Grindmaster RAPS200E - Manual

Grindmaster RAPS200E

Grindmaster RAPS200E – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
Page: / 20

Table of Contents:

  • Page 3 – Installation; DO NOT TRANSPORT BREWER WITHOUT DRAINING WATER TANK FIRST.; WARNING
  • Page 4 – Operation; CAUTION: HOT LIQUID HAZARD
  • Page 5 – Adjustments; WARNING: ELECTRIC SHOCK HAZARD; Brew Volume Adjustment; Timer Adjustment
  • Page 6 – Thermostat Adjustment; Cleaning; WARNING: BURN HAZARD
  • Page 8 – Service
  • Page 12 – Exploded View for the P200-E
  • Page 13 – Exploded View for the P200 (G version only)
  • Page 14 – Exploded View for the RAPS200-E
  • Page 15 – Exploded View for the RAPS200 (G version only)
  • Page 20 – WARRANTY; GENERAL WARRANTY INFORMATION; HOW TO OBTAIN WARRANTY SERVICES; Grindmaster CorporationTM
Loading the manual

P200E Shuttle & RAPS200E

Airpot/Shuttle Brewer Series

Operation and Instruction Manual

Installation

WARNING: ELECTRIC SHOCK HAZARD!

INSTALLATION OF THIS APPLIANCE SHOULD BE PERFORMED BY
QUALIFIED SERVICE PERSONNEL ONLY. IMPROPER
INSTALLATION COULD RESULT IN ELECTROCUTION.

See rough-in drawings in this manual for dimensions and locations of
electric and water input.

Set-Up/Position

1)

Remove the brewer from the packing material and attach its legs.

2)

Position the brewer on a strong, stable table or counter. Check
the level front to back and side to side. Adjust the legs to the
correct level.

IMPORTANT:

THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE
FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS
MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC
CODE, NATIONAL PLUMBING CODE, AND ANY LOCAL
ORDINANCES.

Water Hook-up

1) Water inlet (supply) fitting is located at rear of unit.

2) Use 1/4" copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection

is 1/4" flare.

3) Water line pressure must be from 30 to 70 psi.

4) Hot (up to 160F) or cold water may be used. Hot water offers faster recovery between brews, (Use cold water only

if in-line water filters are implemented before the brewer).

5) Install a shut-off valve near the brewer.

6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water

has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting
type if cold water is used. Contact our Customer Service Department to select the filter for your conditions.

© Grindmaster Corporation, 1996
Printed in the U.S.A.

1004 FORM # AM-308-06

Part # A090-085

Prior authorization must be obtained from
Grindmaster for all warranty claims.

Table of Contents

Installation and Start-up ......................................1-2

Operation

............................................................3

Adjustments ..........................................................4-5

Cleaning

..........................................................5-6

Service

............................................................7

Troubleshooting

Filling Problems .................................... 8

Heating Problems ................................. 9

Brewing Problems ................................ 10

Exploded View for P200-E ....................................11

Exploded View for P200 (G version)......................12

Exploded View for RAPS200-E..............................13

Exploded View for RAPS200 (G version) ..............14

Rough-In Drawing for P200-E ................................15

Rough-In Drawing for RAPS200-E ........................16

Wiring Diagram for P200E/RAPS200-E ..........17

Grindmaster Corporation™

4003 Collins Lane
Louisville, KY 40245 USA
(502) 425-4776 (800) 695-4500
(800) 568-5715 (Technical Service Only)
FAX (502) 425-4664
www.grindmaster.com

!

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - Installation; DO NOT TRANSPORT BREWER WITHOUT DRAINING WATER TANK FIRST.; WARNING

Page 2 P200/RAPS200 Brewers Installation (con't.) Electric hook-up 1) The electric ratings for your brewer are printed on its nameplate. Typical electric ratingsare: 120V, 1.65 kW, 15 Amp, 1 phase. 2) The brewer should be connected to its own circuit with a fused disconnect switch or a circuit break...

Page 4 - Operation; CAUTION: HOT LIQUID HAZARD

Page 3 Operation CAUTION: HOT LIQUID HAZARD WATER USED FOR BREWING COFFEE IS VERY HOT. USE CAUTIONWHEN BREWING, POURING, OR TRANSPORTING COFFEE. ACCIDENTALSPILLS MAY RESULT IN SEVERE BURNS. 1) Place an empty, warm Shuttle under the brew head. Turn on the warmer once a Shuttle is in place, or place a...

Page 5 - Adjustments; WARNING: ELECTRIC SHOCK HAZARD; Brew Volume Adjustment; Timer Adjustment

Page 4 Adjustments WARNING: ELECTRIC SHOCK HAZARD DANGEROUS ELECTRIC VOLTAGES ARE PRESENT NEAR ADJUSTABLECOMPONENTS. ALL ADJUSTMENTS SHOULD BE PERFORMED BYQUALIFIED SERVICE PERSONNEL ONLY. All adjustable components are located under the top cover. To access these parts: 1) Unplug the brewer. 2) Remo...

Other Grindmaster Models

All Grindmaster Other