle Brewers Installation (con't) Electric Hook-up 1) The electric ratings for your brewer are printed on its nameplate. Typical electric ratingsare:P300, P400, RAP300, RAP400Optional 120/208V, 3.8kW, 18A or 120/240V 5.0kW, 21A, 1 phase Standard 120/208V, 5.0kW...

Page 4 - Adjustments; Brew Volume, Brew Timer; Before making the timer adjustment, do the following:; Adjusting the Timer; Standard single batch timer:; Electrical Shock Hazard!

Page 4 Adjustments All adjustable components are located under the top cover. To access these parts: 1) Shut off the electric line to the brewer or unplug the brewer. 2) Remove the single screw fastening the top cover. Remove the top cover. 3) Pull forward and lift off the top cover. Brew Volume, Br...

Page 6 - To Adjust the Bypass:; Thermostat Adjustment; Standard Mechanical Thermostat:

Page 6 To Adjust the Bypass: 1) Shut off and open brewer as described at the beginning of the adjustments section. 2) Locate the bypass valve for the brew head you wish to adjust. Valve is on the right and frontof the BREW valve. 3) Open the valve (counter clockwise) to the desired setting. Use the ...

Other Grindmaster Models

All Grindmaster Other